This document is an Amendment to a Solicitation for a federal contract opportunity. The key details are:

The amendment revises the drawings and specifications for the Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 4 Project solicitation (Solicitation #W912DS24B0021). The revisions include modifications to three specification sections related to water quality certification, clarification of color approval requirements, and updates to debris removal and barge operations. No drawings have been revised or added. The amendment also addresses several bidder inquiries, including clarifying the environmental work window, confirming the anticipated award and notice to proceed timeline, and rejecting a request to shorten the option item award period. The solicitation is issued by the U.S. Army Corps of Engineers, New York District.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page for the purpose of this amendment.

Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24B0021

X 9B. DATED (SEE ITEM 11)

02-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24B0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

AMENDMENT 05

W912DS-24-B-0021

Amendment No. 5

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been ADDED are provided in their entirety herein:

- None

2. The following DRAWINGS have been DELETED in their entirety:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- None

3. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:

- Sections 00 31 24.01 18, 01 50 00 and 31 24 00.00 18

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

REVISED PLANS & SPECIFICATIONS:

1- Specifications –

a. Section 00 31 24.01 18 – modification to WQC.

b. Section 01 50 00 – language revised to clarify that colors will be approved by the

Contracting Officer in coordination with local authorities.

c. Section 31 24 00.0 18 – language revised to clarify debris removal and barge operations.

2- Plans - NONE

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the preceding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the questions(s). All questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans, or specifications. This applies to prior questions and replies as well.

Please note that the Government may, but is not obligated to, respond to RFIs sent by contractors after 10 September 2024, 11:59pm EST. RFIs are to be submitted to point(s) of contact listed on the solicitation.

Bidder Inquiry 01: Please clarify the response to Amendment Number 4, Bidder Inquiry #4. Should the response read: “before November 30 (sturgeon) and AFTER January 1…”?

Government Response: Correct. Prior to modification, window reflected work ceasing January 1st. In accordance with the Uniform Procedures Regulations (6NYCRR Part 621), the dredging and in-water work in Moriches Bay needed to complete the Cupsogue CPF are authorized on a one-time-only basis to February 1, 2025 inclusive.

Bidder Inquiry 02: Will the Government please request a WQC modification to allow in‐ water work in Moriches Bay until 3/31/25, matching the requirements for the offshore portion of work?

Government Response: 1 February 2025 shall be the latest date for in-water work within Moriches Bay. Demobilization can occur through 14 March 2025. No additional requests will be made. It is notable that the Government believes this project to be feasible to complete the work within the windows provided.

Bidder Inquiry 03: In regard to Option Item 0005, please reduce the time to award from 60 days from NTP to 30 days from NTP. This will allow the contractor to begin work as early as possible to ensure completion of Item 0005 before environmental deadlines.

Government Response: This change will not be made. 60 days was determined with consideration to environmental timelines. If the optional item is to be exercised, it will be exercised at the earliest opportunity available to the Government.

Bidder Inquiry 04: The contract allows 180 days from NTP to complete, which is the minimum time needed for completion of a project of this magnitude. That equates to an NTP of October 1, which is highly unlikely. When does the government anticipate the Award and NTP? Will the environmental window be shifted accordingly?

Government Response: Award and NTP are anticipated on/around the beginning of October. No additional requests will be made regarding environmental windows.

(End of Summary of Changes)