AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DW-17-B-0004 FY17 MEDEVAC Aircraft Maintenance Hangar, Yakima Training Center, WA

1.The purpose of this R0002 provides for the follow ing:

(see next page)

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-B-0004

X 9B. DATED (SEE ITEM 11)

22-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2017

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-17-B-0004

R0002

a. Pre-Award Information, Section 00 45 00 required with proposal submittal.

b. Revised General Wage Decision, WA170045, modification 8, dated 09/01/2017, as attached.

Please note revision 9 will be posted on Amendment R0003, when available, on Friday, 9/15/17.

c. Revised Specifications as attached:

02 41 00 - Demolition.

02 41 00 – Photos, Bldg. 223 YTC, WA 08 45 23 - Insulated Translucent Fiberglass Panel Wall System

1. The proposal due date and time remains as Thursday, 21 Sep 2017 at 2:00 p.m. LOCAL TIME.

2. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.

4. All other terms and conditions of the Solicitation remain unchanged.

Enclosures:

Pre-award (Section 00 45 00) (new) General Wage Decision WA170045_8 (revised) Table of Contents (revised) 02 41 00 Demolition (revised) 02 41 00-B Photos (revised) 08 45 23 Insulated Translucent Fiberglass Panel Wall System (revised

W912DW-17-B-0004 004500 - A

SUBMIT THE FOLLOWING INFORMATION WITH YOUR OFFER

NOTICE TO OFFERORS REGARDING PRE-AWARD INFORMATION

It is requested that the following information be provided with your bid:

1. Company Name and Address: _____________________________________________________

2. Point of Contact:

Name:_________________________________________________________________________

Telephone Number _________________________ Fax Number _________________________

Email address_____________________________________________________________________

3. Electronic Transfer Payments will now be required for all new contracts. Do you currently receive Electronic Transfer Payments from this agency? (agency codes 00005524/00006482)

Yes____ No____

4. Name of Bank and Branch ______________________________________________________

Personal Banker __________________________________________________________________

Telephone Number _________________________ Fax Number _________________________

Email address_____________________________________________________________________

5. Name of Bonding Agent Company ___________________________________________________

Agents Name _____________________________________________________________________

Telephone Number _________________________ Fax Number _________________________

Email address_____________________________________________________________________

6. List three projects that are substantially complete or have been completed within the last two years that are similar to this project. Projects should be listed in the following order: Federal Projects, state projects, city and county projects, than commercial projects. Please provide in the following format:

a) Title & Location of Project ________________________________________________________

Agency/Company _______________________________________________________________

Award Amount _________________________________________________________________

Point of Contact (Name & Title) ___________________________________________________

Telephone Number _______________________ Year of Completion________________

W912DW-17-B-0004 004500 - B

b) Title & Location of Project ________________________________________________________

Agency/Company _______________________________________________________________

Award Amount _________________________________________________________________

Point of Contact (Name & Title) ___________________________________________________

Telephone Number _______________________ Year of Completion________________

c) Title & Location of Project ________________________________________________________

Agency/Company _______________________________________________________________

Award Amount _________________________________________________________________

Point of Contact (Name & Title) ___________________________________________________

Telephone Number _______________________ Year of Completion________________

7) List all outstanding uncompleted projects, in the following format:

a) Title of Project _________________________________________________________________

Agency/Company _______________________________________________________________

Est. Completion Date _____________________________________________________________

Award Amount _________________________________________________________________

b) Title of Project _________________________________________________________________

Agency/Company _______________________________________________________________

Est. Completion Date _____________________________________________________________

Award Amount _________________________________________________________________

c) Title of Project _________________________________________________________________

Agency/Company _______________________________________________________________

Est. Completion Date _____________________________________________________________

Award Amount _________________________________________________________________

W912DW-17-B-0004 WA160105 - 1 R0002

General Decision Number: WA170045 09/01/2017 WA45

Superseded General Decision Number: WA20160045

State: Washington

Construction Type: Building

County: Yakima County in Washington.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 02/17/2017 2 03/10/2017 3 05/19/2017 4 06/02/2017 5 06/16/2017 6 06/30/2017 7 07/21/2017 8 09/01/2017

