This document is a Summary of Work for a Maintenance Dredging of Great Kills Harbor, NY Federal Navigation Project (Contract No. W912DS24B0012). The project requires the contractor to provide all materials, equipment, and services to perform maintenance dredging of approximately 190,885 cubic yards of material from Great Kills Harbor, NY and subsequently transport and place the dredged material at the Historic Area Remediation Site (HARS). The contract has a completion time of 33 calendar days and requires a minimum average production rate of 8,000 cubic yards per day. The dredged material has been determined to be primarily silt and clay. The contractor will be responsible for obtaining all necessary permits and approvals for offloading, transportation, dewatering, processing, and disposal of the dredged material. The contractor must comply with all conditions of the State Water Quality Certificates. The project is anticipated to be performed between September 2024 and January 2025, with no dredging permitted from January 15 through September 1. The contractor must also provide site control services, fencing, and signage to secure the work area and ensure public safety.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maintenance Dredging of Great Kills Harbor, NY FNP GKH24
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
01/20
PART 1 GENERAL
1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.2 WORK COVERED BY THE CONTRACT DOCUMENTS
1.2.1 Project Description
1.3 PERFORMANCE OF WORK BY THE CONTRACTOR
1.4 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS
1.5 DATUM AND BENCH MARKS
1.6 MISPLACED MATERIAL
1.7 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING
1.8 EXISTING WORK
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
W912DS24B0012
SECTION 01 11 00
SUMMARY OF WORK
01/20
PART 1 GENERAL
1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
a. The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and
(iii) complete the entire work ready for use, not later than 33 calendar days , after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(FAR 52.212-3)
b. All work shall be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer or Contracting Officer Representative (COR) and subject, in every detail, to his supervision, direction, and instructions.
1.2 WORK COVERED BY THE CONTRACT DOCUMENTS
1.2.1 Project Description
The work to be performed under this project consists of providing all materials, plant, labor, equipment and services (except those furnished by the Government) to perform maintenance dredging of Great Kills Harbor, New York, Federal Navigation Project, with placement of the material at the Historic Area Remediation Site (HARS). The Contractor will be solely responsible for coordinating, obtaining, and be in compliance with all requirements for transportation, offloading, dewatering, processing, and disposing of the dredge material, as well as for obtaining all permits and for meeting all requirements for the processing and disposal site(s) identified by the Contractor. See Section 35 20 29 entitled "DREDGED MATERIAL TRANSPORT AND PLACEMENT MONITORING" for more information.
The maintenance for this project consists of dredging approximately 190, 885 CY of material based on the plans and specifications survey performed in February 2024. For more details, see "ESTIMATED QUANTITIES" in Section 00 30 00 "ADMINISTRATIVE REQUIREMENTS" of these Specifications. The dredge material has been determined to be composed of primarily silt and clay.
A summary of the Dredging Areas is shown in the table below:
DREDGING AREAS TOTAL ESTIMATED
QUANTITY (CY)
BASIC WORK-Dredging Area 1: (-10' MLLW + 2' OD) 190,885
SECTION 01 11 00 Page 2
Contract time for completion is based on a minimum average production rate of 8,000 cubic yards (CY) per day for dredging, transportation, processing and placement at a contractor furnished, state permitted, Government approved upland placement site(s). Should the total quantity of material exceed the estimated quantities within the Solicitation Contract Form, additional time will be allowed at the rate of one (1) calendar day for each 8,000 cubic yards in excess of the established limit. The time stated for completion shall include final clean up.
The contractor must bid on all items of the bid schedule. The following CLINs require dredging of the Great Kills Harbor, New York, Federal Navigation Project, with subsequent transportation and placement of the dredged material at the Historical Area Remediation Site (HARS)::
CLIN 0002 (BASIC WORK-Dredging Area 1 - requires dredging to the plane of -10 feet Mean Lower Low Water (MLLW) plus 2 foot allowable overdepth).
Based on the plans and specifications survey performed in February 2024, the maximum quantity available to be dredged is 190,885 CY from the contract areas in the Great Kills Harbor, New York, Federal Navigation Project. For a detailed breakdown of quantity available to be dredged, see paragraph 1.9 "ESTIMATED QUANTITIES" in Section 01 30 00 of the Specifications.
Scow monitoring is required for this project. The contractor is required to comply with Section 35 20 29 entitled "DREDGED MATERIAL TRANSPORT AND PLACEMENT MONITORING", of these specifications.
Sampling and testing was conducted by the Government in 2022, and the grain size test results are included in the specifications in Section 00 90 01 as Attachment J. The complete sampling and testing results can be found as attachments to this solicitation on SAM.gov. Using the 2022 test results, the Apparent Low Bidder shall coordinate with the State(s) to obtain necessary offloading, transportation, dewatering, processing, and disposal permits/requirements of the site(s) identified by the Apparent Low Bidder.
The Contractor shall be solely responsible for coordinating, obtaining, and complying with all the offloading, transportation, dewatering, processing and disposal permits/requirements of the site(s) identified by the Contractor.
The State Water Quality Certificates (WQCs) for the maintenance dredging of Great Kills Harbor, New York, Federal Navigation Project is attached in Section 01 90 02 of this solicitation. The contractor must comply with all conditions of the State WQCs.
The work is anticipated to be performed within the approximate time period of September 2024 - January 2025.
Dredging is prohibited during the seasonal no-dredging window from 15 January through 01 September. See Section 00 90 01, for all enforced dredging prohibition periods.
If necessary, the Apparent Low Bidder must notify the Administrator of the Federal Aviation Administration (FAA) of his proposed construction methods, via Form 7460-1. The Apparent Low Bidder is responsible for all coordination with the FAA, and for determining if any more recent FAA requirements now exist.
SECTION 01 11 00 Page 3
Security: The Contractor shall provide unarmed Site Control Services, including a 4x4 vehicle to secure the beach access points at Crookes Point Road and the fishing parking area on the west side (harbor side) of Crookes Point Road for 24 hours per day, 7 days per week. Site Control Service personnel cannot be the SSHO and cannot have other duties.
Ensuring that the beach remains closed off to the public in the location of the dredging work will be their sole responsibility and they will conform with the requirements of the National Park Service.
Site Control Service Personnel shall maintain adequate communication with National Park Service Officers and Dispatch as necessary. The Contractor and the Site Control Service Personnel shall review the requirements set forth in the National Park Service (NPS) Special Use Permit and ensure all conditions of Special Use Permit shall be followed. The NPS Special Use Permit can be found in Section 00 90 01, Attachment M.
Prior to construction the contractor shall erect a fence around the work area along the shoreline in order to keep the public from accessing the work area in coordination with the National Parks Service request. See Section 00 90 01 for National Park Service Special Use Permit requirements.
Four (4) large signs stating "Do Not Enter - Unsafe Areas" shall be placed along the fence closure. Additional signs stating "Beach Closure Ahead. Do Not Enter - Unsafe Areas" shall be posted at the trail entrances and beach access points in the Great Kills Harbor. A map of proposed sign locations can be found in Section 00 90 01, Attachment M. All signs shall be 3'x3'.
The signs shall contain a warning illustration identifying the hazards of the sandy beach collapse into deep water adjacent to dredging operations.
Other signs shall be posted along the fence line in accordance with Section 01 50 00 Temporary Construction Facilities And Controls - Paragraph 2.2.4.
Site Control Services, signs and fencing shall remain active on site until scarping and overall disturbance of the beach at the dredging area has stabilized and general safety of the area at the dredging location is held to be acceptable. Prior to the expiration of the National Park Service Special Use Permit or at the direction of the USACE and National Park Service, all signs, fencing, and appurtenances shall be removed from the Project Area.
1.3 PERFORMANCE OF WORK BY THE CONTRACTOR
The Contractor shall perform on the site, and with its own organization and equipment, work equivalent to at least forty (40) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performance of the work, the Contractor requests a reduction and the Contracting Officer and/or his Representative determines that the reduction would be to the advantage of the Government. (FAR 52.236-01)
1.4 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS
The entire work (CLINs 0001 through 0003) is estimated to cost approximately $1,000,000.00 to $5,000,000.00.
SECTION 01 11 00 Page 4
1.5 DATUM AND BENCH MARKS
Soundings and Elevations shown in the contract drawings are in US Survey Feet and refer to Mean Lower Low Water (MLLW) [epoch 1983-2001]. The Plane of MEAN LOWER LOW WATER (MLLW) is 3.0 FEET BELOW NAVD88 AS DETERMINED USING VDATUM (VER. 4.6.1). The following Benchmark information should be referenced for defining local datum and required project depth.
Great Kills Harbor, New York, Federal Navigation Project
NSRS Benchmark:
Benchmark: "U 343"
PID: KV0387
Elevation: 7.12' (NAVD 1988)
Local Control Data:
Benchmark: Crookes
PID: KV4656
Elevation: 13.41' (NAVD 1988)
All control should be verified prior to utilization.
The contractor may contact the New York District Survey Section at (201) 333-0284 for assistance in bench mark discrepancies or clarification in benchmark and / or tide gage location.
1.6 MISPLACED MATERIAL
Should the Contractor during the progress of the work, lose, dump, throw overboard, sink, or misplace any material, plant, machinery, or appliance, which in the opinion of the Contracting Officer and/or his Representative may be dangerous to or obstruct navigation, the Contractor shall recover and remove the same with the utmost dispatch. The Contractor shall give immediate notice, with description and location of such obstructions, to the Contracting Officer and/or his Representative or inspector, and when required shall mark or buoy such obstruction until the same are removed.
Should he refuse, neglect, or delay compliance with the above requirements, such obstructions may be removed by the Contracting Officer and/or his Representative, and the cost of such removal may be deducted from any money due or to become due to the Contractor, or may be recovered under his bond. The liability of the Contractor for the removal of a vessel wrecked or sunk without fault or negligence shall be limited to that provided in Sections 15, 19, and 20 of the Rivers and Harbors Act of March 3, 1899 (33 USC. 410 et seq.) (DOD FARS SUPPL. 52.236-7006).
1.7 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING
Do not inflict damage upon land and properties outside the authorized construction area by unwarranted entry upon, passage through, damage to, or disposal of, material on such land or property. The Contractor may make a separate agreement with any other party, regarding the use of, or right to, land or facilities outside the contract area. If such an agreement is made, it must be in writing and a copy shall be provided to the Contracting Officer. The Contractor must hold and save the Government, its officers, and agents free from liability arising from trespassing or damage occasioned by his operations.
SECTION 01 11 00 Page 5
1.8 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 6
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK |
| 1.2 WORK COVERED BY THE CONTRACT DOCUMENTS |
| 1.2.1 Project Description |
| 1.3 PERFORMANCE OF WORK BY THE CONTRACTOR |
| 1.4 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS |
| 1.5 DATUM AND BENCH MARKS |
| 1.6 MISPLACED MATERIAL |
| 1.7 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING |
| 1.8 EXISTING WORK |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |