16Q00520002.pdf

PDF 54 KB Posted

Attached to
Green River Weather Forecasts Federal contract opportunity
Solicitation number
W912DW-16-Q-0052
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Green River Weather Forecasts, newest first.
File Type Posted
16Q00520003.pdf PDF
Weather_hydro_forecasting_SOW_QA.pdf PDF
16Q00520001.pdf PDF
16Q0052.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is to publicize questions and answ ers and provide a modified Statement of Work.

1. CONTRACT ID CODE PAGE OF PAGES

1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-16-Q-0052

X 9B. DATED (SEE ITEM 11)

14-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jun-2016

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CECT-NWS

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-16-Q-0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PWS

May 4, 2016 (Updated June 23, 2016)

S C O P E O F W O R K

Generation and Delivery of Meteorological and Hydrological Forecasts for the Green River Basin

1. Scope of Work. The services rendered under this delivery order will be provided during a Base Year with four (4) Option Years as identified in the Period of Performance in Section 6. The provider shall generate and deliver to the Seattle District, U. S. Army Corps of Engineers (NWS), meteorological and hydrological forecasts for the Green River basin of Washington State and graphical images for selected outputs from the extended Weather Research and Forecast model (version 3.5.1 or later) coupled with the National Weather Service Global Forecast System forecast model (WRF-GFS) and the European Center for Medium Range Weather Forecasting forecast model (WRF-ECMWF) at a regional scale. As noted in Section 2, the services to be delivered under this contract are separated into three distinct products (designated as CLIN 0001, CLIN 0002, and CLIN 0003 in Section 2). The services to be delivered under CLIN 0001 are the calibration of the hydrological model used for streamflow forecasts. CLIN 0001 is only applicable to the base year of the contract period. The services to be delivered under CLIN 0002 are the generation and delivery of meteorological and hydrological forecasts for the Green River basin. The forecasts will be generated using a high-resolution weather prediction model coupled with a distributed hydrologic model specifically calibrated to the Green River basin. The collective modeling system (weather prediction model and hydrologic model) will be used to provide short-range meteorological and hydrological (streamflow) forecasts to NWS on a daily basis for a four-month period beginning 1 November and ending 28 February during each contract award performance period. Forecast information delivered to NWS will include quantitative precipitation forecasts (QPF’s) for selected locations within the Green and White River basins and other pre-determined sites within Washington State as defined by the current regional meteorological model. The provider will also deliver to NWS streamflow forecasts for total runoff into Howard Hanson reservoir (reservoir inflow), total runoff from the Soos Creek basin, total local runoff entering the Green River between Howard Hanson dam and the Green River at Auburn USGS gaging station (this includes runoff from the Soos Creek basin), and natural (unregulated) flow in the Green River at the Auburn USGS gage. Forecast information will be updated at least four times daily during the duration of the service period. Forecast information will be provided to NWS via a password protected website and via a secure ftp site. The provider will have available two separate dedicated “T1” lines to transmit forecast information to their internet site to ensure that the forecast information can be made available at all times to NWS.

The services to be delivered under CLIN 0003 are the generation and delivery of graphical images showing specified output from two different global models (WRF-GFS; WRF-ECMWF). Forecast graphical images will be provided to NWS on a daily basis (updated at least twice daily) for a 12-month period beginning 1 August and ending 31 July during each contract award performance period. Forecast information will be provided to NWS via website.

A more detailed summary of the deliverable forecast information covered under this scope of work is presented in Section 2. Other pertinent information relative to this scope of work is described in Sections 3-5. A Period of Performance is provided in Section 6.

2. Services to be performed by the provider. The provider will supply services under this scope of work as noted below:

a. CLN 0001 Hydrological model calibration. The Distributed-Hydrology-Soil-Vegetation Model (DHSVM, University of Washington) will be used to generate hydrological forecasts. Prior to the flood season (Nov. 1) during the base year of the contract, the model will be calibrated using historical hydrological and meteorological observations publicly available and provided by NWS. These observations include hourly station based temperature and precipitation, stream discharge, and snow water equivalence (SWE) at SNOTEL observation locations (NRCS). The model will be calibrated to accurately represent streamflow response to precipitation and snowmelt, and snow accumulation and melt timing. Locations for model calibration and validation include inflow to Howard Hanson reservoir, streamflow at Soos Creek near Auburn, WA (USGS 12112600), and SWE at Cougar Mountain, Lynn Lake, and Sawmill Ridge. In addition, a methodology for determining the optimal model state for which to start simulations from for forecast time periods will be included as a component in model calibration. The determination of this initial state will utilize real-time observations in the basin from the period leading up to the forecast period.

b. CLIN 0002

i. Delivery of meteorological forecasts. The weather prediction model used to generate these forecasts is the Weather Research and Forecast model driven with two global weather models (WRF-GFS and WRF-ECMWF). Meteorological forecast information delivered to NWS will include quantitative precipitation forecasts (QPF’s) for up to five locations within the Green River basin, four locations within the White River basin, and other pre-determined sites within Washington State as defined by the provider’s regional meteorological models (see list of desired QPF locations in Table 1). QPF information will be delivered to NWS based on output from two forecast products for each model.

