This document is an amendment to a solicitation for roof repair services at Building 4002 in Thule, Greenland. The U.S. Army Corps of Engineers, New York issued Amendment 0001, which provides responses to bidder questions, revises and adds drawings, and clarifies radar safety protocols during work. Roof replacements are needed for the low slope roofs. Bidders must acknowledge receipt of the amendment by May 15, 2023. The amendment establishes that existing insulation thickness is 40mm for planning purposes, and confirms drainage requirements. It also provides details on coordinating radar shutdown periods when working in unsafe zones in front of active radar equipment. The solicitation number is W912DS23B0002 for repairs at Thule Air Base in Greenland by the Department of the Army Corps of Engineers, New York district.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: 1) Provide rsponses to RFIs for informational purposes only, 2) Provide Revised and Reissued Draw ings, and 3) Provide Added Draw ings

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23B0002

X 9B. DATED (SEE ITEM 11)

27-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-May-2023

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS23B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

AMENDMENT 0001 to DRAWINGS and SPECIFICATIONS for Bldg 4002 Roof Replacement at Pituffik (Thule) Greenland.

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- Drawing G-001

3. The following DRAWINGS have been ADDED:

- Drawing R-505

- Drawing R506

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- None

BIDDER QUESTIONS AND GOVERNMENT REPLY

Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Bidders “for information only” and do not revise the solicitation, plans or specifications.

1. Drawing G-003 – note 39 - The building has a HEMP shielding system that must be protected especially around penetrations into the building. Please confirm that this contract has no HEMP work included.

RESPONSE: Correct, there is no HEMP work anticipated as part of this roof replacement.

W912DS23B0002

2. Drawing G-003, note B and C – Safety regarding radar and work while radar in active - Is it completely safe to work in the immediate vicinity of the radar, if not in front of the radar, while the radar is active or will the radar be turned off while work is ongoing on the roof – also next to and behind the radar? If possible, please define the safe areas and the unsafe areas work areas while radar is active. If it is not safe, what hours can we expect the radar to be turned off each day for the unsafe areas? We plan on 12 hour shifts from 0600 to 1800, 6 days a week.

RESPONSE: Please refer to section 01 14 00 par 1.2.5.1 for radar shutdown coordination. The lower flat roof has a safe zone established when the radar is in operation (refer to drawing A101 showing the SECURITY LINE), any work in front of the radar can be performed ONLY when the radar is not in use, the duration and time of radar shutdown will not be known until the winning contractor initiates the coordination thru the COR.

3. Drawing A-102 – The details state new insulation to match existing thickness. Can we expect the insulation thickness to be the same on the entire low slop roofs?

RESPONSE: Correct, it is assumed that the existing insulation thickness is the same for the entire low slope roof.

4. As the new insulation is shown above the future EPDM we expect positive drainage to be part of the existing concrete roof structure. Please confirm.

RESPONSE: Confirmed, as noted in general Note 9 on drawing sheet G-003.

5. Insulation thickness: on drawing/photos R-901B we can establish that the roof pavers are approximately 4 inches.

We are not able to establish the thickness of the existing insulation although insulation is shown on picture detail H12. Please establish the thickness of the insulation.

RESPONSE: The existing insulation thickness is 40mm, please refer to Drawing R-505 & R506 for as-build conditions, as issued under this amendment.

6. G003, note 9 - Existing tar membranes - Can we expect original tar membranes (as noted on R501, section B-B) to be existing on entire low slope roofs, or have the tar layers, either partly or completely, been scraped off / removed on previous projects?

RESPONSE: Unfortunately, the government is unable to determine whether previously installed low slope roof membrane systems, such as built-up roofing under the existing membrane, have been fully or partly removed.

7. In case we need to scrape off the original tar membrane on the concrete surface, what is the max acceptable load capacity of the concrete roof – needed in order to establish whether small machinery or manual work is needed.

RESPONSE: Unfortunately, the Government is unable to provide load capacity of the roof. However, if the small machine (several hundred pounds) is to be used, it should not be an issue.

(End of Summary of Changes)