W912DW23R0001- AFD Fish Passage Sources Sought_Attachment 2.pdf.docx

DOCX document 20 KB Posted

Attached to
Albeni Falls Dam Fish Passage Federal contract opportunity
Solicitation number
W912DW23R0001
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

View the file

Other files for this federal contract opportunity

Other files attached to Albeni Falls Dam Fish Passage, newest first.
File Type Posted
W912DW23R0001- Attachment 1- Preliminary Layout of the Major Features of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

Firm’s response to this Synopsis shall be limited to 5 pages and shall include the following information:

1. Firm’s name, address, point of contact, phone number, and e-mail address.

2. Firm’s interest in submitting a proposal on the solicitation when it is issued.

3. Description of the firm’s technical qualifications. Information should include but is not limited to specialized experience, technical competence, and capability to design and construct the Albeni Falls Fish Passage Facility Project.

4. Firm’s capability to perform a contract of this magnitude and complexity. Provide at least two (2) but no more than three (3) projects completed/being completed, including the architect-engineer and construction members. Projects must be between $10,000,000.00 - $50,000,000, or greater.

5. Do you maintain in-house Architect & Engineering (including 100% design for all disciplines) services capability or do you rely primarily on outside sources for design services?

6. Are you able to provide, in-house or otherwise, licensed Design Engineers (as indicated below) and registered to practice in the United States? If so, please indicate available licensures/registrations and years of experience for the following disciplines: (a) Mechanical, (b) Civil, (c) Electrical, including control systems, (d) Structural, (e) Architectural, and (f) Geotechnical, including blasting and tunneling.

7. Firm’s Business Size – LB, SB, 8(a), HUB Zone, SDVOSB, or EDWOSB or WOSB.

8. Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information, as appropriate.

9. Firm’s Bonding Capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from bonding company. Firms must be able to bond a single project up to $70,000,000.00.

10. Do you believe all aspects of this requirement could be performed by the small business sector?

|_| Yes |_| No

If yes, as a |_| large business/|_| small business, what estimated percentage do you think can be subcontracted out to small business

|_| Small Business (SB) ____% |_| Small Disadvantage Business (SDB) ____% |_| Woman-Owned SB (WOSB) ____% |_| Veteran-Owned SB (VOSB) ____% |_| Service-Disabled VOSB (SDVOSB) ____% |_| Historically Underutilized Business Zone (HUBZone) ____%

If no, please specify/describe which areas best suited for subcontracting to the small business sector. Identify your intentions to team or subcontract any work and what percentage of work you are capable of in your own right and what percentage you are subcontracting.

If Subcontractor functions – If you were a subcontractor, what functions did you have? Were they core functions? What percentage of the contract did you handle?

W912DW23R0001