One forecast product will provide QPF information and temperature for roughly a 7-day forecast window (7 days less about four hours) and the second forecast product will provide QPF information and temperature for roughly a 60-hour forecast window. All types of QPF products will provide forecast precipitation at an hourly time-step histogram, with WRF-GFS superimposed onto WRF-ECMWF. QPF’s will be updated at least once daily for the 7-day forecast product. For the 60-hour forecast product, updates with the WRF-GFS are needed four times daily and with the WRF-ECMWF updates are needed two times per day. Furthermore, the 60-hour QPF product from the WRF-GFS may be updated more than four times per day if certain streamflow thresholds are exceeded. In addition, High Resolution Rapid Refresh (HRRR) forecast hourly precipitation QPF’s, updated hourly, would also be provided. Forecast information will be provided to NWS via a password protected website and via a secure ftp site. The provider will have available two separate dedicated “T1” lines to transmit forecast information to their internet site to ensure that the forecast information can be made available at all times to NWS.

g3ct9gtf Highlight

ii. Delivery of hydrological forecasts. Meteorological input to the DHSVM model for forecasted time periods will be derived from output from the WRF-GFS and WRF- ECMWF weather forecast models. Hydrologic forecast information delivered to NWS will consist of streamflow forecasts for total runoff into Howard Hanson reservoir (reservoir inflow), total runoff from the Soos Creek basin, total local runoff entering the Green River between Howard Hanson dam and the Green River at Auburn USGS gaging station (this includes runoff from the Soos Creek basin), and natural (unregulated) flow in the Green River at the Auburn USGS gage. Hydrologic forecasts will be delivered to NWS based on output from the two forecast products. Both forecast products will provide forecasted streamflow at an hourly time-step. Hydrologic forecasts will be updated at least once daily (7-day forecast product) or at least two to four times daily (60-hour forecast product for WRF-GFS, 4x daily; WRF-ECMWF, 2x daily). Visualizations for each of the 7-day and 60-hour hydrologic products will include forecasts from the WRF-GFS and WRF-ECMWF driven hydrologic simulations on the same plots for comparison. Forecast information will be provided to NWS via a password protected website and via a secure ftp site as discussed under Item “b.” above.

The Government (NWS) will provide the vendor with available real-time meteorologic and hydrologic data from the Green River basin for the purpose of adjusting the hydrologic model to current conditions for which to initialize the model state for the forecast period. The following data will be provided by NWS to the provider:

Precipitation, air temperature, and wind speed from the Ravensdale meteorological station; precipitation and air temperature from the Howard Hanson dam meteorological station; precipitation and air temperature from the Mud Mountain dam (ENUW) meteorological station; precipitation and air temperature from the Lester meteorological station; computed inflow to Howard Hanson reservoir, observed discharge from Howard Hanson reservoir, observed discharge from the Green River at Auburn gaging station, and observed discharge from the Newaukum Creek gaging station. Hourly values for these parameters will be sent to the provider on an hourly basis during the duration of the period of the service agreement. Transmitted parameter values will be time-stamped using Greenwich Mean Time (GMT).

c. CLIN 0003

i. Graphical images in electronic format showing the items specified below based on output from the extended Weather Research and Forecast model (WRF-GFS and WRF-ECMWF) at a 36 km resolution. The spatial domain of the images should cover a longitude range of ~180 W to ~90 W and a latitude range of ~25 N to ~ 63 degrees N. Each of the following graphical products should be produced using a 3-hour time-step (unless noted otherwise) and cover a forecast window that extends 180 hours, and include a looping display capability.

1) SLP (sea level pressure) with forecast winds at a 10 meter height above ground surface.

2) Column integrated water vapor.

3) 850 mb, 700 mb, 500 mb, 300 mb – pressure heights, wind barbs, air temperature (Celsius) – this product consists of four separate color-coded images.

4) Incremental precipitation – 1 hour time-step for a forecast window extending 72 hours, 3 hour time-step for a forecast window extending from 72 to 180 hours.

ii. Graphical images in electronic format showing the items specified below based on output from the extended Weather Research and Forecast model (WRF-GFS and WRF-ECMWF) at a spatial resolution of 36 km. The spatial domain of the images should cover a longitude range of ~135 W to ~105 W and a latitude range of ~33 N to ~ 53 degrees N. Each of the following graphical products should be produced using a 3-hour time-step (unless noted otherwise) and cover a forecast window that extends 72 hours, and include a looping display capability.

1) Incremental precipitation – 1 hour time-step for a forecast window extending 72 hours. This product should also show topographic contours.

2) Cumulative precipitation - Reported at the following forecast time-steps: 12 hours, 24 hours, 36 hours, 48 hours, 60 hours, and 72 hours. This product should also show topographic contours.

3. Submission. The provider will submit the following materials to NWS.

a. Under CLIN 0001, the provider will calibrate the hydrological model (DHSVM) for the Green River basin. This includes the development of a procedure for generating the optimal model state for which forecast simulations are started from. Model calibration will follow the procedure outlined in section 2a. CLN 0001 only is only applicable to the base year of the contract period.

b. Under CLIN 0002, the provider will make available to NWS meteorological and hydrological forecasts as discussed under Item 2 of this scope of work. Forecast information will primarily consist of QPF information for selected sites within Washington State, streamflow forecasts for inflow to Howard Hanson reservoir, Soos Creek discharge, local inflow to the Green River downstream of Howard Hanson dam, and the natural (unregulated) flow in the Green River at the Auburn USGS gage. Meteorological and hydrological forecast information will be provided at an hourly time-step based on the output from four separate forecast products. Forecast products will be used to provide QPF and streamflow forecasts for roughly a 7-day forecast window and roughly a 60-hour forecast window. Each of these forecast products will be generated using WRF-GFS and WRF-ECMWF (totaling 4 forecast products). The 7-day forecast products will be updated on a daily basis during the period of the service agreement. The 60-hour forecast products will be updated at least two to four times per day during the period of the service agreement as specified. Forecast information will be made available to NWS via a password protected website and via a secure ftp site as discussed under Item 2. Forecast information provided to NWS by the provider will be provided in a “SHEF” single record formatted file (an example of the desired format can be provided by NWS to the provider on request).

c. Under CLIN 0003, the provider will make available to NWS graphical forecast images as discussed under Item 2 of this scope of work. Forecast images will be provided at a 36 km resolution for a 180-hour forecast window for sea level pressure, column integrated water vapor;

g3ct9gtf Highlight pressure heights, wind barbs and air temperature (images for these at 850 mb, 700 mb, 500 mb, and 300 mb), and incremental precipitation. Forecast images will be provided at a 12 km resolution for a 72-hour forecast window for incremental and cumulative precipitation. Forecast products will be updated at least twice daily during the period of service. Forecast information will be provided to NWS via website.

4. General Requirements

a. Project Engineer/Scientist. The provider shall designate the name of the individual to accomplish the work under this scope of work. This individual shall be responsible for completion of the work and be the contact for the Government project engineer.

b. NWS point of contact. Larry Schick will be the point of contact regarding technical issues and issues regarding data transmission. Mr. Schick works in the Water Management Section at NWS and can be reached by telephone at 206-764-6898.

c. Extra Services. The provider is advised not to perform any services under this contract requested by any person in the Seattle District Office, orally or in writing, which they consider to be a change in contract price, until they have made a proposal to the Contracting Officer covering such extra services, negotiated a mutually satisfactory fee, and received a written notice to proceed.

5. Coordination. The provider should be available during normal business hours to respond to questions from the Contracting Officer or the project engineer regarding this contract (this includes responding to questions or concerns regarding technical issues). NWS should also be provided access to appropriate provider personnel on a 24-hour basis during critical hydrologic events (i.e., imminent or current flooding) in the event that a data transmission error or failure occurs.

6. Period of Performance. The period of performance shall be for One (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:

Base Year: 1 August 2016 thru 31 July 2017 Option Year 1: 1 August 2017 thru 31 July 2018 Option Year 2: 1 August 2018 thru 31 July 2019 Option Year 3: 1 August 2019 thru 31 July 2020 Option Year 4: 1 August 2020 thru 31 July 2021

The Government reserves the right to extend the term of this contract at the prices set forth in Section B in accordance with the terms and conditions in clause 52.217-9 entitled “Option to Extend the Term of the Contract”.

The provider will provide NWS with forecast information during the period of the service contract as discussed in this scope of work.

Table 1 – List of Desired QPF Locations

Site Location Latitude (degrees) Longitude (degrees)

PARADISE 46.783 -121.747

Anderson Pass 47.698 -123.325

ALPINE MEADOWS 47.782 -121.699

Bellingham 48.802 -122.525 Black Diamond 47.302 -122.1

Blackwall Peak 49.096 -120.772

BUMPING RIDGE 46.812 -121.332

BLEWETT PASS 47.353 -120.68

BURNT MOUNTAIN 47.046 -121.94

Beaver Pass 48.885 -121.25 Blackwall 49.096 -120.772 North Bend 47.482 -121.768 Cat Island 48.885 -121.036 Chester Morse Lake 47.412 -121.725 Colville Island 48.417 -122.821 Concrete 48.541 -121.745

CORRAL PASS 47.021 -121.465

Carbon River Ranger Stn 46.997 -121.913 Crystal Mountain Ski Area 46.938 -121.474

COUGAR MOUNTAIN 47.278 -121.672

Darrington High School 48.25 -121.602

DUNGENESS 47.874 -123.079

Diablo 48.716 -121.14 Donkey Rain Gauge 47.307 -123.767 Eatonville Junior High 46.874 -122.266

ELBOW LAKE 48.693 -121.908

Everett 47.985 -122.2

FISH LAKE 47.537 -121.086

Forks 47.953 -124.384 Glacier Peak 48.113 -121.113

GROUSE CAMP 47.283 -120.488

GREEN LAKE 46.55 -121.171

Howard Hanson 47.277 -121.784 Harts Pass 48.723 -120.669

HUCKLEBERRY CREEK 47.068 -121.587

Hozomeen Lake 48.969 -121.042 Jack Mountain 48.775 -120.955 June Lake 46.15 -122.155 Kalaloch Ranger Station 47.607 -124.371 Kennedy Hot Springs 48.12 -121.193 Klesilkwa SC 49.132 -121.309 Bremerton Airport 47.4833 -122.75 Seattle-Tacoma Int. Airport 47.452 -122.3 Stampede Pass 47.269 -121.317 Lester USGS Gage 47.182 -121.387 Longmire Ranger Station 46.752 -121.811 Lower Puyallup R 47.201 -122.169

LONE PINE 46.274 -121.964

Lightning SC 49.131 -121.306

LYMAN LAKE 48.193 -120.919

Mt Baker Ski Area 48.861 -121.676

MOUNT GARDNER 47.36 -121.568

MOWICH 46.93 -121.952

Mid Puyallup R 47.079 -121.831

MINERS RIDGE 48.204 -120.956

Moclips Rain Gauge 47.255 -124.217 Mt Pilchuck Trailhead 48.07 -121.812

MEADOWS PASS 47.285 -121.472

JUNE LAKE 46.15 -122.155

Mt Rainier 46.855 -121.759

MORSE LAKE 46.908 -121.483

Mt Shuksan 48.833 -121.602 Mt Buckindy 48.354 -121.206

MOUNT CRAG 47.766 -123.026

Mt Redoubt 48.96 -121.301 North Bend 47.4949 -121.786 Newaukum 47.202 -121.967 Olympia 46.969 -122.9

OLALLIE MEADOWS 47.376 -121.442

Orca Profiler 47.279 -122.728

PARK CREEK RIDGE 48.447 -120.915

PIGTAIL PEAK 46.623 -121.386

Point No Point Lighthouse 47.914 -122.526 Pepper Creek 46.1 -121.95

POPE RIDGE 47.993 -120.566

Point Robinson Lighthouse 47.39 -122.374

POTATO HILL 46.351 -121.514

Point Wilson Lighthouse 48.146 -122.754 Quinault Ranger Station 47.504 -123.822 Quinault Rain Gauge 47.65 -124.04 Rainy Pass 48.52 -120.733 Ravensdale 47.3625 -122.01

REX RIVER 47.304 -121.605

SASSE RIDGE 47.387 -121.064

SEATAC Airport 47.452 -122.3 Downtown Seattle 47.5833 -122.33 Shelton 47.217 -123.099

SHEEP CANYON 46.195 -122.254

Skookumchuck Reservoir 46.787 -122.717 Snoqualmie Pass 47.424 -121.41 Soos Creek 47.385 -122.133 Spada Lake 47.977 -121.667

SURPRISE LAKES 46.097 -121.763

SPENCER MEADOW 46.182 -121.926

Sumallo SC 49.255 -121.247

STEVENS PASS 47.748 -121.092

Swamp Creek 48.569 -120.767 Tenino 46.859 -122.852

THUNDER BASIN 48.53 -120.99

TINKHAM CREEK 47.334 -121.47

Tolt Reservoir 47.679 -121.642 Upper Puyallup R 46.834 -121.906 Upper White R 47.036 -121.578

UPPER WHEELER 47.289 -120.37

Verlot 48.1 -121.78

WELLS CREEK 48.868 -121.79

WATERHOLE 47.947 -123.426

Wynoochee Dam 47.388 -123.606

(End of Summary of Changes)