W912DS25R0004.pdf
PDF 2 MB Posted
- Attached to
- DCV Driftmaster drydocking and repairs Federal contract opportunity
- Solicitation number
- W912DS25R0004
About this file
This document is a solicitation (W912DS25R0004) issued by the U.S. Army Corps of Engineers Engineering District New York for the drydocking and repairs of the U.S. Army Corps of Engineers Drift Collection Vessel "DRIFTMASTER".
The major work scope includes drydocking the vessel, cleaning and painting the hull, assisting with ABS and USCG required inspections, and miscellaneous modifications and repairs. The work also includes items to satisfy ABS Annual Hull and Machinery Survey requirements. The contractor shall be responsible for the costs associated with ABS inspection services.
The solicitation provides details on the vessel's specifications, work requirements, contract duration, liquidated damages, contractor responsibilities, and technical provisions for definite and indefinite work items. Potential bidders are encouraged to inspect the vessel prior to submitting offers. Offers are due by 2:00 PM EST on November 21, 2024 and shall be submitted as PDF documents via email.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0002-QandA.pdf | ||
| Reference Drawings.pdf | ||
| 347-E170-01.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DS25R0004
b. TELEPHONE NUMBER
917-790-8089
8. OFFER DUE DATE/LOCAL TIME
2:00 PM 21 Nov 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
07-Nov-2024
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DS9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MATTHEW E LUBIAK
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W912DS 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
OPS - PHYSICAL SUPPORT BRANCH
JOSEPH CASTELLANO
3 CHAPEL AVE., PORT LIBERTE
JERSEY CITY NJ 07305
TEL: 201-309-2348 FAX:
212-264-3013FAX:
TEL: 917-790-8026 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,300
NAICS:
336611
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF15
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912DS25R0004
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
DCV Driftmaster shipyard repairs
FFP
Total price of all work items listed on the below Price Schedule, Total Base (SW- SCs, TP1.01-1.10, TP2.01-2.10) and Total Indefinite Technical Provisions (TP
1.11-1.20, TP2.11-2.18)
FOB: Destination
NET AMT
USACE DCV DRIFTMASTER FY24 Shipyard Price Schedule
AMOUNT
AMOUNT
Drydocking
AMOUNT
Gas Freeing Compartments
AMOUNT
Docking Plugs
AMOUNT
Exterior Cleaning and Painting
AMOUNT
Interior Cleaning and Painting
AMOUNT
Sea Chests
AMOUNT
Hull Anodes
AMOUNT
Deck Hatch Removal and Replacement
AMOUNT
Cleaning of Fuel Tanks
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT
SW-1-SC-19 Job
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 1.01 1
JA
TP 1.02 1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 1.03 1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 1.04 1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 1.05 1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 1.06 1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 1.07 1 JA
TP 1.08 1 JA
TP 1.09 1 JA
Potable Water Tank
Indefinite- Steelwork
Indefinite- Welding Seams
Indefinite- Bilge Water Disposal
Indefinite- Gas-Freeing Compartments
Indefinite- Additional Audio gauging
Indefinite- Replacement of Docking Plugs
Indefinite-Exterior Surface Prep
Indefinite-Forepeak Painting
Indefinite- Compartment 1 Painting
TP 1.10 1 JA
TP 1.11 15,000(EST)
lbs
TP 1.12 1,200 (EST) Feet
TP 1.13
1000 (EST) Gallons
TP 1.14
12 (EST)
EA
TP 1.15
1000 (EST)
TP 1.16
2 (EST)
TP 1.17
1 JA
TP 1.18
TP 1.19 1 JA
Propeller Shaft Bearing Clearances
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 2.03 Propellers 1 JA
AMOUNT
Stern Tube Packing Replacement
AMOUNT
Rudder Post Stuffing Boxes
AMOUNT
Sea Valves
AMOUNT
Sea Valve Replacement
AMOUNT
Deck Vent Check Valves
AMOUNT
Replace Steering Gear Packing
Replace Piping from Air Compressor to Air Handling Tanks
AMOUNT
Indefinite- Rudder and Rudder Post
AMOUNT
Indefinite- Renewal of Deck Vent Stems
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 2.02
Propeller Shafts
1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 1.20 Indefinite- Compartment 2
Painting
1 JA
TP 2.01 1
TP 2.04 1
TP 2.05 1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 2.06 1 JA
TP 2.07 1
TP 2.08 1 JA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 2.09 1 JA
TP 2.11 1
TP 2.10 1 JA
TP 2.12 3 (EST)
Indefinite- Rudder Post Bearings
AMOUNT
Indefinite- Rudder Carrier Bearings
Indefinite-Replacement of Sea Valves
AMOUNT
Indefinite- Propulsion System Alignment
AMOUNT
Indefinite- Propeller Shaft Bearings
AMOUNT
Indefinite- Add 3,500 Gallons of Fuel
AMOUNT
Indefinite- Miscellaneous work associated with the repair of the vessel $25,000 Not to Exceed $25,000
AMOUNT
Note: Indefinite Items are estimated quantities (EST).
