This amendment to the solicitation for the maintenance dredging of Browns Creek in New York provides answers to bidder questions for informational purposes only. The Army Corps of Engineers issued Amendment 00002 to Solicitation W912DS23B0014 for the maintenance dredging of Browns Creek Federal Navigation Project in New York. The amendment answers three bidder questions regarding the start date for physical work and schedule submission, the expected notice to proceed date to account for boating traffic and equipment planning, and confirmation that the project superintendent, site safety and occupational health officer, and quality control manager roles may not be held by a single person for multiple shift work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Answ er questions to prospective bidders for informational purposes only.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE DATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23B0014
X 9B. DATED (SEE ITEM 11)
02-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jul-2023
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS23B0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 00002
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation. This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.
Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted on SAM.Gov.
Q1. Section 01 11 00 – 1.1 states that work must commence within 5 days of the Notice to Proceed (NTP) and Section 01 32 01. 00 10 – 3.1.1 Scheduling and Determination of Progress state that a practicable progress schedule must be submitted with 5 days of the NTP. Should we assume the physical work and the 45 calendar days completion schedule starts 5 days after the NTP, or will the Contractor be able to set a schedule for when that 45 days completion time begins? When should the Contractor expect the NTP so we can account for boat traffic, ferry timelines and planning equipment for the project? We also believe it would be best to complete the project later in the year to not interfere with the boating season.
A1. Per section 01 11 00 paragraph 1.1, “The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire basic work ready for use, no later than forty-five (45) calendar days after the date the Contractor receives the notice to proceed”. Per section 01 32 01.00 10 paragraph 3.1.1 “…the Contractor shall, within five (5) days after receipt of Notice to Proceed by him or as otherwise determined by the Contracting Officer and/or his Representative, submit for approval a practicable progress schedule”. With respect to expected NTP, the Contracting Officer may issue NTP after the approval of all necessary submittals and after all requirements of the Preconstruction Conference are met. The Contracting Officer will not issue NTP during no-dredge windows.
Q2. Please confirm that a full time Project Superintendent, Site Safety and Occupational Health Officer and Quality Control Manager is required for each shift. Can any of these roles be held by one person?
A2. Per section 01 35 26 paragraph 1.1.1.4.1.b “…For a project involving multiple work shifts, provide one full-time SSHO for each additional shift”. Per section 01 45 00.00 20
W912DS23B0014
paragraph 1.4 “No construction work or testing may be performed unless the QC Manager is on the work site”, per section 01 45 00.00 20 paragraph 1.5.1.1 “The QC Manager shall not hold any other positions or perform any other duties on this contract…During 24 hours dredging operations an QC manager shall be on duty during all shifts” Per section 01 35 26 paragraph 1.6.1.1.1 “The SSHO may not serve as the Quality Control Manager. The SSHO may not serve as the Superintendent”.
Q3. Given the July 4th holiday, we request a delay in the bid opening for the above-referenced project.
A3. The bid opening date will not be extended.
(End of Summary of Changes)