A.07.23_-_17B0004-0002.pdf
PDF 1 MB Posted
- Solicitation number
- W912DW-17-B-0004
About this file
Amendment R0002 as attached. Proposals due NLT 2:00:00p.m., 21 Sep 2017.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD970263287
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912DW-17-B-0004 FY17 MEDEVAC Aircraft Maintenance Hangar, Yakima Training Center, WA
1.The purpose of this R0002 provides for the follow ing:
(see next page)
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Sep-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-B-0004
X 9B. DATED (SEE ITEM 11)
22-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2017
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-17-B-0004
R0002
a. Pre-Award Information, Section 00 45 00 required with proposal submittal.
b. Revised General Wage Decision, WA170045, modification 8, dated 09/01/2017, as attached.
Please note revision 9 will be posted on Amendment R0003, when available, on Friday, 9/15/17.
c. Revised Specifications as attached:
02 41 00 - Demolition.
02 41 00 – Photos, Bldg. 223 YTC, WA 08 45 23 - Insulated Translucent Fiberglass Panel Wall System
1. The proposal due date and time remains as Thursday, 21 Sep 2017 at 2:00 p.m. LOCAL TIME.
2. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. All other terms and conditions of the Solicitation remain unchanged.
Enclosures:
Pre-award (Section 00 45 00) (new) General Wage Decision WA170045_8 (revised) Table of Contents (revised) 02 41 00 Demolition (revised) 02 41 00-B Photos (revised) 08 45 23 Insulated Translucent Fiberglass Panel Wall System (revised
W912DW-17-B-0004 004500 - A
SUBMIT THE FOLLOWING INFORMATION WITH YOUR OFFER
NOTICE TO OFFERORS REGARDING PRE-AWARD INFORMATION
It is requested that the following information be provided with your bid:
1. Company Name and Address: _____________________________________________________
2. Point of Contact:
Name:_________________________________________________________________________
Telephone Number _________________________ Fax Number _________________________
Email address_____________________________________________________________________
3. Electronic Transfer Payments will now be required for all new contracts. Do you currently receive Electronic Transfer Payments from this agency? (agency codes 00005524/00006482)
Yes____ No____
4. Name of Bank and Branch ______________________________________________________
Personal Banker __________________________________________________________________
Telephone Number _________________________ Fax Number _________________________
Email address_____________________________________________________________________
5. Name of Bonding Agent Company ___________________________________________________
Agents Name _____________________________________________________________________
Telephone Number _________________________ Fax Number _________________________
Email address_____________________________________________________________________
6. List three projects that are substantially complete or have been completed within the last two years that are similar to this project. Projects should be listed in the following order: Federal Projects, state projects, city and county projects, than commercial projects. Please provide in the following format:
a) Title & Location of Project ________________________________________________________
Agency/Company _______________________________________________________________
Award Amount _________________________________________________________________
Point of Contact (Name & Title) ___________________________________________________
Telephone Number _______________________ Year of Completion________________
W912DW-17-B-0004 004500 - B
b) Title & Location of Project ________________________________________________________
Agency/Company _______________________________________________________________
Award Amount _________________________________________________________________
Point of Contact (Name & Title) ___________________________________________________
Telephone Number _______________________ Year of Completion________________
c) Title & Location of Project ________________________________________________________
Agency/Company _______________________________________________________________
Award Amount _________________________________________________________________
Point of Contact (Name & Title) ___________________________________________________
Telephone Number _______________________ Year of Completion________________
7) List all outstanding uncompleted projects, in the following format:
a) Title of Project _________________________________________________________________
Agency/Company _______________________________________________________________
Est. Completion Date _____________________________________________________________
Award Amount _________________________________________________________________
b) Title of Project _________________________________________________________________
Agency/Company _______________________________________________________________
Est. Completion Date _____________________________________________________________
Award Amount _________________________________________________________________
c) Title of Project _________________________________________________________________
Agency/Company _______________________________________________________________
Est. Completion Date _____________________________________________________________
Award Amount _________________________________________________________________
W912DW-17-B-0004 WA160105 - 1 R0002
General Decision Number: WA170045 09/01/2017 WA45
Superseded General Decision Number: WA20160045
State: Washington
Construction Type: Building
County: Yakima County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 02/17/2017 2 03/10/2017 3 05/19/2017 4 06/02/2017 5 06/16/2017 6 06/30/2017 7 07/21/2017 8 09/01/2017
* ASBE0007-002 06/01/2017
