Attachment__1_15C06-BO.PDF

PDF 91 KB Posted

Attached to
Minor Construction project entitled, Repair Hangar Bldg 3041, JBLM, WA 98433
Solicitation number
W912DW-17-B-0012
Issued by

About this file

Sheet Identification M-711

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V ia

D e l C a m p o F ir s t F lo o r, S a n

D ie g o C A

P h o n e .9 .0

F a x .9 .0

SHEET

IDENTIFICATION

1 2 3 4 5

D R

A W

N B

Y

D E

S I G

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

LI

C

IT

A

T

IO

N N

O

C K

D B

Y

US Army Corps of Engineers ®

2" x

4"

D

C

B

A

F

IL

E N

U M

B E

R

P

LO

T S

C A

LE

P

LO

T D

A T

E

Seattle District Seattle, Washington

.3

1.

S C

E N

G

IN

E E

R S

, I N

C

R P

/T B

JC

C

JG

R Q

C O

N S

T R

U C

T

IO

N , L

LC

L I O

N S

H E

A D

A V

E C

A R

L S

B A

D , C

A

B A

T T

A

LI

O N

O P

E R

A T

IO

N

S F

A C

IL

IT

Y

FOR CONSTRUCTION - 03.31.16

A N

K PD

AHS

No. 23923

EXP. 9-30-17S

TAT E

O F CAL I F

OR

N

IA

ORP

DERETSI

GER

FESSIONAL

ENG

R

EE

IN

MECHANICAL

F

UR

O

R

/2

8/

:4

:4

P M

W

2D W

-1 3-

R -0

W

2D W

-1 5-

C -0

M-711

M E

C H

A N

IC

A

L C

O N

T R

O

LS

F Y

S O

F B

A T

T A

LI

O

N O

P E

R A

T

IO

N S

F A

C

IL

I T Y

P R

O

JE

C T

, 6

J

B

LM

, W A

CURRENT TRANSMITTER*

DUCT SMOKE DETECTOR - COORDINATE WITH

ELECTRICAL CONTRACTOR FOR POWER

SUPPLY

DESCRIPTION

STATIC PRESSURE SENSOR

DIFFERENTIAL PRESSURE SENSOR

TEMPERATURE SENSOR W/ PIPING WELL

DDC DIGITAL OUTPUT POINT W/ MANUAL

OVERRIDE AND INDICATING LIGHT ON DDC

PANEL

DDC DIGITAL INPUT POINT W/ INDICATING

LIGHT ON DDC PANEL

DDC ANALOG OUTPUT POINT W/

ADJUSTABLE PID GAIN CONTROL

DDC ANALOG INPUT POINT W/ ADJUSTABLE

PID GAIN CONTROL

SP

DAMPER ACTUATOR

CT

S.D.

PRESSURE SENSOR

CO2 SENSOR

SYMBOL

COORDINATE WITH ELECTRICALE

PROPORTIONAL, INTEGRAL, DERIVATIVE

PROVIDE DIRECT CONTROL CONNECTION OR

CONTROLLER TO THE REFERENCED CONTROL

SYSTEM OR EQUIPMENT.

SEE DETAILS. ADDITIONAL HARDWIRE POINTS

ARE REQUIRED.

CONTROLLER

CONTROLS LEGEND

LAN

DDC

PID

TSP

DP

LAN

SYMBOL

LOCAL AREA NETWORK

DIFFERENTIAL PRESSURE

DIRECT DIGITAL CONTROL

TWISTED SHIELDED PAIR

DESCRIPTION

AIR FLOW SENSORCFM

H

HUMIDITY SENSOR

C2

SCALE: NONE

DDC SYSTEM ARCHITECTURE

A5

T

TEMPERATURE SENSOR

CONTROLLER

DDC

LAN TRUNK

TO OTHER DDC

CONTROLLER

REFER TO EQUIPMENT

SCHEDULE VERIFY W/

MFGR.

SUPERVISORY CONTROLLER DETAIL

A2

(E ) J

B

LM

B A

S E

-W

ID

E

IT

W A

N

DEDICATED

DDC

SWITCH

LON

22 AWG TSP

JACE

SUPERVISORY

CONTROLLER

LON

CAT 6

ETHERNET

CABLE

LON

WATER

METER

ELEC

METER

GAS

METER

MECH.

EQUIP.

CONTROLLER

MECH.

EQUIP.

CONTROLLER

MECH.

EQUIP.

CONTROLLER

MECH.

EQUIP.

CONTROLLER

MECH.

EQUIP.

CONTROLLER

E

AI

AO

DI

DO

P

DPS

T

VELOCITY PRESSURE SWITCH

LPS

VPS

HPS

SYMBOL

HIGH LIMIT PRESSURE SWITCH

3-WAY CONTROL VALVE

LOW LIMIT PRESSURE SWITCH

2-WAY CONTROL VALVE

F

FLOW METER

FS

FLOW SWITCH

DESCRIPTION

ALL METERS SHALL BE CAPABLE OF MANUAL READING AND AT LEAST HOURLY DATA LOGGING AND TRANSMISSION AND PROVIDE

CONSUMPTION DATA FOR THE METERED UTILITY.

GAS AND ELECTRIC METERS SHALL ALSO PROVIDE DEMAND READING BASED ON CONSUMPTION OVER A MAXIMUM OF ANY 15-MINUTE

PERIOD.

ALL METERS SHALL TRANSMIT AT LEAST DAILY AND SHALL BE HARDWIRED.

CONNECT WORKSTATION TO THE JBLM BASE WIDE WAN THROUGH THE BUILDING SWITCH SEPARATELY FROM THE JACE. BOTH THE

JACE AND WORKSTATION REQUIRE IT'S OWN DATA PORT.

REQUEST THE IP ADDRESS FOR THE JACE WORKSTATION THROUGH DPW JOHN TIMMERS OR DAVID KROHN.

UTILITY METERS SHALL REPORT TO THE EEDRS (ENTERPRISE ENERGY DATA REPORT SYSTEM).

EEDRS SHALL BE ON A SEPARATE VLAN TO THE BUILDING CONTROL SYSTEM AND SHALL BE PROVIDED WITH A SEPARATE JACE.

GAS AND WATER METERS SHALL BE A PULSE SIGNAL.

ELECTRIC METER IS NOT A PULSE AND THE FOLLOWING SHALL BE PASSED TO THE EEDRS SERVER FROM THE ELECTRIC METER - AMPS FOR EACH PHASE (A, B, & C); POWER FACTOR FOR EACH PHASE (A, B, & C); VOLTAGE (PHASE A TO NEUTRAL, PHASE B TO NEUTRAL, PHASE C TO NEUTRAL, PHASE A TO B, PHASE A TO C, PHASE B TO C); AND ENERGY - ACCUMULATED AND DEMAND.

THE UTILITY METER JACE SHALL BE INTEGRATED INTO THE EEDRS SERVER.

NOTE:

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

TF

FREEZE STAT

FY13 SOF BOF

FRONT END

WORKSTATION

AND CABINET

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

JACE

EEDRS

CONTROLLER

*CURRENT TRANSMITTERS SHALL BE PROVIDED ON ALL MOTORS.

File details come from the government source that posted it. Updated .