Amendment 0001.pdf.pdf
PDF 216 KB Posted
- Solicitation number
- W912DS24B0013
About this file
This document is an Amendment to a Solicitation for a federal contract opportunity.
The amendment revises and reissues the bid schedule, provides answers to Requests for Information, and outlines project-specific conditions from the New Jersey Department of Environmental Protection. The bid opening date is extended to June 20, 2024 at 3:00 PM EST. The amendment modifies the contract by changing the units for two line items from "Job" to "CY", decreases the bid acceptance period from 120 to 90 days, and clarifies that certain dewatering conditions do not apply since the dredged material will be placed at the Historic Area Remediation Site. The underlying federal contract opportunity is for maintenance dredging of the Raritan River to Arthur Kill Cut-off Federal Navigation Channel, with a basic work dredging depth of -20 feet MLLW plus 1 foot of allowable overdepth (280,000 CY), and an option to dredge an additional 1 foot of overdepth (80,000 CY). The dredged material will be placed at the Historic Area Remediation Site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
Revise and reissue bid schedule Answ er RFIs for informational purposes only Provide NJDEP Project Specif ic Conditions listed in the Water Quality Certif icate Bid Opening Date is hereby extended to 20-June-2024 at 3:00 P.M. EST NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods:
In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS24B0013
X 9B. DATED (SEE ITEM 11)
15-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jun-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS24B0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
FOB: Destination
PSC CD: Y1KZ
NET AMT
0002 278,885 Cubic
Yard
BASIC WORK - Dredging, Transportation, FFP and Placement of Dredge Material Removal of material (278,885 CY) except ledge rock lying above the plane of 20 feet below mean lower low water (MLLW), plus 1-foot allowable over-depth from the Basic Work Dredging Area of the Raritan River to Arthur Kill Cut-Off, New Jersey Federal Navigation Project with transport and placement of the dredged material at the Historic Area Remediation Site (HARS). (Estimated Quantities).
0003 1 Job Black Box Monitoring Unit
FFP
See specifications section 35 20 23.10 18
0004 81,600 Cubic
Yard
OPTION OPTION 1 - Dredging, Transportation, FFP and Placement of Dredge Material Removal of additional 1-foot allowable overdepth material (81,600 CY) to a total allowable over-depth of 2 feet below 20 feet below MLLW, from the Dredging Area of the Raritan River to Arthur Kill Cut-Off, New Jersey Federal Navigation Project with transport and placement of the dredged material at the Historic Area Remediation Site (HARS). (Estimated Quantities). Execution of options are at the discretion of the Government and may be exercised within five
(5) calendar days of receipt by the contract of the Notice to Proceed (Basic Work).
If the option is exercised, the work will be performed in conjunction with the Basic Work. If exercised, the time for contract completion of the option will be based on the rate of one (1) additional calendar day for each 8,000 cubic yards in the option.
TOTAL BASE BID (CLIN 0001 THRU 0003) .......................................... $ __________________________
TOTAL OPTION BID (CLIN 0004).......................................................... $ ___________________________
TOTAL BID (CLIN 0001 THRU 0004) ..................................................... $________________________________
The attached redacted WQC hereby removed the following lines 10, 12 and 14-17 The attached emails further show approval of the redacted WQC. A clean copy of the WQC has been requested and will be provided to the apparent low bidder
(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)
1. When does the Government anticipate issuing contract award and NTP?
A1: The Government would like to issue contract award as early as practicable, anticipated in the July-August timeframe but is subject to change at the government’s discretion.
The Government would like to issue Notice to Proceed as early as practicable, anticipated in the August- September timeframe but is subject to change at the government’s discretion.
2. SF 1442 #13 D - Considering the short contract duration of 48 days, please lower the 120 calendar days allowed for Government acceptance to 60 days. Requiring the contractor to provide such a long guarantee for a small job is not practical. It could also lead to reduced competition by encouraging contractors to pass on bidding the project for fear of missing other projects while they wait for the 120-day guarantee to expire.
Additionally, 120 days potentially pushes the award, and then NTP, several months beyond the earliest allowable Environmental Window start of July 1st. Finally, the 120-day allowance also potentially pushes the project into the winter months with more adverse weather, which increases bid pricing due to that risk.
A2: Bid acceptance period is hereby changed to 90 days.
3. Bid Items 0002 and 0004 state the unit is “Job.” The “Notes to Bidders” area states these units should be
“CY”. Please change Bid Item 0002 and 0004 units from “Job” to “CY.”
A3: By this amendment, the unit for bid items 0002 and 0004 is changed from “Job” to “CY”.
4. Project Specific Condition #10 in the “Federal Consistency Determination / Water Quality Certification” letter dated April 4,2024, states, “all barges or scows used to transport sediment shall be of solid hull construction or be sealed with concrete.” The material on this project is going to HARS and spilt hull scows must be used. Please correct.
A4: Per the New Jersey Department of Environmental Protection (NJDEP) email attached, the dewatering conditions noted in Project Specific Conditions #10, 12, and 14-17 of the FCD/WQC issued on 04 April 2024, are not applicable as the material is being discharged to the Historic Area Remediation Site (HARS). All other conditions and requirements of the 04 April 2024 FCD/WQC remain in full force and effect.
5. Project Specific Condition #3 in the “Federal Consistency Determination / Water Quality Certification” letter dated April 4,2024, states, “all sediments from this project shall be removed using a closed clamshell environment bucket.” The material is approved for HARS disposal. We request this language is amended to allow closed clamshell navigation buckets to perform the work. The navigation bucket is very similar to a closed clamshell environmental bucket. The only difference being the navigation bucket has rubber seals along the sides instead of overlapping side plates.
A5: The use of a closed clamshell environmental bucket is a standard requirement found in NJDEP issued FCD/WQCs for maintenance dredging projects in the NY/NJ Harbor area. Per the New Jersey Department of Environmental Protection (NJDEP) email attached, Condition #3 requiring the use of a closed clamshell environmental bucket remains in full force and effect. Subsequent to contract award, the awardee may submit a request to have the NJDEP FCD/WQC modified to allow the use of a closed clamshell navigation bucket. As the regulatory agency, the NJDEP will determine if a modification to the current FCD/WQC may be made.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 18-Jun-2024 02:00 PM to 20-Jun-2024 03:00 PM.
The offeror acceptance period has decreased by 30 from 120 to 90.
CLIN 0002
The unit of issue has changed from Job to Cubic Yard.
CLIN 0004
The unit of issue has changed from Job to Cubic Yard.
(End of Summary of Changes)