This document is an amendment to a solicitation for grounds maintenance services at Chief Joseph Dam and Rufus Woods Lake. The amendment extends the response date to May 4th, 2020, schedules a site visit on April 28th, and changes the period of performance for CLIN 0001 to May 18th, 2020 through March 31st, 2021. The solicitation seeks a non-personal services contract to provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for grounds maintenance. The selected contractor must register in the System for Award Management and provide pricing for all items to be considered for award. The Department of the Army Corps of Engineers Engineering District Seattle is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to CHIEF JOSESPH DAM, GROUNDS MAINTENANCE, newest first.
File Type Posted
Directions for Site Visit.pdf PDF
W912DW20Q0003.pdf PDF
Copy of Proposal - Pricing Schedule - Grounds Maintenance.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The follow ing amendment to this solicitation is is as follow s:

1. The period of solicition from 31 March 2020 to 30 April 2020, is extended to 4 May 2020.

2. Site Visit. A one time only site visit w ill occurn on 28 April 2020 LOCAL TIME. Site visit instruction are attached as an enclosure.

3. Change Period of Performance (POP) for CLIN 0001 to 18 May 2020 to 31 March 2021

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW20Q0003

X 9B. DATED (SEE ITEM 11)

31-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Apr-2020

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW20Q0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-MAY-2020 TO

31-MAR-2021

N/A N/A

FOB: Destination

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 18-MAY-2020 TO

31-MAR-2021

N/A N/A

FOB: Destination

The following have been modified:

INSTRUCITONS TO QUOTERS

Instructions to Quoters

1. REPRESENTATIONS AND CERTIFICATIONS CONTAINED HEREIN MUST BE COMPLETED BY

QUOTERS AND RETURNED WITH QUOTES:

IF YOUR REPRESENTATIONS AND CERTIFICATIONS ARE REGISTERED IN THE SYSTEM

FOR AWARD MANAGEMENT (SAM) CHECK HERE . IF NOT, YOU CAN

REGISTER ONLINE AT www.beta.SAM.gov

2. Request for Quote No.: W912DW20Q0003

Closing Date and Time: 30 April,4 May 2020, 12:00 P.M. Pacific Time

3. Faxed quotes will NOT be accepted. Email quotes shall be accepted before closing at e-mail address-rodolfo.a.forde@usace.army.mil. All emailed offers shall contain the RFQ No. W912DW-20-Q-0003 in the subject line.

4. PROSPECTIVE CONTRACTORS: Contractors are required to be registered in the System for Awards

Management (SAM) for awards resulting from solicitations.

This rule more efficiently implements the Debt Collection Improvement Act of 1996, as it requires contractors to be registered in SAM for consideration of future solicitations, awards, and payment.

Registration is required prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement from a solicitation.

LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE A QUOTER INELIGIBLE FOR

AWARD. The web site may be accessed at beta.SAM.

5. Award shall be made to the lowest priced; responsible quoter, whose quote conforms to the requirements of the solicitation.

6. Required Submittals:

a) Signed and dated STANDARD FORM 1449 (Solicitation/ Contract/ Order for Commercial Items).

b) Signed and dated STANDARD FORM 30, if applicable, for any Amendments to the solicitation.

c) Completed pricing information for all CLIN items.

d) Required items in #7 below.

7. The following information is required with quotation submission:

Federal Taxpayer’s ID Number:

DUNS Number:

Cage Code Number This requires registration in SAM, web site for registration is www.beta.SAM.gov.

Remit to Address:

Company Name:

Address:

City/State/Zip:

Phone & Fax Numbers:

Point of Contact:

E-Mail Address:

The quoter must provide pricing for all items in the solicitation for its quote to be acceptable to the Government.

All quoted items must meet the requirements of the Request for Quote (RFQ) including specifications stated in all attachments.

Multiple quotes are not accepted for this RFQ. If multiple quotes are received only one quote (as determined by the Contracting Officer) will be evaluated by the Government. The quote shall be determined acceptable based on the date and time received.

The contractor should list any special features or warranty information applicable to the quoted product(s).

(End of Summary of Changes)