This document is an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) services contract for Monitoring the Historic Area Remediation Site (HARS) offshore of New York and New Jersey. The amendment provides responses to contractor questions, extends the proposal due date from March 27, 2024 to April 3, 2024, and extends the deadline for submitting Requests for Information (RFIs) from March 20, 2024 to March 27, 2024. The amendment also provides a revised Price Schedule. The general scope of work includes collecting sediment and benthic samples, conducting oceanographic data collection, and performing environmental impact assessments and modeling. This is a Best Value Tradeoff solicitation under FAR Part 15, and offerors must specifically address the evaluation factors. Proposals must be submitted electronically by 2:00 PM EST on April 3, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: 1) provide resposes to contractor RFIs, 2) extend the proposal date from 2:00PM EST on 27 March 2024 to 2:00PM EST on 03 April 2024, 3) extend the RFI closing date from 11:59AM EST on 20 March 2024 to 11:59AM EST on 27 March 2024, and 4) provide a revised Price Schedule.
NOTE: Offerors must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Mar-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24R0008
X 9B. DATED (SEE ITEM 11)
26-Feb-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Mar-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS24R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFIS
RFI Disclaimer Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.
Question 4: Can you please confirm that we will distribute costs based on the hours/units included by the Corps in the "HARS Monitoring Services Prices Schedule" PDF, and that the totals from this "HARS Monitoring Services Prices Schedule" will be used to fill in the total price by year in Section B?
Response 4: Price is to be input based on the line item estimated relative annual units for each portion of the price schedule. Totals would be calculated based on the estimated relative annual price, and actual total contract value may be different from estimated usage.
Question 5: The "Additional Instructions" provided on Page 2 of the RFP refer to proposal schedules (3. Filled out proposal schedule and totals.); can you confirm that this is referring to the "HARS Monitoring Services Prices Schedule" PDF?
Response 5: Item 3 is referring to the HARS Monitoring Services Price Schedule PDF, however offerors are reminded to complete submission of all volumes required by solicitation for a complete proposal package.
Question 6: Can you please confirm that additional labor and/or equipment categories may be added after the contract award, if necessary to address specific work scope(s)?
Response 6: Additional labor and/or equipment categories may be added after the contract award if the government deems it necessary to address specific work scopes.
Question 7: Are chemical analytical laboratory services expected to be contracted under this IDIQ?
Response 7: Chemical analytical laboratory services are not expected to be contracted under this IDIQ.
Question 8: For line item 68 in the Price Schedule excel sheet, please specify which sediment, benthic, tissue analyses are requested.
Response 8: Per Amendment 002, line item 68 is limited to Benthic ID and count. See revised Price Schedule.
Question 9: Should Volume 1 be split into two documents: Factor 1 and 2?
Response 9: No, Volume 1 should consist of a single document containing Factor 1 and 2. Factor 1 will have a 25 page limit, and Factor 2 will have a 25 page limit, with exceptions noted in solicitation.
Question 10: Should we submit the subcontracting plan separate from the subcontractor participation plan?
Response 10: Yes. All offerors are required to submit the subcontractor participation plan. Large businesses are also required to submit a subcontracting plan. These are two separate items to be included in Volume II. The subcontracting plan is not included in the page count.
Question 11: Volume II, Factor III, #5: Can the Government confirm that any ISRs submitted will be excluded from page count?
Response 11: Yes, ISRs will be excluded from the page count.
W912DS24R0008
Question 12: While there is no indication in the RFP, but as standard practice, can you confirm that the subcontracting plan is excluded from the page count?
Response 12: Yes. The subcontracting plan is excluded from the page count.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Mar-2024 02:00 PM to 03-Apr-2024 02:00 PM.
The following have been modified:
BID SUBMISSION
The proposal shall be submitted electronically as a pdf document and will provide the Government address and receipt date for the submittal. Proposals must be signed, dated, and completed with prices for all contract line items (CLINs). Offerors are reminded to ensure that online Representations and Certifications in SAM are up to date or may provide completed Representations and Certifications with their proposal. The proposal shall not contain classified data. The use of hyperlinks is prohibited. File size is limited to 25MB per email. It is advised that proposals be submitted via e-mail at least 2 hours in advance to ensure it is submitted timely and uploaded. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipients.
The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals.
If a proposal received at the Government facility by electronic data interchange is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained, the Contracting Officer immediately shall notify the Offeror that the proposal will be rejected unless the Offeror provides clear and convincing evidence –
(1) Of the content of the proposal as originally submitted; and
(2) That the unreadable condition of the proposal was caused by Government software or hardware error, malfunction, or other Government mishandling.
The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
The Government reserves the right to make award solely on the electronic proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.
Submit proposals no later than 2:00 PM EST on 03 April 2024 via e-mail to: adrian.j.stafford-browne@usace.army.mil and matthew.e.lubiak@usace.army.mil.
ADDITIONAL INSTRUCTIONS
Potential Offerors are reminded that only the minimum documents are required for proposal submission:
1. Signed SF33.
2. Acknowledged amendments.
3. Filled out proposal schedule and totals.
4. Offerors must check off box (d) in 52.204-8 Annual Representations and Certifications for being on SAM.gov.
(End of Summary of Changes)