AMEND2-23Q4000.pdf
PDF 823 KB Posted
- Attached to
- ENVIRONMENTAL REMEDIATION PROGRAM SERVICES FAIRCHILD AIR FORCE BASE PFAS GAC SYSTEM Federal contract opportunity
- Solicitation number
- W912DW-23-Q-4000
About this file
This document is an amendment to a solicitation for environmental remediation program services at Fairchild Air Force Base in Washington. The amendment revises the performance work statement and pricing schedule to update requirements.
The solicitation seeks project management, planning, reporting and completion services. It also requires water line replacement and fixture repair or replacement at multiple housing units, including replacing water heaters, dishwashers, washing machines, and pressure tanks. Additional work includes installing water softeners, replacing frost free hydrants and lines up to seven maximum per unit, and restoring impacted floors, walls, ceilings and landscaping. The response due date is December 27, 2022. The Department of the Army Corps of Engineers Engineering District in Seattle issued the solicitation. Pricing is firm fixed price by line item number.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_1-19_dtd 20DEC2022.pdf | ||
| Attached 2_Rev_PWS_dtd19DEC2022 Track Changes.pdf | ||
| FAFB GAC System Contractor Site Visit Sign In Sheet.pdf | ||
| RW-20 Yard.pdf | ||
| RW-20 site visit photos.pdf | ||
| RW296 Site Visit photos.pdf | ||
| RW296 SITE VISIT BRIEF PDF.pdf | ||
| 23Q4000_Questions and Answers_Dec 8 2022.pdf | ||
| QA_1-19_dtd 16DEC2022.pdf | ||
| Attached 2_Rev_PWS FAFB Emergency Contract RW-296 and RW-20 Repair 6DEC2022.pdf | ||
| AMEND1-23Q4000.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the attached revised Performance Work Statement (PWS) dated 19 December 2022. The attached PWS dated 19 December 2022 hereby replaces the previously issued PWS dated 2 December 2022.
Additionally, this amendment incorporates the attached revised Pricing Schedule dated 19 December 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Dec-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW23Q4000
X 9B. DATED (SEE ITEM 11)
02-Dec-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Dec-2022
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW23Q4000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
CLIN 1000 - Project Management, Planning, and Reporting Requirements
To:
CLIN 0001 - Project Management, Planning, and Reporting Requirements
CLIN 0002
The CLIN description has changed from RW-20 – Repair water line to RW-20 Replace water lines and fixtures..
CLIN 2000 - RW-20 – Repair water line.
CLIN 0002 - RW-20 Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max). Restore impacted floors, walls, and ceilings in home and in GAC sheds. Restore impacted lawn
CLIN 0003
The CLIN description has changed from RW-20 – Additional Support: Intrusive Wo to RW-20 - Pressure Tank Replacement.
The CLIN extended description has changed from:
CLIN 2001-RW-20 – Additional Support: Intrusive Work Plan Update. – Replace water lines and fixtures. Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max). Restore impacted floors, walls, and ceilings in home and in GAC sheds. Restore impacted lawn
CLIN 0003 - Pressure Tank Replacement
CLIN 0004
CLIN 3000. RW-296 – Replace water lines and fixtures. Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max).
Restore impacted floors, walls, and ceilings in home and in GAC sheds. Restore impacted lawn
CLIN 0004. RW-296 – Replace water lines and fixtures. Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max).
CLIN 0005
CLIN 3001.RW-296 – Replace water lines and fixtures. Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max).
CLIN 0005.RW-296 – Replace water lines and fixtures. Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max).
CLIN 0006
CLIN 4000, Completion Report
CLIN 0006, Completion Report
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Instructions 2 02-DEC-2022 Attachment 2 Revised Performance
Work Statement
35 06-DEC-2022
Attachment 3 Wage Determination 2015-5537
11 27-JUN-2022
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Instructions 2 02-DEC-2022 Attachment 2 Revised Performance
Work Statement
35 19-DEC-2022
Attachment 3 Wage Determination 2015-5537
11 27-JUN-2022
(End of Summary of Changes)
SEE ADDENDUM
(No Collect Calls)
W912DW23Q4000 02-Dec-2022
b. TELEPHONE NUMBER
206-764-6804
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 27 Dec 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DW9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LINDA S OBRIEN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
206-764-6817FAX:
TEL: 206-316-3168 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$22,000,000
NAICS:
562910
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF31
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Project Management Plan
FFP
CLIN 0001 - Project Management, Planning, and Reporting Requirements FOB: Destination
NET AMT
0002 1 Job RW-20 Replace water lines and fixtures.
FFP
CLIN 0002 - RW-20 Replace Hot Water Heater, Dish washer, Washing Machine.
Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max). Restore impacted floors, walls, and ceilings in home and in GAC sheds. Restore impacted lawn
0003 1 Job RW-20 - Pressure Tank Replacement
FFP
CLIN 0003 - Pressure Tank Replacement
0004 1 Job RW-296 – Replace water lines and fixture
FFP
CLIN 0004. RW-296 – Replace water lines and fixtures. Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max). Restore impacted floors, walls, and ceilings in home and in GAC sheds. Restore impacted lawn
0005 1 Job RW-296 – Pressure tank Replacement
FFP
CLIN 0005.RW-296 – Replace water lines and fixtures. Replace Hot Water Heater, Dish washer, Washing Machine. Service Pressure tank. Install Water Softener. Frost Free Hydrants and line replacement (7 FFH max). Restore impacted floors, walls, and ceilings in home and in GAC sheds. Restore impacted lawn
0006 1 Job Completion Report
FFP
CLIN 0006, Completion Report
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
File details come from the government source that posted it. Updated .