This document appears to be a solicitation for the Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 4 Project, Solicitation Number W912DS24B0021. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District New York.
The solicitation provides detailed technical specifications and requirements for the FIMP CT4 project. Key details include the required products and services, such as dune and beach restoration, coastal structure construction, and environmental mitigation. The solicitation also specifies the response due date, contract award date, pricing structure, and any applicable set-asides. While the document contains legal language and contract clauses, the summary focuses on the high-level project requirements and salient information for prospective offerors.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FIRE ISLAND INLET TO MONTAUK
POINT
COASTAL STORM RISK MANAGEMENT
CONTRACT 4 - CUPSOGUE AND
WESTHAMPTON
SUFFOLK COUNTY, LONG ISLAND, NY
IFB No. W912DS-24-X-00XX
RTA
July 2024
U.S. Army Corps of Engineers New York District
THIS PAGE INTENTIONALLY LEFT BLANK
FI RE I SLAND I NLET TO MONTAUK POI NT FI MPCT4
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 00. 02 18 07/ 17 REPORT OF OPERATI ONS FORM ( Eng For m
27A) - HOPPER DREDGES
00 31 19. 01 18 03/ 18 TRANS- ATLANTI C SUBMARI NE CABLES
00 31 24. 01 18 07/ 17 WATER QUALI TY CERTI FI CATE
00 31 32. 01 18 06/ 17 WENTWORTH SCALE
00 31 32. 03 18 11/ 17 COMPOSI TE GRAI N SI ZE DI STRI BUTI ON
CURVES AND GRAI N SI ZE SCALES FOR SAND
SEDI MENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 11 35 AI R EMI SSI ONS REQUI REMENTS
01 14 00 11/ 22, CHG 1: 02/ 23 WORK RESTRI CTI ONS
01 20 00 11/ 20, CHG 3: 02/ 23 PRI CE AND PAYMENT PROCEDURES
01 30 00 11/ 20, CHG 3: 08/ 23 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 08/ 23 PROJECT SCHEDULE
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 35 26 05/ 24 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00 08/ 23 QUALI TY CONTROL
01 45 00. 15 10 11/ 23 RESI DENT MANAGEMENT SYSTEM CONTRACTOR
MODE ( RMS CM)
01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 56 10. 00 18 ENDANGERED SPECI ES OBSERVERS ( HOPPER
DREDGES ONLY)
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON
01 74 19 02/ 19 DREDGI NG WASTE MANAGEMENT AND DI SPOSAL
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
DI VI SI ON 31 - EARTHWORK
31 24 00. 00 18 BEACH FI LL PLACEMENT
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 10. 00 18 SAND FENCE
32 94 00 DUNE VEGETATI ON PLAN
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 08/ 20 DREDGI NG
35 20 23. 23 02/ 22 NATI ONAL DREDGI NG QUALI TY MANAGEMENT
PROGRAM - HOPPER DREDGE
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
SECTI ON 00 31 00. 02 18
REPORT OF OPERATI ONS FORM ( Eng For m 27A) - HOPPER DREDGES 07/ 17
PART 1 GENERAL
1. 1 DESCRI PTI ON
Eng For m 27A, Dai l y Repor t of Oper at i ons - Hopper Dr edges
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
DOCUMENT 00 31 00. 02 18 Page 1
LEFT BLANK I NTENTI ONALLY
DOCUMENT 00 31 00. 02 18 Page 2 b.
AGITATING
ENG FORM 27A, APR 1973 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3
1. DISTRICT
DAILY REPORT OF OPERATIONS - HOPPER DREDGES
For use of this form, see ER 37-2-10; the proponent agency is CECW-OD.
a. MAINTENANCE
REPORTS CONTROL SYMBOL
ENGCW-0-13
2. DREDGE
3. EXACT LOCATION OF WORK 5. DATE (YYYYMMDD)
6. NUMBER OF PERSONS IN CREW
b. NEW WORK
7. AV. LENGTH OF CUT 10. CHARACTER OF MATERIAL
8. AV. WIDTH OF CUT
9. AV. DIST. TO DUMP
a. DENSITY OF MAT. IN PLACE
°F
11. HOPPER CAPACITY
12. AV. VOL. OF BIN WATER
13. AV. UNFILLED CAPACITYFT.
FT.
FT.
GMS/LITER
b. DENSITY OF WATER GMS/LITER AT
CU YDS.
CU YDS.
CU YDS.
14. NAVIGATION AND OTHER DREDGING AIDS (Describe and include statement on adequacy and recommendations)
15. WORK PERFORMED
a.
DREDGING AND HAULING
(1)
NO. OF LOADS
(2)
TOT. CU. YDS.
(3)
DISPOSAL AREA
(1)
TOT. CU. YDS.
16. DRAFT FOR LOAD NO. (for one load only)
(1)
LIGHT
(2)
LOADED
a. FORWARD
b. AFT
18. DRAG DEPTH MAX. MIN.
19. INDICATORS LAST CHECKED ON
DATE (YYYYMMDD)
20. GAS EJECTORS USED % OF PUMPING TIME
21. DISTRIBUTION OF TIME AND MILES RUN
(a) AGITATING (Minutes)
(b) DREDGING AND HAULING (Minutes)
(c) MILES RUN (Stat. Miles)
a. EFFECTIVE WORKING TIME
(1) PUMPING
(2) TURNING
(3) TO DUMP
(4) DUMPING
(5) TO CUT
(7) TOTALS
b. NON-EFFECTIVE WORKING TIME
(1) TAKING ON FUEL AND SUPPLIES
(2) TO AND FROM WHARF OR ANCHORAGE
(3) LOSS DUE TO NATURAL ELEMENTS
(4) LOSS DUE TO TRAFFIC AND BRIDGES
(5) MINOR OPERATING REPAIRS
(6) TRANSFERRING BETWEEN WORKS
(7) LAY TIME
(8) FIRE AND BOAT DRILLS
(9) MISCELLANEOUS
(10) TOTALS
4. WORK TYPE
17.
AREA
ENG FORM 27A, APR 1973 Page 2 of 3
c. SIGNATUREb. DATE (YYYYMMDD)
21. DISTRIBUTION OF TIME AND MILES RUN (Continuation)
(a) AGITATING (Minutes)
(b) DREDGING AND HAULING (Minutes)
(c) MILES RUN (Stat. Miles)
c. LOST TIME
(1) MAJOR REPAIRS AND ALTERATIONS
(2) CESSATION
(3) COLLISIONS
(4) TOTAL LOST TIME
(d) TOTAL TIME IN PERIOD
22. AVERAGE SPEED OF DREDGE 23. MINUTES RADAR IN USE
a. LOADING b. FEET / MINUTE 24. TIDE DATA WAS OBTAINED BY MEANS OF
c. AGITATING 25. WEATHER
d. GALS. OF FUEL OIL CONSUMED
e. GALS. OF WATER CONSUMED
26. NUMBER OF INSPECTIONS BY SUPERVISORY PERSONNEL
a. FIELD b. OFFICE
27. REMARKS
28a. SUBMITTED BY NAME (Last, First MI) AND TITLE
MATE AND
DRAGTENDERS
ENG FORM 27A, APR 1973 Page 3 of 3
32. REMARKS
29.
BREAKDOWN OF LOADS DREDGED AND HAULED
30. DATE (YYYYMMDD)
b.
TIME PUMP
(0001-2400) c.
MINUTES
d.
CUBIC YARDS RETAINED
(In terms of in place material)
a. PUMPING TIME (Minutes) b. ECONOMIC LOAD (Cubic Yards) c. TEST LOAD NUMBER. d. DATE OF TEST (YYYYMMDD)
31. ECONOMIC LOAD DATA
f. AVERAGE e.
MID-DEPTH SAMPLES
NOTE:
*WHEN LOAD IS DREDGED WITH HOPPERS UNWATERED, INDICATE BY LETTER "U".
**TOTAL CUBIC YARDS RETAINED = SETTLED SOLIDS + SUSPENDED SOLIDS - BIN WATER SOLIDS OR DETERMINED DIRECTLY BY
YARDAGE METER.
***NOT NECESSARY WHEN MEASURING LOAD BY YARDAGE METER.
a.
(1) (2) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3)
SECTI ON 00 31 19. 01 18
TRANS- ATLANTI C SUBMARI NE CABLES
03/ 18
PART 1 GENERAL
1. 1 DESCRI PTI ON
Tr ans- At l ant i c Submar i ne Cabl es map
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
DOCUMENT 00 31 19. 01 18 Page 1
DOCUMENT 00 31 19. 01 18 Page 2
Chart ID: 12300C_1 Edition: 48 Revision: 30 Cleared Date: 03/26/2011 Date Printed: 05/21/2012 NOT FOR NAVIGATION Page: A0
Marine Liaison 973 216-2096 Phone Number 732 282-4001
NOT FOR NAVIGATION / NOT FOR SALE
tr001702 Rectangle tr001702 Rectangle
July 5, 2024
Peter Weppler, Chief Environmental Analysis Branch U.S. Army Corps of Engineers – Planning 26 Federal Plaza – Room 2151 New York NY 10278 0090
Re: DEC Permit #: 1-4799-00149/00001 Water Quality Certification (WQC)
FIMP – Contract 4:
Cupsogue Beach to Westhampton Beach
Dear Mr. Weppler:
In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 621) we are enclosing the Water Quality Certification for the above project.
Please carefully read all permit conditions and special permit conditions contained in the permit to ensure compliance during the term of the permit. If you are unable to comply with any conditions, please contact us at the above address. This permit must be kept available on the premises of the facility at all times
Also enclosed please find a permit sign which is to be conspicuously posted at the project site and protected from the weather.
Sincerely, Kevin Kispert file Permit Administrator Enclosures cc via e-mail: NYSDEC Review Team
NYSOPRHP
NYSDOS-Coastal Review Suffolk County Parks
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4799-00149
PERMIT
Under the Environmental Conservation Law (ECL)
Permittee and Facility Information
Permit Issued To: Facility:
US DEPT OF THE ARMY FIMP CONTRACT 4
THE PENTAGON CUPSOGUE BEACH TO WESTHAMPTON
BEACH
WASHINGTON, DC 20310 WESTHAMPTON, NY
Facility Application Contact:
PETER WEPPLER
Usacoe Planning C/O Psc Mail Center 26 Federal Plz Rm 17-420
NEW YORK, NY 10278-0090
(917) 790-8634
Facility Location: In MULTIPLE TOWNS in SUFFOLK COUNTY Facility Principal Reference Point: NYTM-E: 696.972 NYTM-N: 4517.848
Latitude: 40°47'16.9" Longitude: 72°39'55.8" Authorized Activity: Conduct a dredging and beach nourishment project coupled with a Coastal Protective Feature (CPF) under Contract 4 of the Fire Island to Montauk Point (FIMP) Hurricane and Storm Damage Reduction project, by hydraulically dredging offshore borrow area 5b, and using 821,000 cubic yards of resultant material to provide beach and dune fill on the Atlantic shorefront Westhampton reach, and using 380,000 cy of resultant material to establish the Cupsogue Bayside Coastal Protective Feature (CPF). The constructed berm width for Cupsogue County Park, Pikes Beach and Westhampton is 150 ft with an elevation of 8.5 ft NAVD88. The proposed design dune for Cupsogue County Park, Pikes, and Westhampton has a crest width of 25 ft with 1v:5h slopes and a crest elevation of 14 ft NAVD88. The CPF is designed to help reestablish cross-island sediment transport and flood plain function.
All work must be done as shown on the attached 12-sheet set of drawings (100 %) prepared by USACE NewYork District, issue date June 14, 2024, all stamped "NYSDEC Approved" on 7/5/2024.
Permit Authorizations
Water Quality Certification - Under Section 401 - Clean Water Act Permit ID 1-4799-00149/00001 New Permit Effective Date: 7/5/2024 Expiration Date: 7/4/2034
NYSDEC Approval
By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, and all conditions included as part of this permit.
Permit Administrator: KEVIN A KISPERT, Deputy Regional Permit Administrator Address: NYSDEC Region 1 Headquarters
SUNY @ Stony Brook|50 Circle Rd Stony Brook, NY 11790 -3409
Authorized Signature: ______________________________________ Date 7/5/2024
Distribution List
PETER WEPPLER
Marine Habitat Protection Marine Resources Flood Control and Coastal Erosion Wildlife
Permit Components
NATURAL RESOURCE PERMIT CONDITIONS
WATER QUALITY CERTIFICATION SPECIFIC CONDITION
GENERAL CONDITIONS, APPLY TO ALL AUTHORIZED PERMITS
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
Permit Attachments
Site Plan 6/14/2024
NATURAL RESOURCE PERMIT CONDITIONS - Apply to the Following Permits: WATER QUALITY CERTIFICATION
1. Notice of Commencement At least 48 hours prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work.
2. Post Permit Sign The permit sign enclosed with this permit shall be posted in a conspicuous location on the worksite and adequately protected from the weather.
3. Required Drawing Submissions The permittee shall submit the following drawings or sets of drawings, in quadruplicate, to the Department for review and approval within the specified time frame below prior to work starting on the subject aspect of the project:
Project limits (i.e. station numbers or revised plan), plan view and cross-section drawing sets for the successive phases of the project must be provided for DEC review at least 30 days prior to construction start on each phase.
4. Prohibition Period to Protect Listed Species of Beach Nesting Shorebirds In order to protect state and federally listed species of beach nesting shorebirds such as the piping plover and least tern, activities authorized by this permit are prohibited between the dates April 1 and August 31 of each year.
5. Dredging Prohibition Period to protect Atlantic Sturgeon Dredging is specifically prohibited between May 1 to June 30 inclusive, and September 1 to November 30 inclusive, of each calendar year to protect Atlantic sturgeon.
6. Dredging Prohibition Period to Protect Spawning Shellfish and Finfish/Winter Flounder To protect spawning shellfish and finfish including winter flounder, dredging and in-water work in Moriches Bay is specifically prohibited between January 1 to September 30 inclusive of each calendar year.
7. Borrow Area Monitoring Requirement Within 90 days of the issuance of the Water Quality Certification, the permittee must develop and receive Department approval (MarineHabitat@dec.ny.gov) for a schedule of data collection tasks for each borrow area authorized herein consistent with the August 2014 "Borrow Area Monitoring Plan for NYSDEC WQC Requirements for New York State Coastal Restoration Projects Implemented Under Public Law 113-2, the Disaster Relief Appropriations Act."
The permittee shall submit an annual data report to the Department for review and approval to
MarineHabitat@dec.ny.gov.
Coastals@dec.ny.gov
8. Dredge Plant Monitor Requirements The permittee shall employ appropriate monitoring and protection procedures for Atlantic Sturgeon, marine turtles and marine mammals on any and all dredges used to conduct the work authorized in this Water Quality Certification. These procedures are set forth in the attached 100% Project Specifications: Section 01 56 10.00 18. (Attached).
These Project Specifications address the following:
Monitoring Specifications for Hopper Dredges.
Sea Turtle Handling & Resuscitation.
Incident Report of Sea Turtle Take.
Incident Report of Atlantic Sturgeon Take.
Endangered Species Observer Program - Large Whale Observation Data
Copies of all dredge observer forms, incident report forms, and detailed season summary reports shall be submitted to the Department at MarineHabitat@dec.ny.gov
9. No Side-casting or Temporary Storage Excavated sediments shall be placed directly into the approved disposal site/dewatering site or conveyance vehicle. No side-casting (double-dipping) or temporary storage of excavated sediments is authorized.
10. Leave a Uniform Bottom Elevation All dredging shall be conducted so as to leave a uniform bottom elevation free of mounds or holes.
11. Grade Borrow Area Side Slopes All side slopes of the borrow areas shall not exceed 1 vertical to 5 horizontal (1v : 5h).
12. Dredged Depth Survey Within 60 days of completion of the dredging operation at each borrow area, an as-dredged depth survey of the dredged area shall be submitted to the three addresses below:
Regional Habitat - TW NYSDEC Region 1 Headquarters SUNY @ Stony Brook - 50 Circle Rd.
Stony Brook, NY 11790-3409 Attn: Compliance
MarineHabitat@dec.ny.gov
Coastals@dec.ny.gov
13. Annual Report The permittee must submit an annual report indicating the site, date, dredge volume, and characterization of dredged material (sand, gravel, etc.) by April 1 of the calendar year following each dredge event. The report must be submitted to the three addresses below:
Marine Habitat Protection NYDEC Region 1 Headquarters SUNY @ Stony Brook, 50 Circle Rd.
Stony Brook, NY 11790-3409 Attn: Compliance
MarineHabitat@dec.ny.gov
Coastals@dec.ny.gov
14. Remove Visible Quarry Stone Near Groin 15 Prior to sand placement activities if there is visible quarry stone on the beach in the area near Groin 15, that stone must be removed from the beach and disposed of properly.
15. Properly Locate & Position Dredged Material Discharge Pipe The dredged material discharge pipe shall be located and positioned to prevent the scouring or damage of existing dunes and to prevent the direct placement of material seaward of the line of apparent high water. A diffuser shall be attached to the end of the discharge pipe.
16. Grade Completed Beach Smooth Upon completion of the project, the permittee shall grade the beach berm nourishment area as necessary to ensure that the finished seaward slope conforms with the final slope depicted on the approved plans, and to remove wheel ruts, tire tracks, or any mounds, ridges or holes in excess of six (6) inches above or below the finished beach surface. The grade of the finished beach must be suitable to support the nesting of piping plovers and least terns.
17. Manage Suitable Piping Plover Habitat To avoid adverse effects to Piping Plovers from recreational impacts associated with the nourished beach and the new Coastal Protective Feature (CPF), any suitable piping plover habitat created by work performed under this permit shall be managed in accordance with the USFWS Guidelines for Managing Recreational Activities in Piping Plover Breeding Habitat on the U.S. Atlantic Coast to Avoid Take under Section 9 of the Endangered Species Act.
18. Use Only Clean, Beach Compatible Sand All material used to reconstruct or repair dunes and rebuild the beach must be clean, beach compatible (grain size equal to or slightly larger than the existing beach material) sand suitable to provide nesting substrate for the piping plover and least tern.
19. Restore Any Areas Disturbed By Construction Any areas of beach, dune or wetland disturbed by the activities authorized herein, such as the installation, relocation and removal of pipes or booster pumps, temporary sand stockpiles or the operation of staging and access areas must be restored to pre-project conditions upon completion of work.
20. No Construction Debris in Wetland or Adjacent Area Any debris or excess material from construction of this project shall be completely removed from the adjacent area (upland) and removed to an approved upland area for disposal. No debris is permitted in wetlands and/or protected buffer areas.
Facility DEC ID 1-4799-00149
21. Storage Tanks Fuel or other chemical storage tanks shall be contained and located at all times in an area greater than 100 feet landward of the regulated wetland or water body. If the above requirement cannot be met by the permittee, then the storage areas must be designed to completely contain any and all potential leakage. Such a containment system must be approved by Department staff prior to equipment, machinery or tank storage within 100 feet of the wetland or water body.
22. Storage of Equipment, Materials The storage of construction equipment and materials shall be confined within the project work area and/or upland areas greater than 100 linear feet from the tidal wetland boundary.
23. Conformance With Plans All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or applicant's agent as part of the permit application.
Such approved plans were prepared by USACE NY District, 100 % Submission, dated 6/14/2024, stamped "NYSDEC Approved 7/5/2024.
24. Precautions Against Contamination of Waters All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project.
WATER QUALITY CERTIFICATION SPECIFIC CONDITIONS
1. Water Quality Certification The authorized project, as conditioned pursuant to the Certificate, complies with Section 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act, as amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory requirements set forth in 6 NYCRR Section 608.9(a). The authorized project, as conditioned, will also comply with applicable New York State water quality standards, including but not limited to effluent limitations, best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCRR Parts 701, 702, 703, and 704.
2. Water Quality Certification The authorized project, as conditioned pursuant to the Certificate, complies with Section 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act, as amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory requirements set forth in 6 NYCRR Section 608.9(a). The authorized project, as conditioned, will also comply with applicable New York State water quality standards, including but not limited to effluent limitations, best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCRR Parts 701, 702, 703, and 704.
3. Water Quality Certification The authorized project, as conditioned pursuant to the Certificate, complies with Section 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act, as amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory requirements set forth in 6 NYCRR Section 608.9(a). The authorized project, as conditioned, will also comply with applicable New York State water quality standards, including but not limited to effluent limitations, best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCRR Parts 701, 702, 703, and 704.
4. Water Quality Certification The authorized project, as conditioned pursuant to the Certificate, complies with Section 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act, as amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory requirements set forth in 6 NYCRR Section 608.9(a). The authorized project, as conditioned, will also comply with applicable New York State water quality standards, including but not limited to effluent limitations, best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCRR Parts 701, 702, 703, and 704.
GENERAL CONDITIONS - Apply to ALL Authorized Permits:
1. Facility Inspection by The Department The permitted site or facility, including relevant records, is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation (the Department) to determine whether the permittee is complying with this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71- 0301 and SAPA 401(3).
The permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by the Department.
A copy of this permit, including all referenced maps, drawings and special conditions, must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit.
2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order or determination.
3. Applications For Permit Renewals, Modifications or Transfers The permittee must submit a separate written application to the Department for permit renewal, modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires.
Any renewal, modification or transfer granted by the Department must be in writing. Submission of applications for permit renewal, modification or transfer are to be submitted to:
Regional Permit Administrator NYSDEC Region 1 Headquarters SUNY @ Stony Brook|50 Circle Rd Stony Brook, NY11790 -3409
4. Submission of Renewal Application The permittee must submit a renewal application at least 30 days before permit expiration for the following permit authorizations: Water Quality Certification.
5. Permit Modifications, Suspensions and Revocations by the Department The Department reserves the right to exercise all available authority to modify, suspend or revoke this permit. The grounds for modification, suspension or revocation include:
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4799-00149
a. materially false or inaccurate statements in the permit application or supporting papers;
b. failure by the permittee to comply with any terms or conditions of the permit;
c. exceeding the scope of the project as described in the permit application;
d. newly discovered material information or a material change in environmental conditions, relevant technology or applicable law or regulations since the issuance of the existing permit;
e. noncompliance with previously issued permit conditions, orders of the commissioner, any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity.
6. Permit Transfer Permits are transferrable unless specifically prohibited by statute, regulation or another permit condition. Applications for permit transfer should be submitted prior to actual transfer of ownership.
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee, excepting state or federal agencies, expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York, its representatives, employees, and agents ("DEC") for all claims, suits, actions, and damages, to the extent attributable to the permittee's acts or omissions in connection with the permittee’s undertaking of activities in connection with, or operation and maintenance of, the facility or facilities authorized by the permit whether in compliance or not in compliance with the terms and conditions of the permit. This indemnification does not extend to any claims, suits, actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under Article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws.
Item B: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors, employees, agents and assigns of their responsibility to comply with this permit, including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee.
Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way that may be required to carry out the activities that are authorized by this permit.
Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit.
SECTI ON 00 31 32. 01 18
WENTWORTH SCALE
06/ 17
PART 1 GENERAL
1. 1 DESCRI PTI ON
Went wor t h scal e
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
DOCUMENT 00 31 32. 01 18 Page 1
DOCUMENT 00 31 32. 01 18 Page 2
00 90 02-1
COMPOSITE GRAIN SIZE DISTRIBUTION CURVES FOR SAND SEDIMENTS AND
GRAIN SIZE SCALES FOR SEDIMENT
The grade scale most commonly used for sediments is the Wentworth (1922) scale which is a logarithmic scale in that each grade limit is twice as large as the next smaller grade limit. The scale starting at 1mm and changing by a fixed ratio of 2 was introduced by J.A. Udden (1898), who also named the sand grades we use today.
However, Udden drew the gravel/sand border at 1 mm and used different terms in the gravel and mud division. For more detailed work, sieves have been constructed at intervals 2 ^(1/2) and 2^(1/14). The Φ (phi) scale, devised by Krumbein, is a much more convenient way of presenting data than if the values are expressed in millimeters, and is used almost entirely in recent work.
WENTWORTH SCALE
FIRE ISLAND INLET TO MONTAUK POINT FIMPCT4
SECTION 00 31 32.03 18
COMPOSITE GRAIN SIZE DISTRIBUTION CURVES AND
GRAIN SIZE SCALES FOR SAND SEDIMENTS
11/17
PART 1 GENERAL
1.1 DESCRIPTION
Composite grain size distribution curves and Grain size scales for sand sediments documentation will be provided when available
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
DOCUMENT 00 31 32.03 18 Page 1
DOCUMENT 00 31 32. 03 18 Page 2
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 FAR 52. 211- 10, COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
a. The Cont r act or must be r equi r ed t o ( i ) commence wor k under t hi s cont r act wi t hi n t en ( 10) cal endar days af t er t he dat e t he Cont r act or r ecei ves t he Not i ce t o Pr oceed ( NTP) , ( i i ) pr osecut e t he wor k di l i gent l y, and ( i i i ) compl et e t he ent i r e wor k r eady f or use not l at er t han 180 cal endar days af t er t he dat e t he Cont r act or r ecei ves t he not i ce t o pr oceed. The dat e st at ed f or compl et i on must i ncl ude f i nal c l eanup of t he pr emi ses. ( FAR 52. 212- 3)
b. Al l wor k must be i n accor dance wi t h t he dr awi ngs and speci f i cat i ons or i nst r uct i ons at t ached her et o and made a par t t her eof , or t o be f ur ni shed her eaf t er by t he Cont r act i ng Of f i cer and subj ect , i n ever y det ai l , t o hi s super vi s i on, di r ect i on, and i nst r uct i ons.
c. Repl ace t he wor d " shal l " wi t h " must " i n t hi s Cont r act Speci f i cat i ons.
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes dr edgi ng and beach f i l l pl acement , sand f enci ng and dune veget at i on pl ant i ng.
1. 2. 2 Locat i on
The wor k i s l ocat ed bet ween Mor i ches I nl et t o Shi nnecock I nl et , speci f i cal l y f r om Cupsogue Beach Count y Par k t o West hampt on, Suf f ol k Count y, NY.
1. 3 DFARS 236. 204, DI SCLOSURE OF THE MAGNI TUDE OF CONSTRUCTI ON PROJECTS
Thi s pr oj ect i s est i mat ed bet ween $25, 000, 000. 00 and $100, 000, 000. 00
1. 4 AUTHORI ZED CONSTRUCTI ON AREA AND TRESPASSI NG
Do not i nf l i c t damage upon l and and pr oper t i es out si de t he aut hor i zed const r uct i on ar ea by unwar r ant ed ent r y upon, passage t hr ough, damage t o, or di sposal of , mat er i al on such l and or pr oper t y. The Cont r act or may make a separ at e agr eement wi t h any ot her par t y, r egar di ng t he use of , or r i ght t o, l and or f aci l i t i es out si de t he cont r act ar ea. I f such an agr eement i s made, i t must be i n wr i t i ng and a copy must be pr ovi ded t o t he Cont r act i ng Of f i cer . The Cont r act or must hol d and save t he Gover nment , i t s of f i cer s, and agent s f r ee f r om l i abi l i t y ar i s i ng f r om t r espassi ng or damage occasi oned by hi s oper at i ons.
1. 5 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
SECTI ON 01 11 00 Page 1
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
c. The Cont r act or must be r esponsi bl e f or t he r epai r , r est or at i on, or f or al l cost of damage r esul t i ng t her ef r om. I f t he Cont r act or el ect s t o have al t er at i ons made t o any exi st i ng st r uct ur e, ut i l i t y , dune, r oad, or ot her i mpr ovement s, cont r act or must make ar r angement s wi t h t he owner of t he f aci l i t y f or such al t er at i on and t he ar r angement s must be appr oved by t he Cont r act i ng Of f i cer pr i or t o maki ng al t er at i ons.
Repai r and r est or at i on must compl y wi t h cont r act r equi r ement s and must al so be appr oved by t he Cont r act i ng Of f i cer
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
SECTI ON 01 11 00 Page 2
SECTI ON 01 11 35
AI R EMI SSI ONS REQUI REMENTS
PART 1 GENERAL
1. 1 BACKGROUND
The Cont r act or must compl y wi t h t he ai r emi ssi ons r equi r ement s of t hi s sect i on whi ch ar e i nt ended t o ensur e compl i ance wi t h t he Feder al Cl ean Ai r Act .
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng must be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 06 Test Repor t s
Pr oj ect Ai r Emi ssi ons Cal cul at or ; G, RO
Mont hl y Ai r Emi ssi ons Cal cul at or ; G, RO
Nar r at i ve; G, RO
SD- 07 Cer t i f i cat es
Cer t i f i cat i on; G, RO
1. 3 PRE- OPERATI ONAL PLANNI NG AND REPORTI NG
The Cont r act or must r et ai n an i ndependent f i r m havi ng a mi ni mum of 3 year s of exper i ence i n cal cul at i ng ai r emi ssi ons f or equi pment i n t he ut i l i t y , pr ocess, const r uct i on or manuf act ur i ng i ndust r i es t o assi st t he Cont r act or i n f ul f i l l i ng t he r equi r ement s of t hi s sect i on.
The Cont r act or must submi t t he Pr oj ect Ai r Emi ssi ons Cal cul at or i nf or mat i on wi t hi n 30 cal endar days af t er not i ce t o pr oceed.
The Pr oj ect Ai r Emi ssi ons Cal cul at or wi l l be pr ovi ded el ect r oni cal l y t o t he Cont r act or by t he Gover nment on or shor t l y af t er not i ce of cont r act awar d. The Cont r act or must compl et e t he cal cul at or by ent er i ng i nf or mat i on on al l di esel - power ed equi pment ant i c i pat ed t o be used i n per f or mance of t he cont r act and t he ant i c i pat ed number of hour s of oper at i on of each pi ece of equi pment i n each cal endar year t hat wor k i s expect ed t o t ake pl ace. The cal cul at or submi t t al must be made i n t he same f or mat as t he or i gi nal Pr oj ect Ai r Emi ssi ons Cal cul at or pr ovi ded by t he Gover nment .
1. 4 OPERATI ONAL MONI TORI NG, RECORDKEEPI NG AND REPORTI NG
Pr ovi de mont hl y i nf or mat i on l i s t ed bel ow dur i ng t he execut i on of t he cont r act :
SECTI ON 01 11 35 Page 1
1. 4. 1 Mont hl y Ai r Emi ssi ons Cal cul at or and Nar r at i ve
The Mont hl y Ai r Emi ssi ons Cal cul at or wi l l be pr ovi ded t o t he Cont r act or by t he Gover nment at t he st ar t of wor k and at t he begi nni ng of each cal endar year i n whi ch wor k t ake pl ace.
The Mont hl y Ai r Emi ssi ons Cal cul at or and Nar r at i ve must be updat ed mont hl y and submi t t ed el ect r oni cal l y t o t he COR. Updat ed cal cul at or , nar r at i ve and ot her i nf or mat i on associ at ed wi t h t hi s t ask ar e due 10 cal endar days af t er t he end of each mont h. The updat ed mont hl y cal cul at or submi t t al must be made i n t he same f or mat as t he or i gi nal Ai r Emi ssi ons Cal cul at or pr ovi ded by t he Gover nment .
The Mont hl y Ai r Emi ssi ons Cal cul at or must be updat ed mont hl y t o r ef l ect act ual hour s wor ked, equi pment act ual l y used, act ual emi ssi on cont r ol met hods used dur i ng t he pr evi ous mont h, and a pr oj ect i on of r emai ni ng wor k on t he cont r act dur i ng t he cal endar year ; and
A Nar r at i ve expl ai ni ng t he changes f r om t he Pr oj ect Ai r Emi ssi ons Cal cul at or t o t he updat ed Mont hl y Ai r Emi ssi ons Cal cul at or must be submi t t ed wi t hi n 30 cal endar days af t er t he not i ce t o pr oceed.
1. 4. 2 Cer t i f i cat i on
Pr ovi de a Cer t i f i cat i on f r om an i ndependent Ai r Emi ssi ons Consul t ant st at i ng t hat t he i nf or mat i on pr ovi ded i n t he MONTHLY AI R EMI SSI ONS CALCULATOR AND NARRATI VE par agr aph i s accur at e and t hat any t echnol ogi es, t echni ques, or met hods used t o r educe emi ssi ons ar e appr oved by t he U. S.
Envi r onment al Pr ot ect i on Agency ( EPA) .
The Cont r act or must be r equi r ed t o measur e and r ecor d t he f ol l owi ng par amet er s wi t hi n t he 3- naut i cal mi l e l i ne of t he coast : dat e and t i me, engi ne hour s of oper at i on, and f uel use r at es on al l di esel - power ed engi nes associ at ed wi t h act ual dr edgi ng equi pment and t he auxi l i ar y power gener at or s and pumps. Thi s i nf or mat i on can be obt ai ned by downl oadi ng dat a f r om t he el ect r oni c engi ne management cont r ol syst em, i f avai l abl e. The submi t t al s must be i n one of t he f ol l owi ng f i l e f or mat s: ( 1) t ext f or mat , ei t her comma or t ab del i mi t ed or ( 2) Mi cr osof t Excel . Submi t t al s wi l l be r ej ect ed t hat r equi r e pr opr i et ar y sof t war e f or access.
1. 5 RETAI NAGE AND REDUCTI ON I N CONTRACT PRI CE
Fai l ur e of t he Cont r act or t o pr ovi de t he associ at ed document s i n compl i ance wi t h r equi r ement s f ound i n t he PRE- OPERATI ONAL PLANNI NG AND REPORTI NG and OPERATI ONAL MONI TORI NG, RECORDKEEPI NG AND REPORTI NG par agr aphs wi l l r esul t i n r et ai nage and r educt i on i n t he cont r act pr i ce.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTI ON
NOT USED.
SECTI ON 01 11 35 Page 2
U.S. Army Corps of Engineers - New York District Contract: Fire Island Emergency Stabilization Project - Saltaire to Seaview
MONTH:
YEAR: 2020 sample Page: of
Vessel Name:
Engine Information Activity Information
Date Engine Name Engine Type
(Propulsion, Auxiliary, etc.)
Daily Runtime (hours)
Daily Fuel Consumption
(tons or gallons)
# of Daily Trips to Offload
Average Transit Time
Within 3- Nautical Mile Line (hours)
Average Loaded Speed (knots)
Average Unloaded
Speed (knots)
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 22, CHG 1: 02/ 23
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel
1. 2 ORDER OF WORK
Pr oceed wi t h t he pl acement of beach f i l l i n a cont i nuous manner al ong t he shor el i ne f r om t he east t o t he west , or as di r ect ed and appr oved by t he Cont r act i ng Of f i cer or Cont r act i ng Of f i cer Repr esent at i ve ( COR) .
Pl ace beach f i l l i n maxi mum 1, 000- f oot - wi de beach wor k zone/ cl osur e ar eas.
Wor ki ng i n mor e t han one cl osur e ar ea at a t i me must be at t he di scr et i on of t he COR and wi t h coor di nat i on wi t h l ocal communi t i es. Mai nt ai n access t o t he beach at al l t i mes except wi t hi n t he act i ve est abl i shed beach f i l l wor k zone( s) .
Di r ect t he use of ot her avai l abl e beach access ( i . e. nei ghbor i ng exi st i ng access ways, or t empor ar y access ways) out si de t he sand pl acement wor k zones, dur i ng const r uct i on of t he beach and dune f i l l .
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.
1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 3. 1. 2 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed i n t he pr oj ect s i t e, except i n desi gnat ed smoki ng
SECTI ON 01 14 00 Page 1 ar eas. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 3. 2 Wor ki ng Hour s
Wor ki ng hour s consi st of 24 hour s per day, 7 days per week. Compl y wi t h l ocal codes r egar di ng noi se at al l t i mes dur i ng t he cont r act per i od.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 2
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act f or whi ch Cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 1. 1 Mobi l i zat i on and Demobi l i zat i on
1. 1. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on, as def i ned i n Speci al Cont r act Requi r ement PAYMENT FOR
MOBI LI ZATI ON AND DEMOBI LI ZATI ON.
1. 1. 1. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 1. 2 Fi nal Recor d Dr awi ngs
1. 1. 2. 1 Payment s
Cont r act or shal l compl et e t he Recor d ( " As- Bui l t s" ) CAD submi t t al as r equi r ed by Speci f i cat i on t he Recor d Document s submi t t al as r equi r ed by Speci f i cat i on Sect i on 01 78 00 CLOSEOUT SUBMI TTALS.
1. 1. 2. 2 Uni t of Measur e
Uni t of measur e: Job
1. 2 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act on whi ch t he Cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
SECTI ON 01 20 00 Page 1
1. 2. 1 Hydr aul i c Beach Fi l l - West hampt on & Cupsogue Beach
1. 2. 1. 1 Payment
The t ot al amount of mat er i al accept abl y pl aced on t he beach ( f r om t he bor r ow ar eas) i s t o be pai d f or at t he cont r act uni t pr i ce as shown on t he bi d schedul e must be measur ed by t he cubi c yar d i n pl ace on t he beach by comput i ng t he vol ume bet ween t he beach sur f ace shown by a sur vey made bef or e f i l l i ng and beach sur f ace shown on a sur vey af t er f i l l i ng. The r ef er ence dat um shal l be NAVD. No payment shal l be made f or mat er i al pl aced:
( 1) I n excess of t he quant i t y t o t he desi gn gr ade pl us t he 0. 5 f oot t ol er ance. Ref er t o t he Compensat ed Sl ope par agr aph i n sect i on 31 24
00. 00 18 BEACH FI LL PLACEMENT f or except i on r egar di ng compensat ed sl ope.
( 2) For t he ext ent of t he pr oj ect as shown on t he cont r act dr awi ngs, above dune cr est pl us t ol er ance; 14 f t NAVD pl us t ol er ance on t he dune cr est ; beyond t he 1 on 5 s l ope l i ne on dune si de sl ope pl us t ol er ance, above +8. 5 f t NAVD pl us t ol er ance on t he ber m, and beyond t he poi nt wher e t he 1 on 20 sl ope l i ne f r om El . +8. 5 f t . NAVD pl us t ol er ance, i nt er sect s t he ocean bot t om. Ref er t o t he Compensat ed Sl ope par agr aph i n sect i on 31 24 00. 00 18 BEACH FI LL PLACEMENT f or except i on bel ow el evat i on +3. 0 NAVD.
( 3) Whi ch was obt ai ned f r om out si de t he desi gnat ed bor r ow ar ea or bel ow t he maxi mum dr edgi ng l i mi t of t he bor r ow ar ea, except as di r ect ed by t he Cont r act i ng Of f i cer or hi s r epr esent at i ve.
1. 2. 1. 2 Or i gi nal and Fi nal Sur veys
The Cont r act or shal l make or i gi nal and f i nal sur veys under t he super vi s i on of t he Cont r act i ng Of f i cer ' s r epr esent at i ve and shal l make comput at i ons t o det er mi ne t he quant i t i es of mat er i al s pl aced on t he beach f or accept ance.
1. 2. 1. 3 Sur veys f or Pr ogr ess Payment s
The Cont r act or wi l l make any sur veys f or per i ods f or whi ch pr ogr ess payment s ar e r equest ed and shal l make t he comput at i ons based on t hese sur veys.
1. 2. 1. 4 I ni t i al and Fi nal Sur veys
I ni t i al and f i nal sur veys f or accept ance wi l l be t aken i mmedi at el y pr i or t o and af t er f i l l pl acement . Bef or e f i l l , sur veys shal l not be t aken mor e t han 14 days pr i or t o f i l l pl acement . Sur veys wi l l be t aken on par al l el pr of i l e l i nes ( r anges) spaced at a maxi mum of 100- f oot i nt er val s. The mi ni mum st at i oni ng i nt er val wi l l be 25 f eet or at br eaks i n s l ope.
The Cont r act or shal l conduct t he or i gi nal and f i nal sur veys, wi t h t he pr esence of Gover nment r epr esent at i ves, and make t he comput at i ons based on t hem. The Cont r act or shal l conduct t he sur veys f or any per i ods f or whi ch pr ogr ess payment s ar e r equest ed and shal l make t he comput at i ons based on t hese sur veys. Al l sur veys conduct ed by t he Cont r act or shal l be done by a New Yor k l i censed sur veyor and cer t i f i ed hydr ogr apher subj ect ed t o appr oval by t he Cont r act i ng Of f i cer .
SECTI ON 01 20 00 Page 2
- The Cont r act or shal l be r esponsi bl e t o conduct al l sur veys. The Cont r act or shal l mai nt ai n wor k sect i ons - a pr e- const r uct i on and f i nal accept ance sect i on sur veyed whi l e const r uct i on i s t aki ng pl ace i n bet ween.
The pr e- const r uct i on sect i ons shoul d be mai nt ai ned at a mi ni mum 300 f eet ahead of t he f i l l pl acement . The Cont r act or shal l make such comput at i ons as ar e necessar y t o det er mi ne t he quant i t i es of wor k per f or med or f i nal l y i n pl ace and submi t t he comput at i on f or Gover nment appr oval .
- Pr ompt l y upon compl et i ng a sur vey, t he Cont r act or shal l f ur ni sh t he or i gi nal s of al l f i el d not es and al l ot her r ecor ds r el at i ng t o t he sur vey or t o t he l ayout of t he wor k t o t he Cont r act i ng Of f i cer , who shal l use t hem as necessar y t o det er mi ne t he amount of pr ogr ess payment s. The Cont r act or shal l r et ai n copi es of al l such mat er i al f ur ni shed t o t he Cont r act i ng Of f i cer or hi s r epr esent at i ve. ( FAR 52. 236- 16)
For Beach Fi l l Pl acement :
The Cont r act or wi l l coor di nat e wi t h t he Cont r act i ng Of f i cer ' s r epr esent at i ve t o mai nt ai n wor k sect i ons. The Cont r act or wi l l per f or m pr econst r uct i on sur veys bet ween 500 f eet and 1500 f eet i n advance of t he l ast accept ance st at i on but not mor e t han 14 days pr i or t o f i l l pl acement .
The sur veys shal l be per f or med i n 100 f oot i ncr ement s. Accept ance sur veys shal l be per f or med when 500 l i near f eet of beach i s dr essed and gr aded t o t empl at e.
For Bor r ow Ar ea Sur veys:
A pr e- and post - const r uct i on sur vey of t he bor r ow ar ea at l east 100 f eet al ong t he l engt h of t he bor r ow ar ea and 25- f oot i nt er val s i s r equi r ed f or t hi s pr oj ect t o moni t or t he pr e- and post - const r uct i on bor r ow ar ea condi t i ons wi t h ot her sur vey met hods appr oved by t he COR.
I n addi t i on, weekl y bor r ow ar ea sur veys ar e r equi r ed at 200- f oot sect i ons and 50 f oot i nt er val s. The Cont r act or shal l comput e t he vol ume ext r act ed and f ur ni sh al l comput at i ons, Fat homet er pl ot s, and dept h r eadi ngs ut i l i zed t o t he Cont r act i ng Of f i cer wi t h each CQC r epor t See 01 45 00
QUALI TY CONTROL
1. 2. 1. 5 Or i gi nal Fi el d Not es, Comput at i ons and Ot her Recor ds
Al l or i gi nal f i el d not es, comput at i ons and ot her r ecor ds f or t he pur pose of l ayout of sur veys conduct ed by t he Cont r act or shal l be r ecor ded i n dupl i cat i ng f i el d books, t he or i gi nal pages of whi ch shal l be f ur ni shed pr ompt l y t o t he Cont r act i ng Of f i cer , or hi s r epr esent at i ve, at t he s i t e of wor k. The Cont r act or shal l f ur ni sh t he Cont r act i ng Of f i cer , or hi s r epr esent at i ve, pr of i l e dat a f or t he sur vey i n el ect r oni c f or mat speci f i ed by t he cont r act i ng of f i cer . The sur vey dat a shal l be i n a f or mat compat i bl e wi t h bot h t he HYPACK pr ogr am and i n X, Y, Z f or mat , and st or ed on DVD' s. The Cont r act or shal l submi t t o t he Cont r act i ng Of f i cer , pr i or t o sur veyi ng, a base l i ne dr awi ng showi ng al l of f set s, el evat i on, r ef er ence l i nes and r ange l i ne l ocat i ons t o be ut i l i zed.
1. 2. 1. 6 Tempor ar y Fenci ng
No separ at e payment shal l be made f or t empor ar y f enci ng, and al l cost s i n connect i on t her ewi t h shal l be i ncl uded i n t he cont r act uni t pr i ce f or Hydr aul i c Beach Fi l l .
SECTI ON 01 20 00 Page 3
1. 2. 2 CPF Cupsoque Baysi de
1. 2. 2. 1 Payment
Payment wi l l be made f or cost associ at ed wi t h t he l i ne i t em CP Cupsoque Basi de.
1. 2. 2. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 3 OPTI ONS
1. 3. 1 Addi t i onal I nsur ance