W912DW19B0011_R0002-Squalicum.pdf

PDF 535 KB Posted

Attached to
Squalicum Federal Navigation Channel Dredging Federal contract opportunity
Solicitation number
W912DW19B0011
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

Amendment R0002

View the file

Other files for this federal contract opportunity

Other files attached to Squalicum Federal Navigation Channel Dredging, newest first.
File Type Posted
W912DW19B0011_Squalicum_Bid_Abstract_(Final).pdf PDF
W912DW19B0011R0001-Squalicum.pdf PDF
W912DW19B0011-Squalicum_Dredging_(Final).pdf PDF
W912DW19B0011-Squalicum_Dredging_PLANS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The due date for receipt of bids is unchanged. Bid opening date is 23 September 2019 at 1000 AM Pacific Standard Time.

The purpose of this amendment is to replace the Bid Schedule in its entirety.

***Note: Total dollar amount for options is acheived by multiplying the Estimated Quantity times the Unit Price times the Maximum Number of Potential Exercises of Option.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW19B0011

X 9B. DATED (SEE ITEM 11)

22-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2019

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FY19 Squalicum Waterway Maintenance Dredging, 19016 Bellingham, Washington

W912DW19B0011 00 11 00-1 R0002

CONTRACT LINE ITEM SCHEDULE (CLIN)

ITEM

NO. ITEM DESCRIPTION

ESTIMATED

QTY (Note 1) UNIT UNIT PRICE

MAXIMUM

NUMBER OF

POTENTIAL

EXERCISE

OF OPTION AMOUNT

BASE ITEMS

1100 1200 Mobilization and Demobilization 1 JOB $___________ N/A $___________

1200 Dredge Squalicum Waterway and Turning Basin (Sta. 0+00 to 33+00) 208,000 C.Y. $___________ N/A $___________

(Note 2)

Cost to transport dredged material to the Bellingham Disposal Water Site (Sta. 0+00 to 33+00)

208,000 C.Y $___________ N/A $___________

(Note 2)

Incremental cost to transport and dispose dredged material at Rosario Strait Disposal Site instead of Bellingham Disposal Site (Sta. 0+00 to 33+00)

208,000 C.Y. $___________ N/A $___________

1500 Dredge Squalicum Waterway (Sta. 33+00 to 34+73) 4,000 C.Y. $___________ N/A $___________

(Note 2)

Cost to transport dredged material to the Bellingham Disposal Water Site (Sta. 33+00 to 34+73)

4,000 C.Y $___________ N/A $___________

(Note 2)

Incremental cost to transport and dispose dredged material at Port Gardner Disposal Site instead of Bellingham Disposal Site (Sta. 33+00 to 34+73)

4,000 C.Y $___________ N/A $___________

1800 Water Quality Monitoring 5 DAY $___________ N/A $___________

TOTAL BASE ITEMS $________________________

OPTION ITEMS

1900 Additional Dredge Squalicum Waterway and Turning Basin (Sta. 0+00 to 33+00) 11,000 C.Y. $___________ 1 $___________

(Note3)

Additional Dredge Squalicum Waterway and Turning Basin (Sta. 0+00 to 33+00) 6,000 C.Y. $___________ 4 $___________

W912DW19B0011 00 11 00-2 R0002

ITEM

NO. ITEM DESCRIPTION

ESTIMATED

QTY (Note 1) UNIT UNIT PRICE

MAXIMUM

NUMBER OF

POTENTIAL

EXERCISE

OF OPTION AMOUNT

OPTION ITEMS Continued

(Note 2)

Cost to transport additional dredged material to the Bellingham Disposal Water Site (Sta. 0+00 to 33+00)

11,000 C.Y. $___________ 1 $___________

(Note 2) (Note 4)

Cost to transport additional dredged material to the Bellingham Disposal Water Site (Sta. 0+00 to 33+00)

6,000 C.Y $___________ 4 $___________

(Note 2)

Incremental cost to transport and dispose additional dredged material at Rosario Strait Disposal Site instead of Bellingham Disposal Site (Sta. 0+00 to 33+00)

11,000 C.Y $___________ 1 $___________

(Note 2) (Note 5)

Incremental cost to transport and dispose additional dredged material at Rosario Strait Disposal Site instead of Bellingham Disposal Site (Sta. 0+00 to 33+00)

6,000 C.Y $___________ 4 $___________

(Note 6)

Additional Dredge Squalicum Waterway (Sta. 33+00 to 34+73) 500 C.Y. $___________ 8 $___________

(Note 2) (Note 7)

Cost to transport additional dredged material to the Bellingham Disposal Water Site (Sta. 33+00 to 34+73)

500 C.Y $___________ 8 $___________

(Note 2) (Note 8)

Incremental cost to transport and dispose additional dredged material at Port Gardner Disposal Site instead of Bellingham Disposal Site (Sta. 33+00 to 34+73)

500 C.Y $___________ 8 $___________

(Note 9) Additional Water Quality Monitoring 1 DAY $___________ 60 $___________

TOTAL OPTION ITEMS $________________________

TOTAL BASE AND OPTION ITEMS $________________________

W912DW19B0011 00 11 00-3 R0002

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE 1. Quantities are ESTIMATED except where shown as “JOB.”

NOTE 2: No dredged material will be disposed at the Bellingham Bay Open Water Disposal Site – all disposal will take place at either the Rosario or Port Gardner Open Water Disposal Sites.

NOTE 3: Option Item 2000 may be exercised up to 4 times (not to exceed 24,000 cy option total).

NOTE 4: Option Item 2200 may be exercised up to 4 times (not to exceed 24,000 cy option total).

NOTE 5: Option Item 2400 may be exercised up to 4 times (not to exceed 24,000 cy option total).

NOTE 6: Option Item 2500 may be exercised up to 8 times (not to exceed 4,000 cy option total).

NOTE 7: Option Item 2600 may be exercised up to 8 times (not to exceed 4,000 cy option total).

NOTE 8: Option Item 2700 may be exercised up to 8 times (not to exceed 4,000 cy option total).

NOTE 9: Option Item 2800 may be exercised up to 60 times (not to exceed 60 day option total).

Bids shall not be submitted for quantities less than those specified for each line item. Bidders shall bid on all line items of the Schedule. Failure to include pricing for all quantities of all line items will result in rejection of the bid as non-responsive. Prices are on a unit basis.

The contract price will be evaluated based on the total price of all options exercised the maximum number of times, added to the total price of the base items.

DEFINITIONS FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

C.Y. = cubic yards

-- END OF SECTION –

W912DW19B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

00 11 00 Schedule R0002.pdf
DEFINITIONS FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

File details come from the government source that posted it.