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 50.56 15.37
BRWA0001-002 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 38.24 15.57
CARP0770-017 06/01/2015
Rates Fringes
CARPENTER (Excluding Acoustical Ceiling Installation)....................$ 27.61 14.00
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the
W912DW-17-B-0004 WA160105 - 2 R0002
free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
ELEC0112-014 06/01/2017
Rates Fringes
ELECTRICIAN......................$ 40.90 20.06
ENGI0302-017 06/01/2017
West of the 120th Meridian
Rates Fringes
Power equipment operators:
Group 1A...................$ 41.90 19.20 Group 1AA..................$ 42.52 19.20 Group 1AAA.................$ 43.13 19.20 Group 1.....................$ 41.29 19.20 Group 2.....................$ 40.76 19.20 Group 3.....................$ 40.29 19.20 Group 4.....................$ 37.70 19.20
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Trackhoe: Over 90 metric tons
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Loaders-overhead, 8 yards and over; Trackhoe: over 50 metric tons to 90 metric tons
W912DW-17-B-0004 WA160105 - 3 R0002
GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Trackhoe: over 30 metric tons to 50 metric tons; Loader- overhead 6 yards to, but not including 8 yards; Dozer D-10; Screedman; Scrapers: 45 yards and over; Grader/Blade
GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;
Drilling machine; Trackhoe: 15 to 30 metric tons;
Horizontal/directional drill operator; Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Compactor;
Scraper: under 45 tons
GROUP 3 - Cranes-thru 19 tons with attachments; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under 100 tons; Trackhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments
GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments
ENGI0370-018 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 26.16 13.55
GROUP 2.....................$ 26.48 13.55
GROUP 3.....................$ 27.09 13.55
GROUP 4.....................$ 27.25 13.55
GROUP 5.....................$ 27.41 13.55
GROUP 6.....................$ 27.69 13.55
GROUP 7.....................$ 27.96 13.55
GROUP 8.....................$ 29.06 13.55
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Compactor; Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Drills (churn, core, calyx or diamond); Oiler;
Loaders (overhead & front-end, under 4 yds. R/T); Vacuum Drill (reverse circulation drill under 8 inch bit)
GROUP 5: Trackhoe (hoe Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar)
GROUP 6: Asphalt Roller; Trackhoe (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.
W912DW-17-B-0004 WA160105 - 4 R0002
incl. 8 yds.); Scrapers, all, rubber-tired
GROUP 7: Trackhoe (Hoe Ram) (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers)
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0086-009 07/01/2016
Rates Fringes
IRONWORKER (Reinforcing, Structural, and Ornamental)......$ 32.89 24.56
LABO0348-006 06/01/2017
Rates Fringes
LABORER
GROUP 2....................$ 24.31 10.99
GROUP 3....................$ 26.60 10.99
GROUP 4....................$ 27.24 10.99
GROUP 5....................$ 26.71 10.80
BASE POINTS: CHELAN, SUNNYSIDE, WENATCHEE, AND YAKIMA
ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 radius miles from the respective city hall
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $2.25
LABORERS CLASSIFICATIONS
GROUP 2: Flagman
GROUP 3: Mason Tender-Cement/Concrete; Chipping Gun (under 30 lbs.); Form Stripping
GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;
Grade Checker; Gunite; Vibrating Plate
GROUP 5: Mason Tender-Brick
W912DW-17-B-0004 WA160105 - 5 R0002
PAIN0005-026 06/01/2008
Rates Fringes
Painters: (Parking Lot and highway Striping)................$ 26.50 11.40
PAIN0005-027 04/15/2013
Rates Fringes
Painters:
BRUSH, ROLLER AND SPRAY.....$ 15.58 10.23
PAIN0054-001 06/01/2008
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 22.78 8.88
PAIN0054-004 10/01/2005
Rates Fringes
FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22
PLAS0072-009 07/01/2016
Rates Fringes
PLASTERER........................$ 27.13 13.67
Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0-45 radius miles from the main post office
Zone 2: Over 45 radius miles from the main post office
PLUM0598-017 06/01/2017
Rates Fringes
PLUMBER (including HVAC Pipe Installation)....................$ 49.24 28.79
ROOF0189-014 07/01/2016
Rates Fringes
ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs).....$ 26.42 10.53
SFWA0699-005 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 33.20 15.84
W912DW-17-B-0004 WA160105 - 6 R0002
SHEE0066-021 06/01/2013
Rates Fringes
Sheet metal worker...............$ 32.83 17.16
SUWA2009-033 05/22/2009
Rates Fringes
LABORER: Common or General......$ 14.50 0.00
LABORER: Handheld Drill.........$ 17.17 5.36
LABORER: Irrigation.............$ 11.58 0.00
LABORER: Landscape..............$ 11.08 0.00
LABORER: Pipelayer..............$ 17.25 4.40
OPERATOR: Backhoe...............$ 19.59 0.00
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 22.05 7.35
OPERATOR: Concrete Pumper.......$ 22.30 5.27
OPERATOR: Excavator.............$ 25.02 5.43
OPERATOR: Mechanic..............$ 24.33 4.33
OPERATOR: Oiler.................$ 23.76 8.71
OPERATOR: Roller................$ 19.08 0.00
OPERATOR: Screed................$ 19.08 0.00
PIPEFITTER.......................$ 23.88 6.62
TILE SETTER......................$ 25.51 0.00
TRUCK DRIVER: Dump Truck........$ 11.87 0.00
TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons
W912DW-17-B-0004 WA160105 - 7 R0002
resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
W912DW-17-B-0004 WA160105 - 8 R0002
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
W912DW-17-B-0004 WA160105 - 9 R0002
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIONGeneral Decision Number: WA170105 03/31/2017
WA105
Superseded General Decision Number: WA20160105
State: Washington
Construction Type: Heavy Dredging
Counties: Washington Statewide.
DREDGING CONSTRUCTION PROJECTS (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 03/31/2017
ENGI0302-030 06/01/2014
CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF
THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING,
KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN),
SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE
120TH MERIDIAN) COUNTIES
Rates Fringes
DREDGING
GROUP 1.....................$ 35.93 17.40
GROUP 2.....................$ 36.93 17.40
GROUP 3.....................$ 37.35 17.40
GROUP 4.....................$ 38.39 17.40
GROUP 5.....................$ 36.93 17.40
W912DW-17-B-0004 WA160105 - 10 R0002
GROUP 6.....................$ 37.35 17.40
ZONE 2 (26-45 radius miles) - Add $1.00 to Zone 1 rates ZONE 3 (Over 45 radius miles) - Add $1.30 to Zone 1 rates
BASEPOINTS: Kent, Everett, Mt. Vernon, Bellingham, Port Angeles, Port Townsend, Aberdeen, Shelton, Bremerton, Wenatchee, and Yakima
WORK PERFORMED ON HYDRAULIC DREDGES:
GROUP 1: Assistant Mate (Deckhand GROUP 2: Oiler GROUP 3: Assistant Engineer (Electric, Diesel, Steam or Booster Pump); Mates and Boatmen GROUP 4: Craneman, Engineer Welder GROUP 5: Leverman, Hydraulic GROUP 6: Maintenance
ENGI0370-006 06/01/2013
ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN),
COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY,
FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH
MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN
AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES
WORK PERFORMED ON HYDRAULIC DREDGES
Hydraulic Dredge
GROUP 1:....................$ 25.56 12.85
GROUP 2:....................$ 25.88 12.85
GROUP 3:....................$ 26.49 12.85
GROUP 4:....................$ 26.65 12.85
GROUP 5:....................$ 26.81 12.85
GROUP 6:....................$ 27.09 12.85
GROUP 7:....................$ 27.36 12.85
GROUP 1: Assistant Mate (Deckhand) GROUP 2: Assistant Engineer (Electric, Diesel, Steam, or Booster Pump) GROUP 3: Engineer Welder GROUP 4: Leverman, Hydraulic GROUP 5: Maintenance GROUP 6: Oiler GROUP 7: Mates & Boatman
HEAVY WAGE RATES APPLIES TO CLAM SHELL DREDGE, HOE AND
DIPPER, SHOVELS AND SHOVEL ATTACHMENTS, CRANES AND
BULLDOZERS.
ENGI0612-013 06/01/2014
LEWIS, PIERCE, PACIFIC (THAT PORTION WHICH LIES NORTH OF A
PARALLEL LINE EXTENDED WEST FROM THE NORTHERN BOUNDARY OF
WAHKAIKUM COUNTY TO THE SEA IN THE STATE OF WASHINGTON) AND
THURSTON COUNTIES
W912DW-17-B-0004 WA160105 - 11 R0002
PROJECTS:
CATEGORY A PROJECTS (excludes Category B projects, as shown below)
POWER EQUIPMENT OPERATOR
WORK PERFORMED ON
HYDRAULIC DREDGES
GROUP 1....................$ 35.93 17.40
GROUP 2....................$ 36.93 17.40
GROUP 3....................$ 37.35 17.40
GROUP 4....................$ 38.39 17.40
GROUP 5....................$ 36.93 17.40
GROUP 6....................$ 37.35 17.40
ZONE 2 (26-45 radius miles) - Add $1.00 to Zone 1 rates ZONE 3 (Over 45 radius miles) - Add $1.30 to Zone 1 rates
BASEPOINTS: Tacoma, Olympia, and Centralia
CATEGORY B PROJECTS - 95% of the basic hourly rate for each group plus full fringe benefits applicable to Category A projects shall apply to the following projects: Reduced rates may be paid on the following:
1. Projects involving work on structures such as buildings and structures whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract.
2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded.
3. Marine projects (docts, wharfs, etc.) less than $150,000
WORK PERFORMED ON HYDRAULIC DREDGES:
GROUP 1: Assistant Mate (Deckhand GROUP 2: Oiler GROUP 3: Assistant Engineer (Electric, Diesel, Steam or Booster Pump); Mates and Boatmen GROUP 4: Craneman, Engineer Welder GROUP 5: Leverman, Hydraulic GROUP 6: Maintenance
HEAVY WAGE RATES APPLIES TO CLAM SHEEL DREDGE, HOE AND
DIPPER, SHOVELS AND SHOVEL ATTACHMENTS, CRANES AND
BULLDOZERS
HANDLING OF HAZARDOUS WASTE MATERIALS
H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing, Class "D" Suit - Base wage rate plus $ .50 per hour.
H-2 Class "C" Suit - Base wage rate plus $1.00 per hour.
H-3 Class "B" Suit - Base wage rate plus $1.50 per hour.
H-4 Class "A" Suit - Base wage rate plus $2.00 per hour.
* ENGI0701-003 01/01/2017
CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH), SKAMANIA, AND
W912DW-17-B-0004 WA160105 - 12 R0002
WAHKIAKUM COUNTIES
DREDGING:
Dredging:
ZONE A
ASSISTANT ENGINEER.........$ 42.80 14.35
ASSISTANT MATE.............$ 37.44 14.35
LEVERMAN, DIPPER,
FLOATING CLAMSHELL.........$ 45.96 14.35
LEVERMAN, HYDRAULIC........$ 45.96 14.35
TENDERMAN..................$ 41.31 14.35
ZONE B
ASSISTANT ENGINEER.........$ 45.80 14.35
ASSISTANT MATE.............$ 40.44 14.35
LEVERMAN, DIPPER,
FLOATING CLAMSHELL.........$ 48.96 14.35
LEVERMAN, HYDRAULIC........$ 48.96 14.35
TENDERMAN..................$ 44.31 14.35
ZONE C
ASSISTANT ENGINEER.........$ 48.80 14.35
ASSISTANT MATE.............$ 43.44 14.35
LEVERMAN, DIPPER,
FLOATING CLAMSHELL.........$ 51.96 14.35
LEVERMAN, HYDRAULIC........$ 51.96 14.35
TENDERMAN..................$ 47.31 14.35
ZONE DESCRIPTION FOR DREDGING:
ZONE A - All jobs or projects located within 30 road miles of Portland City Hall.
ZONE B - Over 30-60 road miles from Portland City Hall.
ZONE C - Over 60 road miles from Portland City Hall.
*All jobs or projects shall be computed from the city hall by the shortest route to the geographical center of the project.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO
W912DW-17-B-0004 WA160105 - 13 R0002
is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
W912DW-17-B-0004 WA160105 - 14 R0002
classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
W912DW-17-B-0004 WA160105 - 15 R0002
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT & CONTRACTING REQUIREMENTS
00 21 00 Instructions, Conditions and Notice to Offerors 00 45 00 Representations and Certifications and other
Statements of Offerors, and Pre-Award Information 00 72 00 Contract Clauses
00 73 00 SPECIAL CLAUSES
00 73 00-A List of Drawings
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 11 04 SUPPLEMENTARY REQUIREMENTS FOR YAKIMA TRAINING CENTER
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 26-A Preliminary Accident Notification Worksheet
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 50 00-A Project and Safety Signs
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19-A Construction General Permit (CGP) Guidance 01 57 19-B Immediate Action Procedures for Petroleum or Chemical
Spill
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 74 19-A Construction & Demolition Diversion/Disposal Report Form
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 41 00-A HAZMAT SURVEYS BLDGS 223 & 3423
02 41 00-B PHOTOS BLDGS 223 & 3423
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 13.00 10 ASBESTOS ABATEMENT
02 83 19.13 10 LEAD-BASED PAINT ABATEMENT
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 30 12 ROOFING UNDERLAYMENT
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 61 15 ALUMINUM STANDING SEAM ROOFING
07 72 53 SNOW GUARDS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOOR AND FRAMES
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 45 23 INSULATED TRANSLUCENT FIBERGLASS PANEL WALL SYSTEM
08 51 13 FIXED ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 27 25 SAFETY STRIPING
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 90 00 PAINTS AND COATINGS
09 96 50 URETHANE TOPCOATING
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 22 13 WIRE MESH PARTITIONS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 11 - EQUIPMENT
11 81 29 HORIZONTAL FALL PROTECTION
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS, GRIDS, AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING
SYSTEMS
23 11 25 FACILITY GAS PIPING
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 ELECTRIC METERS
26 32 13.16 GASEOUS EMERGENCY ENGINE GENERATORS
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 35 44 HIGH POWER, 28 VDC, ADJUSTABLE DIRECT CURRENT POWER
SUPPLIES
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 74 INTERIOR FIRE DETECTION AND ALARM SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 21 13 RADON MITIGATION
31 31 16.19 TERMITE CONTROL BARRIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 16 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING
32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 17 23 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS
33 30 00 SANITARY SEWERS
33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
-- End of Project Table of Contents --
YTC Medevac Hangar 17002 JBLM - Yakima Training Center, WA W912DW-17-B-0004
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 41 00
DEMOLITION
05/10
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
1.2.2 General Requirements
1.2.3 Work Plan
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities
1.4 BURNING
1.5 AVAILABILITY OF WORK AREAS
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.7.1 Dust and Debris Control
1.8 PROTECTION
1.8.1 Traffic Control Signs
1.8.2 Protection of Personnel
1.9 FOREIGN OBJECT DAMAGE (FOD)
1.10 RELOCATIONS
1.11 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Chain Link Fencing
3.1.4 Paving and Slabs
3.1.5 Roofing
3.1.5.1 Temporary Roofing
3.1.5.2 Reroofing
3.1.6 Masonry
3.1.7 Concrete
3.1.8 Structural Steel
3.1.9 Miscellaneous Metal
3.1.10 Carpentry
SECTION 02 41 00 Page 1
3.1.11 Carpet
3.1.12 Acoustic Ceiling Tile
3.1.13 Air Conditioning Equipment
3.1.14 Cylinders and Canisters
3.1.15 Locksets on Swinging Doors
3.1.16 Mechanical Equipment and Fixtures
3.1.16.1 Preparation for Storage
3.1.16.2 Piping
3.1.16.3 Ducts
3.1.16.4 Fixtures, Motors and Machines
3.1.17 Electrical Equipment and Fixtures
3.1.17.1 Fixtures
3.1.17.2 Electrical Devices
3.1.17.3 Wiring Ducts or Troughs
3.1.17.4 Conduit and Miscellaneous Items
3.1.18 Elevators and Hoists
3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
3.3.2 Reuse of Materials and Equipment
3.3.3 Salvaged Materials and Equipment
3.3.4 Disposal of Ozone Depleting Substance (ODS)
3.3.4.1 Special Instructions
3.3.4.2 Fire Suppression Containers
3.3.5 Transportation Guidance
3.3.6 Unsalvageable and Non-Recyclable Material
3.4 CLEANUP
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property
3.5.4 Removal from Government Property
3.6 REUSE OF SALVAGED ITEMS
ATTACHMENTS:
02 41 00-A
02 41 00-B
-- End of Section Table of Contents --
SECTION 02 41 00 Page 2
SECTION 02 41 00
DEMOLITION
05/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
AASHTO T 180 (2015) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations
CARPET AND RUG INSTITUTE (CRI)
CRI CIS (2011) Carpet Installation Standard
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25 (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders http://www.aviation.dla.mil/UserWeb/aviationengineering/
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M (2006) MILSTRIP - Military Standard
SECTION 02 41 00 Page 3
Requisitioning and Issue Procedures
MIL-STD-129 (2014; Rev R) Military Marking for Shipment and Storage
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 82 Protection of Stratospheric Ozone
49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
Prepare a Demolition Plan and submit proposed demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Coordinate with Waste Management Plan. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.
1.2.2 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the buildings . In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
In the interest of conservation, salvage and deconstruction shall be pursued to the maximum extent possible; salvaged items and materials shall be disposed of as specified. See Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT paragraph GOVERNMENT POLICY for required C&D diversion minimums.
1.2.3 Work Plan
The procedures proposed for the accomplishment of the work. The procedures shall provide for safe conduct of the work, including procedures and methods to provide necessary supports, lateral bracing and shoring when required, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations in accordance with EM 385-1-1.
SECTION 02 41 00 Page 4
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated.
Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .