AMENDMENT to Raritan River_AK Cut-Off FNP FCD_WQC FileActivity No. 0000-01-1003.1 CDT240001.pdf
PDF 170 KB Posted
- Solicitation number
- W912DS24B0013
About this file
This document is an amendment to a previously issued Federal/State Coastal Dredging and Water Quality Certificate (FCD/WQC) for the Maintenance Dredging of the Raritan River to Arthur Kill Cut-Off Federal Navigation Channel. The key details are:
The amendment clarifies that the dewatering conditions noted in the original FCD/WQC, issued on April 4, 2024, are not applicable since the dredged material will be discharged to the Historic Area Remediation Site (HARS) rather than dewatered. All other conditions and requirements of the original FCD/WQC remain in effect. The Corps of Engineers requested this amendment due to the difference in the dredged material disposal method. The related federal contract opportunity is for the maintenance dredging project, which will remove approximately 360,000 cubic yards of silt and clay material from the navigation channel and place it at the HARS site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Peterson, Kenneth L CIV USARMY CENAN (USA)
From: Thein, Jeff [DEP] <Jeff.Thein@dep.nj.gov> Sent: Wednesday, June 5, 2024 10:49 AM To: Peterson, Kenneth L CIV USARMY CENAN (USA) Cc: Nickerson, Gary [DEP]; Ferguson, Ryan CIV USARMY CENAN (USA); Gregory, Alexander F CIV
USARMY CENAN (USA); DEP LURFederalConsistency [DEP]; Oseback, Michael J CIV USARMY CENAN
(USA)
Subject: [Non-DoD Source] RE: Maintenance Dredging of Raritan River to Arthur Kill Cut-Off FNP FCD/WQC File/Activity No.: 0000-01-1003.1 CDT240001
Hi Ken, As per our telephone conversa on today, the dewatering condi ons noted in Project Specific Condi ons 10, 12, and 14‐ 17 of the FCD/WQC issued for the above noted project on April 4, 2024 are not applicable as the material is being discharging to the HARS. All other condi ons and requirements of the April 4, 2024 FCD/WQC remain in full force and effect.
Jeff
From: Peterson, Kenneth L CIV USARMY CENAN (USA) <Kenneth.L.Peterson@usace.army.mil> Sent: Thursday, May 30, 2024 1:12 PM To: Thein, Jeff [DEP] <Jeff.Thein@dep.nj.gov> Cc: Nickerson, Gary [DEP] <Gary.Nickerson@dep.nj.gov>; Ferguson, Ryan CIV USARMY CENAN (USA) <Ryan.M.Ferguson@usace.army.mil>; Gregory, Alexander F CIV USARMY CENAN (USA) <alexander.f.gregory@usace.army.mil>; DEP LURFederalConsistency [DEP] <LURFederalConsistency@dep.nj.gov>;
Oseback, Michael J CIV USARMY CENAN (USA) <Michael.J.Oseback@usace.army.mil> Subject: [EXTERNAL] Maintenance Dredging of Raritan River to Arthur Kill Cut‐Off FNP FCD/WQC File/Activity No.: 0000‐
01‐1003.1 CDT240001
Hi Jeff, Hope all is well.
I’m reaching out to bring to your a en on that since the dredged material from the subject project will be placed at the HARS, several FCD/WQC condi ons (Condi on 10, 12, 14 – 17, and maybe more) may not apply. Also, would the use of an environmental bucket be a requirement for this project?
Please let me know your thoughts.
Thanks, Ken
Kenneth Peterson Project Engineer Operations Division, Technical Support Section U.S. Army Corps of Engineers, New York District 917‐790‐8541 (Office) 917‐620‐1032 (Mobile)