TOTALS
Total Base (SW-SCs, TP1.01-1.10, TP2.01-2.10) $ ________________________
Total Indefinite Technical Provisions (TP 1.11-1.20, TP2.11-2.18): $ _________________
Total Base + Indefinite Work Items: $
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 2.13 2 (EST) EA
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 2.14 2 (EST) EA
TP 2.16 1
TP 2.15 7 (EST) EA
TP 2.17 1
TP 2.18 3500 (EST) GAL
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
TP 3.01 1
NTE
W912DS25R0004
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
SPECIFICATIONS FOR 2024 REPAIRS TO DCV "DRIFTMASTER"
STATEMENT OF WORK
SW-1 Description of Work
a. The work consists of furnishing all labor, materials, fittings, equipment, tools, power, compressed air, etc., and performing all work on U.S. Army Corps of Engineers Drift Collection Vessel "DRIFTMASTER" specified herein unless otherwise noted. The principal dimensions and physical data for the vessel are shown below:
GENERAL DESCRIPTION
Length Overall ...............................................99'-1-1/8" Breadth, Molded ............................................36'-0" Depth, Molded ...............................................10’-0” Material ..........................................................All Welded Steel Displacement, light ........................................250 short tons Propellers (2) ..................................................58"Dx44"P, 3 blade Hull Form .......................................................Catamaran ABS I.D. No
b. The major workscope includes drydocking the vessel, cleaning and painting the hull, assisting with ABS and USCG required inspections, and miscellaneous modifications and repairs in accordance with these specifications.
c. The workscope also includes various items required to satisfy the requirements of the American Bureau of Shipping (ABS) Annual Hull and Machinery Surveys. The Contractor shall be responsible for the costs associated with providing the inspection services of ABS.
d. Wherever the term "Plant" is used in these specifications, it is understood to refer to the items of floating plant named in this paragraph, together with their normal appurtenances, equipment, and supplies.
e. General vessel arrangements and details are included in the attached file named “Reference Drawings.pdf”. The accuracy of these drawings has not been verified. Therefore, the Contractor shall template all work from the vessel. Potential bidders are encouraged to inspect the vessel prior to submitting a bid. See Contract Clause SW-7 for more details.
f. The Contractor shall furnish the necessary facilities for and shall bear the expense of any movement of the plant while it is in his or her possession.
E3CT9MEL
Highlight
g. Removal and/or relocation of any parts, equipment, fluids, etc. for interference or access shall be the responsibility of the Contractor. Similarly, all interference and access removals shall be reinstalled by the Contractor at his/her expense. Any damage from removal or relocation of parts, equipment, etc. shall be repaired or replaced at the Contractor’s expense.
h. The Contractor's work shall comply with ABS "Rules for Building and Classing Steel
Vessels" and USCG "Rules and Regulations for Subchapter I, Vessels" as found in the Code of Federal Regulations (Title 46, CFR).
SW-2 Indefinite Workscope
a. The Contractor shall notify the Contracting Officer (KO) or the Contracting Officer’s
Representative (COR) when any of the indefinite technical provisions approach 90% of the quoted quantity for the respective items noted in the Contract. The Contractor is not authorized to exceed the quantity specified for each indefinite item in this Contract without written authorization from the KO.
b. The Contractor shall perform all definite technical provisions in sufficient time for the KO to direct such indefinite technical provisions as may be revealed to be necessary by the performance of the definite technical provisions.
c. The direction of any indefinite technical provisions by the KO or COR will be prompt so as to allow for completion of the indefinite technical provisions within the Contract duration.
Note – Before any work can be performed under the indefinite items, the KO must first issue a Notice to Proceed (NTP) for each item. After the NTP has been issued, the COR may direct work under that indefinite item up to the quantity that is allowed for in the Contract.
SW-3 Condition Found Reports
The Contractor shall notify the KO or the COR of any additional work or abnormal condition found requiring attention by the Contractor by means of filing a Condition Found Report (CFR).
The Contractor’s CFRs shall be submitted to the KO within 3 business days of the discovery of additional work and shall include a work scope, cost estimate to include labor, materials, and any schedule impacts the work would have on the contract delivery date.
SW-4 Mastership Agreement
Prior to the award of this Contract, the Contractor shall enter into a "Mastership Agreement for Repair and Alteration of Vessels". If the Contractor has entered such an agreement prior to this Contract, that agreement may be utilized. For more information, see DFARS Subpart 252.21771, Master Agreement for Repair and Alteration of Vessels.
SW-5 Contract Duration
The Contract duration is forty-five (45) calendar days after delivery of the vessel to Contractor’s yard. The Contractor shall take delivery of the vessel at an agreed upon date within fifteen (15) calendar days after award. The Contractor is responsible for completing all definite and indefinite technical provisions within the forty-five (45) calendar day Contract duration. See Paragraph SC-1 for additional details.