* ASBE0007-002 06/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 50.56 15.37

BRWA0001-002 06/01/2016

Rates Fringes

BRICKLAYER.......................$ 38.24 15.57

CARP0770-017 06/01/2015

Rates Fringes

CARPENTER (Excluding Acoustical Ceiling Installation)....................$ 27.61 14.00

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the

W912DW-17-B-0004 WA160105 - 2 R0002

free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

ELEC0112-014 06/01/2017

Rates Fringes

ELECTRICIAN......................$ 40.90 20.06

ENGI0302-017 06/01/2017

West of the 120th Meridian

Rates Fringes

Power equipment operators:

Group 1A...................$ 41.90 19.20 Group 1AA..................$ 42.52 19.20 Group 1AAA.................$ 43.13 19.20 Group 1.....................$ 41.29 19.20 Group 2.....................$ 40.76 19.20 Group 3.....................$ 40.29 19.20 Group 4.....................$ 37.70 19.20

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)

GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Trackhoe: Over 90 metric tons

GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Loaders-overhead, 8 yards and over; Trackhoe: over 50 metric tons to 90 metric tons

W912DW-17-B-0004 WA160105 - 3 R0002

GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Trackhoe: over 30 metric tons to 50 metric tons; Loader- overhead 6 yards to, but not including 8 yards; Dozer D-10; Screedman; Scrapers: 45 yards and over; Grader/Blade

GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;

Drilling machine; Trackhoe: 15 to 30 metric tons;

Horizontal/directional drill operator; Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Compactor;

Scraper: under 45 tons

GROUP 3 - Cranes-thru 19 tons with attachments; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under 100 tons; Trackhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments

GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments

ENGI0370-018 06/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 26.16 13.55

GROUP 2.....................$ 26.48 13.55

GROUP 3.....................$ 27.09 13.55

GROUP 4.....................$ 27.25 13.55

GROUP 5.....................$ 27.41 13.55

GROUP 6.....................$ 27.69 13.55

GROUP 7.....................$ 27.96 13.55

GROUP 8.....................$ 29.06 13.55

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Compactor; Rollers, all types on subgrade, including seal and chip coatings

GROUP 2: Fork Lift

GROUP 3: Bulldozer (up to D-6 or equivalent)

GROUP 4: Drills (churn, core, calyx or diamond); Oiler;

Loaders (overhead & front-end, under 4 yds. R/T); Vacuum Drill (reverse circulation drill under 8 inch bit)

GROUP 5: Trackhoe (hoe Ram) (under 3/4 yd.); Cranes (25 tons & under), Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar)

GROUP 6: Asphalt Roller; Trackhoe (Hoe Ram) (3/4 yd. to 3 yd.); Compactor (self-propelled with blade); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds.

W912DW-17-B-0004 WA160105 - 4 R0002

incl. 8 yds.); Scrapers, all, rubber-tired

GROUP 7: Trackhoe (Hoe Ram) (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers)

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)

BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0086-009 07/01/2016

Rates Fringes

IRONWORKER (Reinforcing, Structural, and Ornamental)......$ 32.89 24.56

LABO0348-006 06/01/2017

Rates Fringes

LABORER

GROUP 2....................$ 24.31 10.99

GROUP 3....................$ 26.60 10.99

GROUP 4....................$ 27.24 10.99

GROUP 5....................$ 26.71 10.80

BASE POINTS: CHELAN, SUNNYSIDE, WENATCHEE, AND YAKIMA

ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 radius miles from the respective city hall

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):

ZONE 2 - $2.25

LABORERS CLASSIFICATIONS

GROUP 2: Flagman

GROUP 3: Mason Tender-Cement/Concrete; Chipping Gun (under 30 lbs.); Form Stripping

GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;

Grade Checker; Gunite; Vibrating Plate

GROUP 5: Mason Tender-Brick

W912DW-17-B-0004 WA160105 - 5 R0002

PAIN0005-026 06/01/2008

Rates Fringes

Painters: (Parking Lot and highway Striping)................$ 26.50 11.40

PAIN0005-027 04/15/2013

Rates Fringes

Painters:

BRUSH, ROLLER AND SPRAY.....$ 15.58 10.23

PAIN0054-001 06/01/2008

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 22.78 8.88

PAIN0054-004 10/01/2005

Rates Fringes

FLOOR LAYER: Carpet and Vinyl....$ 15.50 4.22

PLAS0072-009 07/01/2016

Rates Fringes

PLASTERER........................$ 27.13 13.67

Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee

Zone 1: 0-45 radius miles from the main post office

Zone 2: Over 45 radius miles from the main post office

PLUM0598-017 06/01/2017

Rates Fringes

PLUMBER (including HVAC Pipe Installation)....................$ 49.24 28.79

ROOF0189-014 07/01/2016

Rates Fringes

ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs).....$ 26.42 10.53

SFWA0699-005 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 33.20 15.84

W912DW-17-B-0004 WA160105 - 6 R0002

SHEE0066-021 06/01/2013

Rates Fringes

Sheet metal worker...............$ 32.83 17.16

SUWA2009-033 05/22/2009

Rates Fringes

LABORER: Common or General......$ 14.50 0.00

LABORER: Handheld Drill.........$ 17.17 5.36

LABORER: Irrigation.............$ 11.58 0.00

LABORER: Landscape..............$ 11.08 0.00

LABORER: Pipelayer..............$ 17.25 4.40

OPERATOR: Backhoe...............$ 19.59 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 22.05 7.35

OPERATOR: Concrete Pumper.......$ 22.30 5.27

OPERATOR: Excavator.............$ 25.02 5.43

OPERATOR: Mechanic..............$ 24.33 4.33

OPERATOR: Oiler.................$ 23.76 8.71

OPERATOR: Roller................$ 19.08 0.00

OPERATOR: Screed................$ 19.08 0.00

PIPEFITTER.......................$ 23.88 6.62

TILE SETTER......................$ 25.51 0.00

TRUCK DRIVER: Dump Truck........$ 11.87 0.00

TRUCK DRIVER: Semi-Trailer Truck............................$ 20.59 5.56

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons

W912DW-17-B-0004 WA160105 - 7 R0002

resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

W912DW-17-B-0004 WA160105 - 8 R0002

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

W912DW-17-B-0004 WA160105 - 9 R0002

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIONGeneral Decision Number: WA170105 03/31/2017

WA105

Superseded General Decision Number: WA20160105

State: Washington

Construction Type: Heavy Dredging

Counties: Washington Statewide.

DREDGING CONSTRUCTION PROJECTS (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 03/31/2017

ENGI0302-030 06/01/2014

CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF

THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING,

KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN),

SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE

120TH MERIDIAN) COUNTIES

Rates Fringes

DREDGING

GROUP 1.....................$ 35.93 17.40

GROUP 2.....................$ 36.93 17.40

GROUP 3.....................$ 37.35 17.40

GROUP 4.....................$ 38.39 17.40

GROUP 5.....................$ 36.93 17.40

W912DW-17-B-0004 WA160105 - 10 R0002

GROUP 6.....................$ 37.35 17.40

ZONE 2 (26-45 radius miles) - Add $1.00 to Zone 1 rates ZONE 3 (Over 45 radius miles) - Add $1.30 to Zone 1 rates

BASEPOINTS: Kent, Everett, Mt. Vernon, Bellingham, Port Angeles, Port Townsend, Aberdeen, Shelton, Bremerton, Wenatchee, and Yakima

WORK PERFORMED ON HYDRAULIC DREDGES:

GROUP 1: Assistant Mate (Deckhand GROUP 2: Oiler GROUP 3: Assistant Engineer (Electric, Diesel, Steam or Booster Pump); Mates and Boatmen GROUP 4: Craneman, Engineer Welder GROUP 5: Leverman, Hydraulic GROUP 6: Maintenance

