W912DW19B0011_Squalicum_Bid_Abstract_(Final).pdf

PDF 386 KB Posted

Attached to
Squalicum Federal Navigation Channel Dredging Federal contract opportunity
Solicitation number
W912DW19B0011
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

W912DW19B0011- Bid Abstract

View the file

Other files for this federal contract opportunity

Other files attached to Squalicum Federal Navigation Channel Dredging, newest first.
File Type Posted
W912DW19B0011_R0002-Squalicum.pdf PDF
W912DW19B0011R0001-Squalicum.pdf PDF
W912DW19B0011-Squalicum_Dredging_(Final).pdf PDF
W912DW19B0011-Squalicum_Dredging_PLANS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. Solicitation No. W912DW19B0011

2. Date Issued: 22 Aug 2019

3. Date Opened: 23 Sep 2019

4. Issuing Office:

Department of the Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle, WA 98124-2255

5. Project Title:

Small Business Set-Aside

6. Number of Amendments Issued:

1st Apparent low = Curtin Maritime Corp, $2,432,000.00.

% Difference From GE: -57%

2nd Apparent low = American Construction Co. Inc., $2,996,975.00.

% Difference From GE: -37%

3rd Apparent low =

% Difference From GE:

SIGNATURE: Bid Opening Officer: Gregory Cook

FY19 Squalicum Waterway Maintenance Dredging, Bellingham, WA

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

SOLICITATION 19B0011 FY19 Squalicum Maintenance Dredging

12. OFFERS

NO. 1 NO. 2

A. Company: Curtin Maritime Corp. A. Company: American Construction Co. Inc.

Address: 1500 Pier C Street Berth 571500 Pier C Street Berth 57 Address: 1501 Taylor Way City, State: Long Beach, CA 90813 City, State: Tacoma, WA 98421 email: kelly@curtinmaritime.com (562) 983-7257 email: kevinc@americanconstco.com (253) 254-0118 B. Bid Security Type/Amt : 20% Bid Bond-YES B. Bid Security Type/Amt : 20% Bid Bond-YES Business Size: SB Business Size: SB

C. Amendments Acknowledged: 2 C. Amendments Acknowledged: 2

BASE ITEMS BASE ITEMS

1100 1 265,000.00$ NA 265,000.00$ 1100 1 310,000.00$ NA 310,000.00$

1200 208,000 4.50$ NA 936,000.00$ 1200 208,000 6.70$ NA 1,393,600.00$

1300 208,000 1.00$ NA 208,000.00$ 1300 208,000 1.00$ NA 208,000.00$

1400 208,000 3.00$ NA 624,000.00$ 1400 208,000 2.00$ NA 416,000.00$

1500 4,000 4.00$ NA 16,000.00$ 1500 4,000 21.00$ NA 84,000.00$

1600 4,000 1.00$ NA 4,000.00$ 1600 4,000 3.00$ NA 12,000.00$

1700 4,000 3.00$ NA 12,000.00$ 1700 4,000 15.00$ NA 60,000.00$

1800 5 500.00$ NA 2,500.00$ 1800 5 275.00$ NA 1,375.00$

TOTAL BASE ITEMS 2,067,500.00$ TOTAL BASE ITEMS 2,484,975.00$

OPTIONAL ITEMS OPTIONAL ITEMS

1900 11,000 4.50$ 1 49,500.00$ 1900 11,000 6.70$ 1 73,700.00$ 2000 6,000 4.50$ 4 108,000.00$ 2000 6,000 6.70$ 4 160,800.00$ 2100 11,000 1.00$ 1 11,000.00$ 2100 11,000 1.00$ 1 11,000.00$ 2200 6,000 1.00$ 4 24,000.00$ 2200 6,000 1.00$ 4 24,000.00$ 2300 11,000 3.00$ 1 33,000.00$ 2300 11,000 2.00$ 1 22,000.00$ 2400 6,000 3.00$ 4 72,000.00$ 2400 6,000 2.00$ 4 48,000.00$ 2500 500 4.00$ 8 16,000.00$ 2500 500 21.00$ 8 84,000.00$ 2600 500 1.00$ 8 4,000.00$ 2600 500 3.00$ 8 12,000.00$ 2700 500 8.00$ 8 32,000.00$ 2700 500 15.00$ 8 60,000.00$ 2800 1 250.00$ 60 15,000.00$ 2800 1 275.00$ 60 16,500.00$

TOTAL OPTIONAL ITEMS 364,500.00$ TOTAL OPTIONAL ITEMS 512,000.00$

TOTAL BASE & OPTIONAL 2,432,000.00$ TOTAL BASE & OPTIONAL 2,996,975.00$

COE SEATTLE DISTRICT (VERSION NAV 9/19)

Standard Form 1419 (2001)

7A. ITEM NO.

7C. EST

QTY 7E. UNIT PRICE

7F. MAX POT

EXERCISE OF

OPT

7G. MAX EXTENDED

AMOUNT 7A. ITEM NO.

7C. EST

QTY 7E. UNIT PRICE

7G. MAX EXTENDED

AMOUNT

7F. MAX POT

EXERCISE OF

OPT

8. GOVERNMENT ESTIMATE

(Check A, B or C and Complete D, E F) A. Hired Labor B. Reasonable Contract (w/out profit) C. Reasonable Contract (w/ profit)

BASE ITEMS

1100 Mobilization and Demobilization 1 JOB 472,450.00$ NA 472,450.00$

Dredge Squalicum Waterway and Turning Basin (Sta. 0+00 to 33+00) 208,000 CY 4.60$ NA 956,800.00$

Cost to transport dredged material to the Bellingham Disposal Water Site (Sta. 0+00 to 33+00) 208,000 CY 3.05$ NA 634,400.00$

Incremental cost to transport and dispose dredged material at Rosario Strait Disposal Site instead of Bellingham Disposal Site (Sta. 0+00 to 33+00) 208,000 CY $ 7.00 NA $ 1,456,000.00

Dredge Squalicum Waterway (Sta. 33+00 to 34+73) 4,000 CY 4.90$ NA 19,600.00$

Cost to transport dredged material to the Bellingham Disposal Water Site (Sta. 33+00 to 34+73) 4,000 CY 3.00$ NA 12,000.00$

Incremental cost to transport and dispose dredged material at Port Gardner Disposal Site instead of Bellingham Disposal Site (Sta. 33+00 to 34+73) 4,000 CY 49.55$ NA 198,200.00$

1800 Water Quality Monitoring 5 DAY 470.00$ NA 2,350.00$

Additional Dredge Squalicum Waterway and Turning Basin (Sta. 0+00 to 33+00) 11,000 CY 4.60$ 1 50,600.00$

Additional Dredge Squalicum Waterway and Turning Basin (Sta. 0+00 to 33+00) 6,000 CY 4.60$ 4 110,400.00$

Cost to transport additional dredged material to the Bellingham Disposal Water Site (Sta. 0+00 to 33+00) 11,000 CY 3.05$ 1 33,550.00$

Cost to transport additional dredged material to the Bellingham Disposal Water Site (Sta. 0+00 to 33+00) 6,000 CY 3.05$ 4 73,200.00$

Incremental cost to transport and dispose additional dredged material at Rosario Strait Disposal Site instead of Bellingham Disposal Site (Sta. 0+00 to 33+00) 11,000 CY $ 7.00 1 $ 77,000.00

Incremental cost to transport and dispose additional dredged material at Rosario Strait Disposal Site instead of Bellingham Disposal Site (Sta. 0+00 to 33+00) 6,000 CY $ 7.00 4 $ 168,000.00

Additional Dredge Squalicum Waterway (Sta. 33+00 to 34+73) 500 CY 4.90$ 8 19,600.00$

Cost to transport additional dredged material to the Bellingham Disposal Water Site (Sta. 33+00 to 34+73) 500 CY 3.00$ 8 12,000.00$

Incremental cost to transport and dispose additional dredged material at Port Gardner Disposal Site instead of Bellingham Disposal Site (Sta. 33+00 to 34+73) 500 CY 11.45$ 8 45,800.00$

2800 Additional Water Quality Monitoring 1 DAY 470.00$ 60 28,200.00$

TOTAL BASE ITEMS

OPTIONAL ITEMS

TOTAL OPTIONAL ITEMS

TOTAL BASE & OPTIONAL

7A. ITEM

NO. 7B. DESCRIPTION OF OFFERED ITEM

3,751,800.00$

618,350.00$ 4,370,150.00$

7C. EST

QTY 7D. UNIT

7E. UNIT

PRICE

7G. MAX EXTENDED

AMOUNT

7F. MAX

POTENTIAL

EXERCISE

OF OPT

2019-09-24T09:02:11-0700
COOK.GREGORY.ALLEN.1109082143

File details come from the government source that posted it.