SW-6 Distance Restriction From Caven Point Terminal
Per DCV Driftmaster COI states that Routes Permitted is “Lakes, Bays, and Sounds.” Routes permitted is determined by the size, shape, and stability of the vessel. The work performance location shall be limited to the area within the project boundary labeled “Limit of Drift Removal Project,” as shown on the project map “New York Harbor NY and NJ Collection and Removal of Drift,” dated 30 September 1986, plus extended locations outside of this boundary, deemed safely navigable to reach by DCV DRIFTMASTER as follows:
No further than a 100 nautical mile voyage via navigable waters eastward from the East Project Boundary in Long Island Sound (Port Chester).
No further than a 70 nautical mile voyage via navigable waters northward from the North Project Boundary in the Hudson River (Tappan Zee).
SW-7 Pre-bid Vessel Inspections
Pre-quote inspections may be held to allow all prospective vendors to inspect the vessel. The pre-quote inspections can be held by appointment in Jersey City, NJ. Representatives of prospective vendors wishing to attend should contact William Lyness at (201) 309-2360 for the specifics of the exact location and time.
During the pre-quote inspections, vendors will be allowed unencumbered access throughout the entire vessel. Representatives of the Government will be available, but only to the extent necessary to escort vendors and assist with access. Government Representatives on the vessel will not discuss the scope of the work or make any technical clarifications or interpretations.
After each inspection, Offerors shall submit any questions to the the Contracting Officer, Matthew Lubiak, or The Contract Specialist Monica Coniglio via email matthew.e.lubiak@usace.army.mil and monica.n.coniglio@usace.army.mil . The Government will prepare answers to all questions and forward a copy of both the questions and answers to all prospective vendors through form Solicitation Amendment.
SPECIAL CONDITIONS
SC-1 Pre-Award Survey, Delivery, Commencement, Completion of Work and Return of
Plant
a. The Government may request a Pre-Award Survey prior to award in accordance with FAR
9.106 to verify that the Contractor is able to comply with the required performance schedule, taking into consideration all existing commercial and government business commitments and has the necessary production, construction, and technical equipment and facilities (drydock), or the ability to obtain them.
b. To minimize the vessel’s time out of service and to allow for flexibility in scheduling, the Government will deliver the plant to the nearest slip at the Contractor's facility on a date mutually agreed on by the Government and the Contractor, not to exceed fifteen (15) Calendar Days after Notice to Proceed.
c. The Government will accept return of the plant in open water, clear of the Contractor's yard or any other berthing facility used in connection with Contract work upon completion of the Contract.
d. The Contractor shall commence the work under the Contract within seven (7) days after delivery of the vessel to the Contractor’s facility and shall execute the work within the duration stated in the Contract. The Contract duration shall be computed from and including the first calendar day after delivery of the vessel to the Contractor.
e. The time for completion shall be computed to the hour at which the plant is accepted by the
COR in open water clear of the Contractor's yard. The date of completion shall be considered as half a day if the plant is accepted by the COR before 12:00 o'clock Noon and as a whole if accepted after 12:00 o'clock Noon. If all work is not satisfactorily completed when the plant is returned to the COR, the Contractor shall complete the work remaining to be done and any working time lost by the plant thereafter, because of any activities of the Contractor in completing said work, shall be included in the computation of time.
SC-2 Berthing, Drydocking, and Services
Upon receipt of the vessel, the Contractor shall drydock the vessel within five (5) calendar days and for such time that will be necessary to complete all underwater work included in these specifications. Following completion of underwater work, a drydock shall remain available at all times to the vessel for the duration of the contract.
Certification for the drydock to be used to hold the vessel shall be submitted with the Contractor’s quote. The drydock shall be certified for docking the vessel of the dimensions and weight given by one of the following:
(a) US Navy, Naval Sea Systems Command
(b) American Bureau of Shipping (ABS)
(c) An independent registered Professional Engineer specialized in drydocks, who shall cover the inspection requirements of item (a) or (b) above.
The Inspection Certificate shall be within three (3) years if the age of the dock is less than ten
(10) years old and within two (2) years if the age of the dock is over ten (10) years old.
Floating drydocks shall be one integral unit. The Government will allow the coupling of two rated docks to meet the load requirements of the vessel, provided that the lifting plan used shall include provisions for ensuring integrity of the coupling in the event of foul weather. Linked drydocks shall be certified as an entity. Due to the age of the vessel, use of a travel lift has been determined to not be technically feasible.
For additional information on drydocking requirements, see TP 1.01
SC-3 Contractor Quote Submittals
The Contractor shall provide the following as part of his/her quote:
Drydock certifications in accordance with SC-2 Welder certification in accordance with SC-9 A project schedule in accordance with SC-18
SC-4 Liquidated Damages
a. In the case of failure on the part of the Contractor to complete the work within the time frame in the Contract or any extensions thereof, the Contractor shall pay the Government as liquidated damages, the sum of $3,240.00 for each calendar day of delay until the work is completed or accepted.
b. The Contractor shall not be charged with liquidated damages when the delay in delivery or performance arises out of causes beyond the control and without the fault or negligence of the Contractor as defined in the Default Clause of the Mastership Agreement for Repairs and Alterations of Vessels (DFARS Clause 252.217-7009 - Default).