ENGI0370-006 06/01/2013

ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN),

COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY,

FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH

MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN

AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES

WORK PERFORMED ON HYDRAULIC DREDGES

Hydraulic Dredge

GROUP 1:....................$ 25.56 12.85

GROUP 2:....................$ 25.88 12.85

GROUP 3:....................$ 26.49 12.85

GROUP 4:....................$ 26.65 12.85

GROUP 5:....................$ 26.81 12.85

GROUP 6:....................$ 27.09 12.85

GROUP 7:....................$ 27.36 12.85

GROUP 1: Assistant Mate (Deckhand) GROUP 2: Assistant Engineer (Electric, Diesel, Steam, or Booster Pump) GROUP 3: Engineer Welder GROUP 4: Leverman, Hydraulic GROUP 5: Maintenance GROUP 6: Oiler GROUP 7: Mates & Boatman

HEAVY WAGE RATES APPLIES TO CLAM SHELL DREDGE, HOE AND

DIPPER, SHOVELS AND SHOVEL ATTACHMENTS, CRANES AND

BULLDOZERS.

ENGI0612-013 06/01/2014

LEWIS, PIERCE, PACIFIC (THAT PORTION WHICH LIES NORTH OF A

PARALLEL LINE EXTENDED WEST FROM THE NORTHERN BOUNDARY OF

WAHKAIKUM COUNTY TO THE SEA IN THE STATE OF WASHINGTON) AND

THURSTON COUNTIES

W912DW-17-B-0004 WA160105 - 11 R0002

PROJECTS:

CATEGORY A PROJECTS (excludes Category B projects, as shown below)

POWER EQUIPMENT OPERATOR

WORK PERFORMED ON

HYDRAULIC DREDGES

GROUP 1....................$ 35.93 17.40

GROUP 2....................$ 36.93 17.40

GROUP 3....................$ 37.35 17.40

GROUP 4....................$ 38.39 17.40

GROUP 5....................$ 36.93 17.40

GROUP 6....................$ 37.35 17.40

ZONE 2 (26-45 radius miles) - Add $1.00 to Zone 1 rates ZONE 3 (Over 45 radius miles) - Add $1.30 to Zone 1 rates

BASEPOINTS: Tacoma, Olympia, and Centralia

CATEGORY B PROJECTS - 95% of the basic hourly rate for each group plus full fringe benefits applicable to Category A projects shall apply to the following projects: Reduced rates may be paid on the following:

1. Projects involving work on structures such as buildings and structures whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract.

2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded.

3. Marine projects (docts, wharfs, etc.) less than $150,000

WORK PERFORMED ON HYDRAULIC DREDGES:

GROUP 1: Assistant Mate (Deckhand GROUP 2: Oiler GROUP 3: Assistant Engineer (Electric, Diesel, Steam or Booster Pump); Mates and Boatmen GROUP 4: Craneman, Engineer Welder GROUP 5: Leverman, Hydraulic GROUP 6: Maintenance

HEAVY WAGE RATES APPLIES TO CLAM SHEEL DREDGE, HOE AND

DIPPER, SHOVELS AND SHOVEL ATTACHMENTS, CRANES AND

BULLDOZERS

HANDLING OF HAZARDOUS WASTE MATERIALS

H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing, Class "D" Suit - Base wage rate plus $ .50 per hour.

H-2 Class "C" Suit - Base wage rate plus $1.00 per hour.

H-3 Class "B" Suit - Base wage rate plus $1.50 per hour.

H-4 Class "A" Suit - Base wage rate plus $2.00 per hour.

* ENGI0701-003 01/01/2017

CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH), SKAMANIA, AND

W912DW-17-B-0004 WA160105 - 12 R0002

WAHKIAKUM COUNTIES

DREDGING:

Dredging:

ZONE A

ASSISTANT ENGINEER.........$ 42.80 14.35

ASSISTANT MATE.............$ 37.44 14.35

LEVERMAN, DIPPER,

FLOATING CLAMSHELL.........$ 45.96 14.35

LEVERMAN, HYDRAULIC........$ 45.96 14.35

TENDERMAN..................$ 41.31 14.35

ZONE B

ASSISTANT ENGINEER.........$ 45.80 14.35

ASSISTANT MATE.............$ 40.44 14.35

LEVERMAN, DIPPER,

FLOATING CLAMSHELL.........$ 48.96 14.35

LEVERMAN, HYDRAULIC........$ 48.96 14.35

TENDERMAN..................$ 44.31 14.35

ZONE C

ASSISTANT ENGINEER.........$ 48.80 14.35

ASSISTANT MATE.............$ 43.44 14.35

LEVERMAN, DIPPER,

FLOATING CLAMSHELL.........$ 51.96 14.35

LEVERMAN, HYDRAULIC........$ 51.96 14.35

TENDERMAN..................$ 47.31 14.35

ZONE DESCRIPTION FOR DREDGING:

ZONE A - All jobs or projects located within 30 road miles of Portland City Hall.

ZONE B - Over 30-60 road miles from Portland City Hall.

ZONE C - Over 60 road miles from Portland City Hall.

*All jobs or projects shall be computed from the city hall by the shortest route to the geographical center of the project.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO

W912DW-17-B-0004 WA160105 - 13 R0002

is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those

W912DW-17-B-0004 WA160105 - 14 R0002

classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

W912DW-17-B-0004 WA160105 - 15 R0002

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT & CONTRACTING REQUIREMENTS

00 21 00 Instructions, Conditions and Notice to Offerors 00 45 00 Representations and Certifications and other

Statements of Offerors, and Pre-Award Information 00 72 00 Contract Clauses

00 73 00 SPECIAL CLAUSES

00 73 00-A List of Drawings

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 11 04 SUPPLEMENTARY REQUIREMENTS FOR YAKIMA TRAINING CENTER

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 26-A Preliminary Accident Notification Worksheet

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 50 00-A Project and Safety Signs

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19-A Construction General Permit (CGP) Guidance 01 57 19-B Immediate Action Procedures for Petroleum or Chemical

Spill

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 74 19-A Construction & Demolition Diversion/Disposal Report Form

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 41 00-A HAZMAT SURVEYS BLDGS 223 & 3423

02 41 00-B PHOTOS BLDGS 223 & 3423

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 13.00 10 ASBESTOS ABATEMENT

02 83 19.13 10 LEAD-BASED PAINT ABATEMENT

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 30 12 ROOFING UNDERLAYMENT

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 61 15 ALUMINUM STANDING SEAM ROOFING

07 72 53 SNOW GUARDS

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOOR AND FRAMES

08 34 16.10 STEEL SLIDING HANGAR DOORS

08 45 23 INSULATED TRANSLUCENT FIBERGLASS PANEL WALL SYSTEM

08 51 13 FIXED ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 27 25 SAFETY STRIPING

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 90 00 PAINTS AND COATINGS

09 96 50 URETHANE TOPCOATING

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 22 13 WIRE MESH PARTITIONS

10 26 00 WALL PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 81 29 HORIZONTAL FALL PROTECTION

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS, GRIDS, AND FRAMES

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING

SYSTEMS

23 11 25 FACILITY GAS PIPING

23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 13.10 30 ELECTRIC METERS

26 32 13.16 GASEOUS EMERGENCY ENGINE GENERATORS

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 35 44 HIGH POWER, 28 VDC, ADJUSTABLE DIRECT CURRENT POWER

SUPPLIES

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 74 INTERIOR FIRE DETECTION AND ALARM SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 21 13 RADON MITIGATION

31 31 16.19 TERMITE CONTROL BARRIERS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 16 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY

PAVEMENTS

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 17 23 PAVEMENT MARKINGS

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 11 23 NATURAL GAS

33 30 00 SANITARY SEWERS

33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING

-- End of Project Table of Contents --

YTC Medevac Hangar 17002 JBLM - Yakima Training Center, WA W912DW-17-B-0004

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 41 00

DEMOLITION

05/10

PART 1 GENERAL

1.1 REFERENCES

1.2 PROJECT DESCRIPTION

1.2.1 Demolition/Deconstruction Plan

1.2.2 General Requirements

1.2.3 Work Plan

1.3 ITEMS TO REMAIN IN PLACE

1.3.1 Existing Construction Limits and Protection

1.3.2 Weather Protection

1.3.3 Trees

1.3.4 Utility Service

1.3.5 Facilities

1.4 BURNING

1.5 AVAILABILITY OF WORK AREAS

1.6 SUBMITTALS

1.7 QUALITY ASSURANCE

1.7.1 Dust and Debris Control

1.8 PROTECTION

1.8.1 Traffic Control Signs

1.8.2 Protection of Personnel

1.9 FOREIGN OBJECT DAMAGE (FOD)

1.10 RELOCATIONS

1.11 EXISTING CONDITIONS

PART 2 PRODUCTS

2.1 FILL MATERIAL

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

3.1.1 Structures

3.1.2 Utilities and Related Equipment

3.1.2.1 General Requirements

3.1.2.2 Disconnecting Existing Utilities

3.1.3 Chain Link Fencing

3.1.4 Paving and Slabs

3.1.5 Roofing

3.1.5.1 Temporary Roofing

3.1.5.2 Reroofing

3.1.6 Masonry

3.1.7 Concrete

3.1.8 Structural Steel

3.1.9 Miscellaneous Metal

3.1.10 Carpentry

SECTION 02 41 00 Page 1

3.1.11 Carpet

3.1.12 Acoustic Ceiling Tile

3.1.13 Air Conditioning Equipment

3.1.14 Cylinders and Canisters

3.1.15 Locksets on Swinging Doors

3.1.16 Mechanical Equipment and Fixtures

3.1.16.1 Preparation for Storage

3.1.16.2 Piping

3.1.16.3 Ducts

3.1.16.4 Fixtures, Motors and Machines

3.1.17 Electrical Equipment and Fixtures

3.1.17.1 Fixtures

3.1.17.2 Electrical Devices

3.1.17.3 Wiring Ducts or Troughs

3.1.17.4 Conduit and Miscellaneous Items

3.1.18 Elevators and Hoists

3.2 CONCURRENT EARTH-MOVING OPERATIONS

3.3 DISPOSITION OF MATERIAL

3.3.1 Title to Materials

3.3.2 Reuse of Materials and Equipment

3.3.3 Salvaged Materials and Equipment

3.3.4 Disposal of Ozone Depleting Substance (ODS)

3.3.4.1 Special Instructions

3.3.4.2 Fire Suppression Containers

3.3.5 Transportation Guidance

3.3.6 Unsalvageable and Non-Recyclable Material

3.4 CLEANUP

3.5 DISPOSAL OF REMOVED MATERIALS

3.5.1 Regulation of Removed Materials

3.5.2 Burning on Government Property

3.5.3 Removal to Spoil Areas on Government Property

3.5.4 Removal from Government Property

3.6 REUSE OF SALVAGED ITEMS

ATTACHMENTS:

02 41 00-A

02 41 00-B

-- End of Section Table of Contents --

SECTION 02 41 00 Page 2

SECTION 02 41 00

DEMOLITION

05/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)

AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes

AASHTO T 180 (2015) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations

CARPET AND RUG INSTITUTE (CRI)

CRI CIS (2011) Carpet Installation Standard

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. DEFENSE LOGISTICS AGENCY (DLA)

DLA 4145.25 (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders http://www.aviation.dla.mil/UserWeb/aviationengineering/

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 4000.25-1-M (2006) MILSTRIP - Military Standard

SECTION 02 41 00 Page 3

Requisitioning and Issue Procedures

MIL-STD-129 (2014; Rev R) Military Marking for Shipment and Storage

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels

1.2 PROJECT DESCRIPTION

1.2.1 Demolition/Deconstruction Plan

Prepare a Demolition Plan and submit proposed demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.

Coordinate with Waste Management Plan. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.

1.2.2 General Requirements

Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the buildings . In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

In the interest of conservation, salvage and deconstruction shall be pursued to the maximum extent possible; salvaged items and materials shall be disposed of as specified. See Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT paragraph GOVERNMENT POLICY for required C&D diversion minimums.

1.2.3 Work Plan

The procedures proposed for the accomplishment of the work. The procedures shall provide for safe conduct of the work, including procedures and methods to provide necessary supports, lateral bracing and shoring when required, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations in accordance with EM 385-1-1.

SECTION 02 41 00 Page 4

1.3 ITEMS TO REMAIN IN PLACE

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.

Coordinate the work of this section with all other work indicated.

Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.3.1 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement.