Amend17Q00970003.pdf
PDF 219 KB Posted
- Solicitation number
- W912DW17Q0097
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17Q00970005.pdf | ||
| 17Q00970005_Conformed.pdf | ||
| 17Q00970004.pdf | ||
| 17Q00970003_Conformed_Solicitation.pdf | ||
| 17Q00970002.pdf | ||
| 17Q00970001.pdf | ||
| W912DW17Q0097.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD971800183
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is to extend to 9/12/2017 2:00 PM Pacific Standard Time and to modify the Work Statement to add clarif ication on amounts required. Please note that added to the Work Statement is an Estimated Use Table,
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW17Q0097
X 9B. DATED (SEE ITEM 11)
16-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2017
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW17Q0097
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Sep-2017 10:00 AM to 12-Sep-
2017 02:00 PM.
SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 4008
The unit of issue has changed from Job to Each.
CLIN 0001
The pricing detail quantity has increased by 7.00 from 1.00 to 8.00.
CLIN 0008
The CLIN extended description has changed from:
Portable Rental (Contractor Provided) Provide portable toilets and related services in accordance with the attached performance work statement.Wage Determination No.: 2015-5541, Revision No.: 3, Date Of Revision: 08/03/2017 is provided herein.--- PROJECT NO.: 457573
To:
Portable Rental (Contractor Provided) Provide portable Rental toilets and related services in accordance with the attached performance work statement.Wage Determination No.: 2015-5541, Revision No.: 3, Date Of Revision:
08/03/2017 is provided herein.--- PROJECT NO.: 457573
CLIN 1001
CLIN 1008
Portable Rental (Contractor Provided) Provide portable toilets and related services in accordance with the attached performance work statement.--- PROJECT NO.: 457573
Portable Rental (Contractor Provided) Provide portable Rental toilets and related services in accordance with the attached performance work statement.Wage Determination No.: 2015-5541, Revision No.: 3, Date Of Revision:
CLIN 2001
CLIN 2008
Portable Rental (Contractor Provided) Provide portable toilets and related services in accordance with the attached
Portable Rental (Contractor Provided) Provide portable Rental toilets and related services in accordance with the attached performance work statement.Wage Determination No.: 2015-5541, Revision No.: 3, Date Of Revision:
CLIN 3001
CLIN 3005
The option status has changed from Option to No Status.
CLIN 3008
Portable Rental (Contractor Provided) Provide portable toilets and related services in accordance with the attached
Portable Rental (Contractor Provided) Provide portable Rental toilets and related services in accordance with the attached performance work statement.Wage Determination No.: 2015-5541, Revision No.: 3, Date Of Revision:
CLIN 4001
CLIN 4008
Portable Rental (Contractor Provided) Provide portable toilets and related services in accordance with the attached
Portable Rental (Contractor Provided) Provide portable Rental toilets and related services in accordance with the attached performance work statement.Wage Determination No.: 2015-5541, Revision No.: 3, Date Of Revision:
08/03/2017 is provided herein.--- PROJECT NO.: 457573
CLIN 0009 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0009 1 Each Emergency Pumping
Provide Emergency Pumping and related services in accordance with the attached performance work statement.
Not to exceed 3,000 gallons
Wage Determination No.: 2015-5541, Revision No.: 3, Date Of Revision:
08/03/2017 is provided herein.
--- PROJECT NO.: 457573
FOB: Destination
FFP
NET AMT
CLIN 1009 is added as follows:
1009 1 Each OPTION Emergency Pumping
Provide Emergency Pumping and related services in accordance with the attached performance work statement.
Not to exceed 3,000 gallons
CLIN 2009 is added as follows:
2009 1 Each OPTION Emergency Pumping
Provide Emergency Pumping and related services in accordance with the attached performance work statement.
Not to exceed 3,000 gallons
CLIN 3009 is added as follows:
3009 1 Each OPTION Emergency Pumping
Provide Emergency Pumping and related services in accordance with the attached performance work statement.
Not to exceed 3,000 gallons
CLIN 4009 is added as follows:
4009 1 Each OPTION Emergency Pumping
Provide Emergency Pumping and related services in accordance with the attached performance work statement.
Not to exceed 3,000 gallons
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 15-SEP-2017 TO
31-AUG-2018
N/A CHIEF JOSEPH DAM PROJECT OFFICE
WAREHOUSE
HIGHWAY17 AND PEARL HILL ROAD
BRIDGEPORT WA 98813-1120
509-686-2236
960527
CAGE
POP 15-SEP-2017 TO
31-AUG-2018
N/A CHIEF JOSEPH DAM PROJECT OFFICE
WAREHOUSE
HIGHWAY17 AND PEARL HILL ROAD
BRIDGEPORT WA 98813-1120
509-686-2236
The following Delivery Schedule for CLIN 0009 has been added:
CAGE
POP 15-SEP-2017 TO
31-AUG-2018
N/A CHIEF JOSEPH DAM PROJECT OFFICE
WAREHOUSE
HIGHWAY17 AND PEARL HILL ROAD
BRIDGEPORT WA 98813-1120
509-686-2236
The following Delivery Schedule for CLIN 1009 has been added:
CAGE
POP 15-SEP-2017 TO
31-AUG-2018
N/A CHIEF JOSEPH DAM PROJECT OFFICE
WAREHOUSE
HIGHWAY17 AND PEARL HILL ROAD
BRIDGEPORT WA 98813-1120
509-686-2236
The following Delivery Schedule for CLIN 2009 has been added:
CAGE
POP 15-SEP-2017 TO
31-AUG-2018
N/A CHIEF JOSEPH DAM PROJECT OFFICE
WAREHOUSE
HIGHWAY17 AND PEARL HILL ROAD
BRIDGEPORT WA 98813-1120
509-686-2236
The following Delivery Schedule for CLIN 3009 has been added:
CAGE
POP 15-SEP-2017 TO
31-AUG-2018
N/A CHIEF JOSEPH DAM PROJECT OFFICE
WAREHOUSE
HIGHWAY17 AND PEARL HILL ROAD
BRIDGEPORT WA 98813-1120
509-686-2236
The following Delivery Schedule for CLIN 4009 has been added:
CAGE
POP 15-SEP-2017 TO
31-AUG-2018
N/A CHIEF JOSEPH DAM PROJECT OFFICE
WAREHOUSE
HIGHWAY17 AND PEARL HILL ROAD
BRIDGEPORT WA 98813-1120
509-686-2236
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0009:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 1009:
The following Acceptance/Inspection Schedule was added for CLIN 2009:
The following Acceptance/Inspection Schedule was added for CLIN 3009:
The following Acceptance/Inspection Schedule was added for CLIN 4009:
The following have been modified:
ITEM(S) 4009 - PWS
PERFORMANCE WORK STATEMENT (PWS)
CJD Septic and Holding Tank Pumping and Related Services
Part 1
General Information
1. GENERAL: This is a non-personnel services contract to provide septic and sewage holding tank pumping services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform septic and holding tank pumping and related services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: Sewage septic and holding tanks at Chief Joseph Dam that are included in this contract are:
Dam Spillway Holding Tank, 3,000 gallon capacity General Maintenance Holding Tank, 1,500 gallons capacity Commons Building Septic Tank, estimated 2,000 gallons capacity Upper Spillway Viewpoint Septic Tank, 2,000 gallon capacity Warehouse Septic Tank, 2,000 gallons capacity NRM Office Building Septic Tank, 1,500 gallon capacity Administration Building Septic Tank, 1,500 gallon capacity
1.3 Objectives: Provide pumping services for all listed tanks. Details on intervals can be found on Attachment 1.
1.4 Scope:
1.4.1 Basic Work For Septic Tanks - The contractor shall provide pump out service for septic and holding tanks specified in this contract at the locations and frequency specified in the frequency table. All services will be charged on a volume pumped, not system volume.
1.4.1.1 Provide Pumping Services - The contractor shall provide scheduled pumping services to tanks. The contractor shall make sure that all pumped waste is contained and that the immediate area around the tank is free from any pumped waste. In the event of a spill, the contractor shall immediately clean the spill area and contact the
QAR.
1.4.2 Basic Services For Contractor Owned Portable Toilet - This will be an on call basis when there is a need for extra toilets. The contractor shall provide portable toilet rental units to be delivered, placed, secured, serviced, and removed, as specified by the government. The QAR will inform the contractor of the quantities of units and duration of the rental and where the units will be placed. All units must be in good condition and fully operational at all times.
1.4.2.1 Portable Toilet Specifications – The contractor shall supply portable toilets with the following minimum specifications: Standard size unit with a toilet and urinal.
1.4.2.2 Provide Pumping, Cleaning, and Resupplying Services - The contractor shall provide pumping, cleaning, and re-supplying services to all contractor provided portable toilet while in service under this contract. Supply items shall include two-ply toilet paper, and deodorant blocks in urinals. In the event of a spill, the contractor shall immediately clean the spill area in and contact the QAR.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and one (4) 12-month option years. The Period of Performance reads as follows:
Base Year Date of Award 2017 – 31 August 2018 Option Year 1: 1 September 2018 – 31 August 2019 Option Year 2: 1 September 2019 – 31 August 2020 Option Year 3: 1 September 2020 – 31 August 2021 Option Year 4: 1 September 2021 – 31 August 2022
1.6 General Information
1.6.1.1 Environmental Protections – This paragraph prescribes actions required for the prevention of environmental pollution during and as the result of operations under this contract. For the purpose of this specification, environmental pollution is defined as the presence of chemicals, physical or biological elements, or other agents which adversely affect human health or welfare, unfavorably alter ecological balances, affect other species, or degrade the utility of the environment for aesthetic and recreational purposes. In order to prevent and to provide for abatement and control of any environmental pollution arising from activities in performance of this contract, the Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement.
1.6.1.2 Disposal of Waste Materials – The Contractor shall remove, transport and properly dispose of all materials, wastes, effluents, trash, garbage, chemicals, etc., in accordance with all applicable Federal, State and local regulations. If any waste material is released to the environment, including ground, air or water, the Contractor will remove, transport and properly dispose of the material and restore the area to its original condition.
1.6.1.3 Vehicles and Equipment – All vehicles and equipment must be equipped and operated in compliance with all applicable State laws governing safety, pollution control, licensing and operation.
1.6.1.4 Spillage on Roads – Spillage of foreign material on project, State, or County roads from Contractor vehicles shall not be permitted.
1.6.1.5 Disposal of Cleaning Water – At no time shall the Contractor dispose of waste water by dumping it on the ground anywhere within the contract area. Cleaning water shall be properly managed and disposed as waste materials as described in section 1.6.1.2.
1.6.2 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. In the quality control program the contractor shall provide a record sheet with the time and date of cleaning services for each unit.
The record sheet shall be turned into the QAR after each service, or monthly is multiple services occur in a single month. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:00am and 5:00 pm Monday through Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Chief Joseph Dam.
1.6.6 Type of Contract: The government will award a Firm Fixed Price service contract.
1.6.7 Security Requirements: Contractor personnel performing work under this contract must have a pre-screen using E-Verify Program and must maintain the level of security required for the life of the contract. The security requirements are in accordance with DD254. This form can be initiated by Chief Joseph Dam Security Officer, Cyrstal Baughman.
a. Employee Identification. The Contractor shall be responsible for furnishing an identification badge/card to each employee prior to the employees work on site, and for requiring each employee engaged on the work to display identification. All prescribed identification shall immediately be delivered to the Contracting Officer, for cancellation upon the release of the employee. When the contract involves work in restricted areas, all contractor employees requiring access to those areas are subject to paragraphs (b) through (e) of this clause. The identification will meet the following standards:
1. Cards and badges will identify the name of the installation or activity for which they are valid.
2. Cards and badges will show the name and photograph of the person to whom issued. Visitor cards and badges will show “VISITOR” in place of name and photograph, and will have “ESCORT REQUIRED” or “NO ESCORT REQUIRED” printed across the face of the badge, as appropriate.
3. Cards and badges will contain a serial number.
4. Cards and badges issued for restricted (limited and exclusion) areas will show an expiration date.
5. Cards and badges will identify the area(s) for which they are valid.
6. Cards and badges using mechanical, electronic, or other technological reader to determine access authorization will be evaluated and approved by the Commander of the Seattle District (or a designated representative of the Commander) prior to use.
b. Requirements. Contractor employees performing work within designated security areas are subject to restrictions on entry and movement of personnel and equipment. All contractor personnel are subject to meeting the requirements of this clause.
c. For entry to Chief Joseph Dam Project:
(1) All personnel shall submit the following information: a. Employee name, b. SSN, c. Date of Birth, d. Place of Birth, e. Drivers license number & issuing state, (or other Security Officer approved form of ID), f. SF 85 page 6 (Authorization For Release Of Information). When access to automated information systems (AIS) or critical infrastructure restricted areas is required, a more extensive background investigation may be required including furnishing fingerprint cards of persons employed on the project. See paragraph c (3) and d.
(2) Escorted Contract Personnel.
Contractor personnel who only meet the requirements in paragraph (c)(1) must be escorted at all times either by Government personnel or by Contractor personnel complying with paragraph c (3) of this clause. Government personnel availability for escorting will be limited and may not be available so Contractors should expect personnel complying with paragraph c (3) will be escorts. Therefore, all Contractor personnel working at Chief Joseph Dam Project on a frequent and regular basis should expect to comply with paragraph c (3) of this clause.
d. All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at a minimum, be designated into an Information Technology (IT)-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an IT-III position are a favorable National Agency Check (NAC), SF-85. The Contractor shall have each applicable employee complete an SF-85 using PSIP and submit the Questionnaire to the Security Office within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS.
Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the US Army Corps of Engineers, Seattle District, ATTN: District Security Office, 4735 E. Marginal Way South, Seattle, WA 98134.
For those contractors that do not have a CAGE Code or Facility Security Clearance, the Seattle District Security Office will process the investigation in coordination with the Contractor and contract employees.
e. In addition to the requirements in paragraphs a-d, in accordance with Engineering Regulation, ER 380-1-18, Section 4, foreign nationals who work on Corps of Engineers' contracts or task orders shall be approved by the HQUSACE Foreign Disclosure Officer or higher before beginning work on the contract/task order. This regulation includes subcontractor employees. (NOTE: exceptions to the above requirement include foreign nationals who perform janitorial and/or ground maintenance services). The contractor shall submit to the Division/District Contract Office, the names of all foreign nationals proposed for performance under this contract/task order, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with 1-551 stamp or attached INS Form 1-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form 1-151 or 1-551), Temporary Resident Card (INS Form 1-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form 1-327), Refugee Travel Document (INS Form 1-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B).
1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use.
1.6.7.2 Key Control: N/A
1.6.8 Special Qualifications: N/A
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Quality Assurance Representative (QAR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10 Quality Assurance Representative (QAR): The QAR monitors all technical aspects of the contract and assists in contract administration. The QAR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies: coordinate availability of government furnished property, and provide site entry of Contractor personnel. The QAR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: Contract manager, alternate contract manager, and employees pumping toilets on the project. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between Monday through Thursday except Federal holidays or when the government facility is closed for administrative reasons.
1.6.12 Identification of Contractor Employees: All vehicles that will be used for pumping services shall be marked with the company name.
1.6.13 Contractor Travel: Any travel required for this contract will be at no cost to the government.
1.6.14 Government Key Personnel: The following personnel are considered key personnel by the government:
Lawrence Asuncion – QAR Lawrence.P.Asuncion@usace.army.mil; 509-686-2255
Pat Anson – General Maintenance WIC (POC for contractor escorting) Patrick.E.Anson@usace.army.mil; 509-686-3532
Jason Williams – General Maintenance Crew Supervisor (Alternate POC for contractor escorting) Jason.D.Williams2@usace.army.mil; 509-686-3530
James Balken – Mechanical Maintenance Engineer James.G.Balken@usace.army.mil; 509-686-3513
Crystal Baughman – Security Officer Crystal.A.Baughman@usace.army.mil; 509-686-3515
1.6.15 Data Rights: Any requests made by the government for a copy of records or documents that are related to this service contract will be made available at no cost to the government.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. QUALITY ASSURANCE REPRESENTATIVE (QAR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf CJD Chief Joseph Dam DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QAR Quality Assurance Representative QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit WIC Worker in Charge
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Services: The Government will provide a USACE employee to unlock all of the hatches to vault toilets prior to or concurrent with contractor pumping services. Contractor should contact QAR the day before pumping these vault toilets so that a USACE employee can be made available to open hatches.
3.2 Facilities: N/A
3.3 Utilities: N/A
3.4 Equipment: N/A
3.5 Materials: N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance: N/A
4.3 Materials: The Contractor shall provide all materials and water necessary to pump septic tanks, vault toilets and portable toilets. Contractor shall provide all materials necessary to pump and supply government owned portable toilets. Contractor shall provide all supplies necessary to supply contractor owned portable toilets.
4.4 Equipment: The Contractor shall provide all equipment necessary to pump out septic tanks, vault toilets, government and contractor owned portable toilets.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.2 Basic Services for Dam Spillway Holding Tank - The contractor shall provide pump out service for the dam spillway holding tank as specified in this contract at the frequency specified in the frequency table. The tank does not require a specific connector.
5.2.1 Provided Pumping Services Dam Spillway Holding Tank – The contractor shall provide scheduled pumping services to the dam spillway holding tank. The contractor shall make sure that all pumped waste is contained and that the immediate area around the holding tank is free from any pumped waste. In the event of a spill, the contractor shall immediately clean the spill area and contact the QAR.
5.3 Basic Services for Warehouse Septic Tank, Commons Building Septic Tank, NRM Office Septic Tank, General Maintenance Holding Tank, and Upper Spillway Viewpoint Septic Tank - The contractor shall provide pump out service for the listed tanks as specified in this contract at the frequency specified in the frequency table.
The General Maintenance Holding tank can be pumped using a standard 3” cam lock connection. The septic tanks do not require a specific connector.
5.3.1 Provided Pumping Services for Warehouse Septic Tank, Commons Building Septic Tank, NRM Office Septic Tank, Administration Septic Tank, General Maintenance Holding Tank, and Upper Spillway Viewpoint Septic Tank – The contractor shall provide scheduled pumping services to the listed tanks. The contractor shall make sure that all pumped waste is contained and that the immediate area around the holding tanks is free from any pumped waste. In the event of a spill, the contractor shall immediately clean the spill area and contact the QAR.
5.4 Basic Services For Contractor Owned Portable Toilet – This will be an on call basis when there is a need for extra toilets for special events. The contractor shall provide portable toilet rental units to be delivered, placed, secured, serviced, and removed, as specified by the government. The QAR will inform the contractor of the quantities of units and duration of the rental and where the units will be placed. All units must be in good condition and fully operational at all times.
5.4.1 Portable Toilet Specifications – The contractor shall supply portable toilets with the following minimum specifications: Standard size unit with a toilet and urinal.
5.4.2 Provide Pumping, Cleaning, and Resupplying Services - The contractor shall provide pumping, cleaning, and re-supplying services to all contractor provided portable toilet while in service under this contract. Supply items shall include two-ply toilet paper, and deodorant blocks in urinals. In the event of a spill, the contractor shall immediately clean the spill area in and contact the QAR.
5.5 Provide Emergency Pumping Services – The contractor shall provide emergency pumping services in the unforeseen event of any form of emergency. This should be on call basis and only exercised in the event a tank on project must be pumped outside of the intended schedule or in a shorter lead time window expressed earlier.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Attachment 1– Frequency Table/Estimated Use Table
ATTACHMENT 1
Frequency Table
No.
Paragraph number Location Description of Tank or Toilet Pumping Frequency
1 5.2 Dam Spillway Holding Tank
Roughly 3,000 gallon holding tank
Pump when contacted by Government representative, approximately once every month during spring, and every third month otherwise.
2 5.3 Warehouse Septic Tank Roughly 2,000 gallon septic tank
Pump when contacted by Government representative, estimated one time only.
3 5.3.1 Commons Building Septic Tank
Roughly 2,000 gallon septic tank
Pump when contacted by Government representative, estimated one time only.
4 5.3.1 NRM Office Septic Tank Roughly 1,500 gallon septic tank
Pump when contacted by Government representative, estimated one time only.
5 5.3.1 General Maintenance Holding Tank
Roughly 1,500 gallon holding tank
Pump when contacted by Government representative, estimated one time per year.
6 5.3.1 Upper Spillway Viewpoint Septic Tank
Roughly 2,000 gallon septic tank
Pump when contacted by Government representative, estimated one time per year.
7 5.3.1 Administration Bldg.
Septic Tank
Roughly 1,500 gallon septic tank
Pump when contacted by Government representative, estimated one time only.
8 5.4 Contractor Rented Portables
Contractor Owned Portables QAR will call when needed and where to put them.
Pump 1 time per week if rental is more than 7 days.
9 5.5 Emergency Pumping Largest Capacity, 3,000 gallons
Pump when contacted by Government representative, expected one time only.
Estimated Use Table
Service Location Estimated number of pumping/units Dam Spillway Holding Tank7 8 times per year Warehouse Septic Tank, 1 time for all base and option years Commons Building Septic Tank 1 time for all base and option years NRM Office Septic Tank 1 time for all base and option years General Maintenance Holding Tank 1 time for all base and option years Upper Spillway Viewpoint Septic Tank 1 time per year Administration Bldg. Septic Tank 1 time for all base and option years Contractor Rented Portables 15 units for 5 weeks for all base and option years Emergency Pumping 1 time for all base and option years
The following have been linked or unlinked:
Text Item NOTES applies to CLIN(s) 4009.
Text Item PWS applies to CLIN(s) 4009.
Text Item NOTES no longer applies to CLIN(s) 4008.
Text Item PWS no longer applies to CLIN(s) 4008.
(End of Summary of Changes)