SC-5 Contractor's Custody of Plant
a. On entering and leaving dry dock, or marine railway, the Contractor shall have charge of, and be responsible for a vessel not operating under its own power. If tug or pilot service is required during delivery or return of the plant or at any time during Contractor's custody for maneuvering the plant between open water and dry dock, slip or berth at the Contractor's yard or other facility, or for moving the plant for any reason during the course of Contract work, such service shall be promptly furnished by the Contractor at his/her expense. This shall not exclude the right of the Government to move its plant around the Contractor's premises using the Government's personnel and facilities if the Government representative considers such movement of the plant to be in the interests of safety of the plant, or otherwise in the Government's interests.
b. The Government shall have the right to access its plant while in the Contractor's custody with
Government or Government contracted owned or hired floating plant or personnel for the purpose of conducting work onboard, delivering equipment, materials or personnel, or conducting work to the plant in the Contractor's custody.
c. The Contractor shall not permit the plant to go aground or bear upon the bottom of any waterway or any submerged object while in his/her possession. The Contractor shall not perform any contract work on the plant if it should accidentally go aground or bear upon any submerged object and shall notify the COR immediately and take the necessary steps to refloat the plant. The sole exception to this shall be that the plant shall be allowed to rest or bear upon a drydock which is properly prepared, in accordance with the plant's drydocking plan.
SC-6 Accident Prevention
The Contractor shall provide an Accident Prevention Plan, which addresses fire protection, flood prevention and work site safety, to the COR. The Contactor’s Accident Prevention Plan shall be in compliance with all USACE safety manual EM385-1-1, federal, state, and local regulations as well as USCG, ABS regulations. This information shall be submitted no later than seven (7) days after the Contract award date and shall be a prerequisite to the start of any work on the vessel. The Contractor shall not commence the work of this contract until the Contractor’s Accident Prevention Plan has been approved by the Government.
It is the Contractor’s responsibility to perform all work under this Contract in strict accordance with their Accident Prevention Plan as well as all federal (ex. 29 CFR), state, local, USCG, ABS, and USACE regulations (EM 385-1-1).
a. The Contractor shall take all necessary precautions for the protection of the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this Contract. The Contractor shall comply with all pertinent provisions of the Mastership Agreement for Repair and Alteration of Vessels and the Corps of Engineers Safety and Health Requirements Manual EM 385-1-1, dated 15 March 2024 as amended and shall also take or cause to be taken such additional measures as the COR may determine to be reasonably necessary for the purpose. The Contractor shall also comply with OSHA Safety and Health Standards 29 CFR.
The Contractor shall designate the entire area of work as a hardhat area
b. A qualified employee shall be designated by the Contractor to be directly responsible for full and immediate compliance with all applicable safety and fire protection requirements. The COR will make a safety inspection of shipyard facilities upon arrival of the vessel at the Contractor's yard. At such time the Contractor's safety program will be reviewed with the Contractor's safety representative.
c. In addition to other fire protection measures and hose lines required, the Contractor shall connect a shore fireline to the ship's firemain of the same pressure as required by USCG regulations for service at sea. If at any time, it becomes necessary to disconnect the ships firemain or any part thereof, the Contractor shall furnish individual hose lines to the unprotected locations as required by the Inspection and Manner of Doing Work Clause of the Mastership Agreement for Repair and Alteration of Vessels (DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work). When the specifications require work in areas fitted with the fixed CO2 systems (i.e. machinery spaces), the COR shall be notified prior to commencing work. All work in these areas shall be in strict accordance with 29 CFR
1915.506 and substitute fire protection equipment shall be furnished by the Contractor during the test or repair period.
d. Fire watches shall be posted wherever hot work is performed. Fire watches shall also be posted on the opposite side of all adjacent bulkheads, decks, and overheads where the hot work is performed. All fire watches shall remain on site until 30 minutes after the hot work is completed. For additional requirements, see 29 CFR 1915. It should be noted that 29 CFR
1915.52 (b)(3) only requires additional fire watches for specific conditions, however the Contractor shall provide fire watches for all hot work as mentioned above.
e. The Contractor is responsible for compliance with USCG regulations for handling of inflammable and combustible liquids. Whenever hot work is to be performed, a certified marine chemist's gas-free certificate shall be furnished to the Government representative at the Contractor's expense prior to commencing work. Additionally, a copy of the most recent gas-free certificate shall be posted near the vicinity of the work and at each gangway for the vessel. The Contractor shall have the marine chemist recertify the vessel for all ongoing hot work permits in the event of any vessel movement or change in ballasted condition or in the case of any combustible liquid spillage. Following any of these events, inspection for recertification by a Competent Person is unacceptable. NOTE – See TP 1.02 for additional details and requirements.
f. All work in confined areas or enclosed spaces shall be performed in accordance with
Sections 19.A.08 and 34.B of EM 385-1-1, "Safety and Health Requirements Manual", dated 15 March 2024 as amended. In such areas or spaces the Contractor shall test for the concentration of oxygen and have a sufficient number of respirators readily available for everyone working in such areas or spaces. An attendant shall be stationed outside every confined space while work is being performed therein and a rescuer equipped with respirators and retrieval lines shall be immediately available in case of an emergency.
g. The Contractor shall furnish a gangway, conforming to EM 385-1-1, most recent revision, of suitable strength and construction for safe and convenient boarding of the vessel at all times.
The gangway shall be installed at an angle of less than 40 degrees and shall have 39-inch high guardrails at both sides. Hatches and openings that present a falling hazard shall be provided with suitable and substantial guards.
h. All exits and passageways shall be kept free of obstructions and shall be kept well lighted at all times.
i. The Contractor shall maintain an accurate record of, and shall report to the COR, in the manner and on the forms prescribed by the COR, exposure data and all accidents, resulting in death, traumatic injury, occupational disease, and/or damage to property, materials, supplies and equipment incident to work performed under this Contract.
j. The COR will notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor.
k. Compliance with the requirements of this provision (SC-6) by any subcontractors shall be the responsibility of the Contractor.
SC-7 Performance of Work by the Government
The Government reserves the right to quarter and subsist the crew on the vessel and to perform certain work while the plant is in the Contractor’s possession. Government/Government contracted personnel, as well as materials, equipment, and tools, shall be permitted to access the vessel while in the Contractor’s possession and to perform the work mentioned above.
SC-8 Labor Reports
The Contractor shall keep and maintain complete payroll records for the duration of time covering the work under this Contract for a period of three (3) years from the end of such periods, and such records shall be made available for Government inspection upon request.
SC-9 Workmanship
a. General
1. All labor shall be especially skilled for each kind of work, thorough and first class in every respect, and under competent direction.
2. Where work of one trade joins, passes through or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable construction shall be corrected by the Contractor at no additional cost to the Government.
3. All parts of the work intended to join or bear upon others shall have complete and solid surface contact and fit together neatly without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit. Stopwaters shall be used only in seams or landings passing through or attached to watertight members.
4. All watertight staples and collars shall be malleable castings or forged from angles close fitting and with solid bearing over the entire faying surface. They may be riveted and caulked or welded watertight.
5. Ends of outstanding flanges shall be cropped.
6. Lightening holes may be punched or burned and all edges shall have burrs removed.
7. All hull castings shall be machined or ground to bear solidly against the connecting structure and all holes drilled. Holes in members having sharp curvature shall be avoided whenever practicable.
8. Limber and air holes in adequate size shall be cut in floors and elsewhere to provide free drainage and passage of air. Limber holes shall be located at the level of any cement waterways.
9. All new and disturbed iron and/or steel work shall have its finish restored in kind, or as otherwise indicated by specification.
b. Cutting
1. All edges and corners of plates and shapes shall be smooth and free of burrs. The use of a cutting torch is permissible for cutting plates and shapes to size. However, burning of bolt or rivet holes will not be permitted. New hull or bulkhead plates installed under this Contract shall have 2" minimum radius corners unless otherwise directed by the COR.
Hull plate welding seams shall overlap bulkhead joints a minimum of 3”.
c. Welders and Welding
1. All welding performed under this Contract shall be accomplished only by welders who have successfully passed the qualification tests of ABS, the American Welding Society and/or the ASME for the type of welding to be performed by each welder. Copies of the certifications of each welder the Contractor wishes to use for Contract work shall be provided to the COR by the Contractor prior to the beginning of Contract work.
2. The Contractor shall bear the expense of conducting these tests and shall certify by name to the COR, welders who have successfully passed the prescribed test. The Contractor shall require any welder to repeat these tests when, in the opinion of the COR, the work of the welder indicated a reasonable doubt of his/her efficiency. In such cases, the welder shall be re-certified as above if he/she successfully passes the re-test.
3. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld. Electrodes shall be received on the job in unbroken packages bearing the manufacturer's label or be otherwise marked. Certified statements shall accompany each shipment of electrodes to the effect that sample pieces, representatives of each kind and size in each shipment, have satisfactorily passed the tests required by ABS. Electrodes shall be stored as recommended by the manufacturer.
4. All welding procedures shall conform to American Bureau of Shipping standards where applicable.
5. Welding procedures, as to direction, length, number and sequence of beads, shall be carefully planned so as to minimize locked up stresses, shrinkage and distortion.
d. Standard Parts
1. All articles, fittings, equipment, machinery and supplies used in the work covered by these specifications shall, as far as possible, be the manufacturer's standard articles, of reliable make, the manufacturer's current product, for which spare parts are readily available.
2. All materials, equipment, and machinery installed in or delivered with the vessel shall be new and of the quality specified herein.
SC-10 General Requirements for Surface Preparation, Coating System, and Painting
a. All paint specified to be applied under this Contract shall be furnished by the Contractor unless stated otherwise.
b. Surface preparation, painting, staining, and varnishing of new and old construction, shall be in compliance with "Painting: New Construction and Maintenance", EM 1110-2-3400, 30 April 1995. All paint in use shall be thoroughly mixed at frequent intervals. Any materials not specified shall be the best of their kind suitable for marine work and subject to the approval of the COR.
c. During all exterior sandblasting and painting operations the Contractor shall ensure that all areas of the drydock that are open to the atmosphere are covered (i.e. curtained) to prevent the dust cloud from spreading to other areas, specifically outside of the drydock. Similarly, if a marine railway is used for removing the vessel from the water, the Contractor shall ensure that all areas surrounding the vessel are covered to prevent the dust cloud from spreading to other areas.
d. Following the completion of all sandblasting, the Contractor shall remove and properly dispose of all sandblasting grit. All sandblasting grit in interior spaces shall be removed either through the existing tank access openings or through access cuts in the hull or the main deck made by the Contractor. Should the contractor choose to make access cuts for this purpose or for ventilation, dehumidification, or hose passage, the Contractor is responsible for furnishing all labor and materials to renew the steel and coatings in each area. All areas shall be renewed by replacing the removed steel area with a new steel insert of equivalent material properties and plate thickness. After the steel has been renewed, the space shall be air tested in the presence of ABS, USCG, and the COR.
e. Hydroblasting may be utilized in conjunction with sandblasting, however all surfaces shall be sandblasted to provide surface profile.
f. Paint shall not be applied when atmospheric conditions will affect its application or durability.
g. Each coat of paint should adhere firmly and uniformly to the surface to which it is applied.
Sufficient drying time shall be allowed between coats.
h. In general, if paint is sprayed, each coat of paint shall consist of a double spray coat in which the surface or section of a surface to be coated is sprayed in a series of half-lapped passes over the surface or section of the surface, and then sprayed again at right angles to the first spraying direction in half-lapped passes.
i. Following completion of all coatings (exterior and interior), the Contractor shall provide a report from the coatings manufacturer’s representative. The report shall document all coatings, environmental parameters during the application of coatings, and all coating thickness readings. The report shall include a statement from the manufacturer’s representative certifying that the application of all coatings has been performed in accordance with their requirements.
SC-11 Standard Hull Materials
All structural hull material shall be in accordance with the current rules of ABS, or with the following specifications:
• Standard Specifications for Structural Steel: ASTM A131/A131M Rev A;
• Standard Specifications for Carbon and Alloy Steel Forgings for Thin-Walled
Pressure Vessels: ASTM A372/A372M;
• Standard Specifications for Steel Castings, Carbon, for General Application: ASTM
A27/A27M;
• Standard Specifications for Steel Castings, High Strength, for Structural Purposes:
ASTM A148/A148M
• Standard Specifications for Gray Iron Castings: ASTM A48/A48M.
SC-12 Electric Power and Compressed Air
The Contractor shall furnish all necessary electric power and compressed air for vessel use for the full duration of the Contract. The electric power and compressed air are intended to be used for lighting, heating, and for the operations of necessary deck and auxiliary machinery of the plant.
The Contractor is responsible for providing all labor, hoses, electrical cable, and any other equipment or material needed to make up the connections for the services identified above. The Contractor is also responsible for disconnecting the services at the completion of the Contract.
The Contractor shall be responsible for providing space heaters in the event of cold conditions at the shipyard. Adequate heat shall be provided to prevent pipes and machinery from freezing.
SC-13 Wharfage, Dockage, Garbage Disposal, Etc.
While the plant is in his/her possession, the Contractor shall be responsible for all costs associated with wharfage, dunnage, dockage, mooring lines, garbage disposal, security, etc.
The Contractor shall be responsible for all costs associated with sewage tank pump out and disposal. The Contractor, after making repairs shall move the boat to a convenient berth for the purpose of testing machinery and taking on supplies. Fresh water for the use of the plant shall be provided by the Contractor, at his/her expense, while the plant is in his/her possession. All fresh water tanks and boilers shall be properly filled and all sewage tanks shall be empty on completion of the work and return of the plant to the Government.
SC-14 Tests and Trials
All machinery or other equipment installed, repaired, or worked on by the Contractor shall be tested upon completion of all work to demonstrate proper installation and operation to the COR.
This shall include all removals for access and/or interference (See Contract Clause SW-1-h. for details).
Testing shall include the following at a minimum:
• All manufacture recommended tests on any newly installed machinery or equipment.
• All manufacture recommended tests on any existing machinery or equipment that was repaired, modified (including uninstalling and reinstalling in place), or worked on.
• All other testing as required by other sections of this contract.
• A technical representative from any sub contracted work shall be present during any trials/light offs as indicated in the Technical Provisions.
All tests shall be performed prior to or during sea trials. Any deficiencies found prior to sea trials shall be corrected and retested prior to sea trials. Any deficiencies found during sea trials shall be corrected and retested by the Contractor to the satisfaction of the COR prior to the acceptance of the vessel by the Government.
Rework on any such equipment to demonstrate proper installation and operation shall be performed at the expense of the Contractor.
All tests shall be completed to the satisfaction of the COR prior to acceptance of the vessel by the Government.
SC-15 Contractor Cooperation with the U.S. Coast Guard, the American Bureau of Shipping and the Contracting Officer’s Representative
The Contractor shall cooperate with the COR in the recertification and/or inspection of the vessel by the U.S. Coast Guard (USCG), ABS, the COR, and the onsite Government representative.
The COR and onsite Government representative shall be notified at least 24 hours prior to any USCG and ABS site visits. All costs associated with the Contractor's cooperation shall be the responsibility of the Contractor. The Contractor's cooperation during or in connection with such investigations may include, but not be limited to, the following:
a. Dye penetrant, water hose, air lance, and/or vacuum box testing of any welds performed under this Contract;
b. Flooding of areas of decks, small voids, small tanks and small spaces for testing of watertight integrity regardless of if the space was worked on under this Contract or not;
c. Hydrostatic pressure testing of all new piping and all piping that has been worked upon by the Contractor;
d. Manual movement of any unattached objects or any objects which can be easily dismounted or opened and moved anywhere on the vessel;
e. The Contractor shall provide the services of a marine surveyor to audio gauge various locations throughout the vessel in accordance with 7-3-2/5 ABS Steel Vessel Rules for Intermediate Hull Survey 16. The Contractor is responsible for all coordination to ensure that the marine surveyor and their equipment are acceptable to ABS and USCG prior to the start of any audiogauging work. Audioguaging required by the ABS Intermediate Survey or Coast Guard Dry Dock inspection shall be completed within 10 days of dry docking; and an audio gauge report shall be submitted within 5 days of completing the required audiogauging. As part of this work, the Contractor is also responsible for providing all labor and power tools for cleaning locations where audiogauging is required.
Note – Any additional suspect areas throughout the vessel that are noted by the attending Surveyor shall be audiogauged. For the purposes of quotes, the Contractor shall assume that five hundred (500) additional audiogauge “shots” are required for these suspect areas. The work under TP 1.15 “Additional Audioguaging Requirements” may or may not be directed by the Contracting Officer if additional shots are needed.
The Contractor is also responsible for having the marine surveyor provide a detailed report of the audiogauge readings. As part of this work, the Contractor is also responsible for providing all labor and equipment for removal of paint in way of a reading and repairing paint, including nonskid where applicable
a. Minor interruptions of work for purposes of inspection not to exceed eight (8) man-hours of such interruptions.
b. Scheduling of work to accommodate inspections of sea valves, sea chests, tanks, hull sections and spaces, machinery, and electrical items.
For the purpose of monitoring the quantity of man-hours used for item f. above, the Contractor shall maintain a log sheet to document the number of man-hours worked throughout the Contract completion. The Contractor shall request approval and signature of the Government Representative on site for each entry on the log sheet to verify the information.
For the purpose of monitoring quantity of audiogauge shots used for item e. above, the Contractor shall maintain a log sheet to document the number of shots worked throughout the contract completion. The contractor shall request approval and signature of the Government Representative on site for each entry on the log sheet to verify the information.
SC-16 Watch Service Requirements
The Contractor shall provide a 24 hour watch service to respond to any emergencies/alarms on the vessel while in the Contractor’s possession. The watchman will be given a key to the vessel for use at night, on weekends and on holidays. The Contractor shall provide the name and qualifications of the watchman in writing to the COR. This information shall be submitted no later than 10 days after the Contract award date and shall be a prerequisite to the start of any work on the vessel.
SC-17 Vessel Security
The Contractor is responsible for security while the vessel is in the Contractor’s possession.
Physical means of preventing unauthorized access (i.e. gated access) to the vessel shall be provided in accordance with Federal Acquisition Regulation (FAR) Clause 252.217-7016 - Plant Protection.
SC-18 Project Schedule
The Contractor shall submit to the Government a project schedule with their initial proposal.
Following award, the Contractor shall update the schedule and submit it to the Government on a weekly basis. The schedule shall identify the intended start and end date for work under each work item as well as percentage completed for each work item.
SC-19 Interport Cost Differential The Work Perfromacne Location shall be limited to the area within the Project Boundary labeled “Limit of Drift Removal Project” as shown on the project map “New York Harbor NY and NJ Colelction and Removal of Drift,” Dated 30 September 1986, plus extended locations outside of this Project Boundary, deemed safely navigable to reach by DCV Driftmaster:
No further than a 100 nautical mile voyage via navigable waters eastward from the East Project Boundary in Long Island Sound (Port Chester).
No further than a 70 nautical mile voyage via navigable waters northward from the North Project Boundary in the Hudson River (Tappan Zee).
An Interport Cost Differential shall be applied for voyage travel distance beyond the East Project Boundary in Long Island Sound (Port Chester) or beyond the North Project Boundary in the Hudson River (Tappan Zee) This different shall be calculated using the following formula.
Interport Cost Differential = (Round trip Voyage Travel Distance Beyond Boundary in Nautical Miles x $145) + $20,659.00
This Interport Cost Differential shall be applied to any proposals where the Work Performance Location is outside of the Project Boundary when determining final cost for comparison.
Technical Provisions
Hull Repairs - Definite Items
TP 1.01 Drydocking
Drydocking, as used below, is defined as the Contractor’s responsibility to furnish all labor, material, equipment, and services to remove the vessel from the water in order to perform the work required by these specifications. The Contractor shall use either a drydock or marine railway to remove the vessel from the water. Due to the age and condtion o f the vessel, use of a travel lift has been determined to not be technically feasible. All requirements below shall apply regardless of which method of removal is used.
The Contractor shall drydock the vessel in accordance with the requirements of SC-2.
a. The vessel shall be drydocked within five (5) calendar days after delivery of the vessel to
Contractor’s yard. See Paragraph SC-1 for additional details on vessel delivery. The vessel shall be drydocked for such time as may be necessary to complete the work required by this Contract. In particular, but not limited to the following, the vessel shall be drydocked for any exterior hull cleaning and painting below the waterline and for any interior or exterior hull plating, cutting, welding, plate replacement or structural repair or replacement within or upon the hull including hull anodes, rudders, shafts and propellers.
b. Irrespective of whether the vessel is in drydock, the Contractor is responsible for ensuring that there is a suitable drydock available for the plant for the entire contract duration in the event that an emergency drydocking of the plant should be necessary for any reason.
c. The COR may allow exceptions at his/her discretion to the necessity for drydocking for various items of work on a case-by-case basis only when informed by the Contractor and allowed to render a decision prior to any work being performed on the requested exception.
d. The vessel shall be drydocked in accordance with the drydocking plan prepared by the U.S.
Army Corps of Engineers Marine Design Center, Drawing Number 347-E170-01. See the attached file named “347-E170-01.pdf” which is included in the Contract package.
e. Drydocking blocks and other drydocking supports shall not obstruct access to remove, work upon, or replace: docking plugs, discharge openings, seachests, anodes, shafts, struts, sterntubes, propellers, rudders, keel coolers or any other hull fittings. The Contractor shall remove and relocate drydocking blocks and/or supports, or refloat and re-drydock the plant, as needed at no additional cost to the Government in order to assure complete coverage in cleaning and painting or for any other work as specified herein. Prior to doing so, the Contractor shall notify the COR of their plan to relocate the blocks to adequately support the vessel.
f. Any direction by the COR for work required under these specifications including the direction of indefinite technical provisions which extends drydocking time within the overall Contract duration shall not result in any additional cost to the Government.
g. Prior to undocking the vessel, the Contractor shall notify the COR and the master of the vessel. Notification shall be provided a minimum of twenty-four (24) hours prior to undocking.
h. When undocking the vessel, all interior spaces and systems affected by work performed under this Contract shall be inspected for leakage, watertight integrity and/or seaworthiness by the Contractor and witnessed by COR or designated Government Representatives onsite.
TP 1.02 Gas-Freeing Compartments
a. Within three (3) calendar days after drydocking the vessel, the Contractor shall furnish all labor, material, equipment, and services to gas-free all hull compartments and make each space safe for entry and hot work. The Contractor shall use forced air if needed to gas free the hull compartments.
b. The hull compartments to be gas-freed, tested, and certified are listed below (8 total):
• Forepeak (P/S)
• Compartment #1 (P/S)
• Compartment #2 (P/S)
• Main Fuel Tanks (P/S)
c. The Contractor shall provide a licensed marine chemist’s gas-free certificates for each space and shall then maintain the chemist’s gas-free conditions for entry and hot work throughout the vessel modifications, including all definite and indefinite work, until all work has been verified as complete by the COR, BS, and USCG.
d. If the gas-free conditions are violated at any point during the performance of this work, the Contractor shall bear the full expense of gas-freeing the space and providing an updated marine chemist’s gas-free certificate.
e. The Contractor shall strictly comply with the requirements of EM 385-1-1 “Safety and
Health Requirements Manual” as stated above in SC-6 “Accident Prevention” in regard to gas freeing all spaces requiring hot work.
NOTE – Costs associated with gas-freeing shall only be included under TP 1.02 and shall not be included under SC-6. See TP 1.14 for additional gas-freeing requirements, if directed.
TP 1.03 Docking Plugs
a. The Contractor shall remove the Eight (8) docking plugs near frame locations 3 (P/S), 14
(P/S), 24 (P/S), and 35 (P/S), according to the docking plan. The Contractor shall remove the port and starboard docking plugs at frame 24 to drain and degas the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .