This document provides details for a federal solicitation seeking maintenance dredging services. The U.S. Army Corps of Engineers, New York District is soliciting proposals to dredge approximately 64,000 cubic yards of material from the Federal Navigation Channel at the Port of Coeymans in New York. Dredging must be completed using an environmental clamshell bucket between September 1st and November 30th, 2022. Dredged materials will be transported via hopper barge or tugboat to the government-provided placement site at Houghtaling Island for containment and dewatering. In addition to dredging, contractors will prepare, maintain, and restore the placement site as needed. The estimated value of the contract is between $1-10 million. The solicitation number is W912DS22B0017 and proposals are due by June 28th, 2022 with award anticipated on July 1st and notice to proceed on July 15th, 2022. Liquidated damages are $1,349.30 per day for delays in completion.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0003 is:

1) Bid opening date remains 21-July-2022 at 2:00 P.M. EST

2) Revise and Reissue Specif ication Sections 01 11 00, 01 20 00 and 35 20 23.

3) Incorporate the Site Visit Sign-In Sheet.

4) Respond to bidder requests for information. For information only.

5) Incorporate the Water Quality Certificate and NYS Parks Application for section 00 90 02.

NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods: In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jul-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS22B0017

X 9B. DATED (SEE ITEM 11)

08-Jun-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jul-2022

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS22B0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

Maintenance Dredging, Hudson River, NY Federal Navigation Project Port of Coeymans, New York

W912DS-22-B-0017

Amendment 0003

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS:

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

3. The following DRAWINGS have been ADDED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

a. None

2. The following SPECIFICATION SECTIONS have been DELETED in their entirety:

a. None

3.The following SPECIFICATION SECTIONS has been REVISED and REISSUED:

- SECTION 01 11 00 – Summary of Work; Paragraph 1.2.1:

Replace sub-paragraph 1.2.1, page 1, in its entirety as below:

The Maintenance for this project consists of dredging approximately 63,895CY of material based on a survey done between June and July 2021. For more detail, see "ESTIMATED QUANTITIES" in Section 00 30 00 "ADMINISTRATIVE REQUIREMENTS" of these Specifications. The dredge material at the Port of Coeymans has been determined to be approximately 0.9% Gravel, 83.1% Sand, 12.0% Silt and 4.1% Clay.

SECTION 01 20 00 – Technical Specifications; Paragraph 7.2.1:

Replace sub-paragraph 7.2.1, page 4, in its entirety as below:

Site U-3A is a previously used 78-acre upland Confined Disposal Facility (CDF) located on the southern end of Houghtaling Island. Approximately 30-acres of the site are available to the Contractor for the placement of dredged materials from this maintenance dredging project. CDF Areas A & B have been designated for the placement and containment of dredged materials as shown in Plan Sheet 3 of 7.

Dredged materials removed from Port of Coeymans dredge areas will be placed in Area A. Material excavated from “Dredging Area B,” as indicated in Plan Sheet 9 of 7, will be placed first in Area B of the DMPS. The general interior site elevations in Area A and B range from approximately 35 feet to 50 feet NAVD88. There are existing usable containment dikes with approximate top elevations of 50 feet NAVD88 on the site. Additional earthwork will be required to repair and maintain existing dikes.

Areas A & B utilize an existing pre-approved influent pipeline access corridor on the west side adjoining the Hudson River that may be used for pipeline access from the Contractor’s pump out/mooring facility to the interior of the placement site. Area A & B also have existing pre-approved effluent pipeline outlet corridors, which are also located on the west side of the placement site adjoining the Hudson River. The Contractor is required to use these ingress and egress corridors for locating and installing their pipelines. The Contractor is responsible for ensuring that dredging and placement operations comply with all environmental and water quality standards. Contractors shall be required to monitor activities and be prepared to adjust their dredging and placement operations as necessary to ensure compliance.

SECTION 35 20 23 – Dredging; Paragraph 3.3.1:

Replace sentence in sub-paragraph 3.3.1, page 8, in its entirety as below:

Provide for safe transportation and placement of dredged materials. Transport and placement of dredged material in the Houghtaling Island DMPS. The Contractor may, at her/his option, place clean dredge material in Area A and contaminated material in Area B of the site. The placement of dredged materials in unauthorized places is forbidden. Comply with rules and regulations of all, federal, state and local authorities.

4. The following SPECIFICATION SECTIONS have been REVISED but NOT

REISSUED:

- None

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)

Question No. 1: Is bed-leveling permitted in the designated dredge areas upon substantial completion of dredging operations?

Response: Bed-leveling will be permitted upon substantial completion of dredging, as approved by USACE.

Questions No. 2: With respect to the current high demand for infrastructure improvement projects regionally and the resulting industry labor and resource shortage, would the US Army Corps of Engineers have the flexibility to consider allowing procurement of this project to take place this year, yet permit the execution of the inwater work to be performed during next year’s environmental dredge window – September Through November of 2023?

Response: All in-water work for the current project must be conducted between September 2022 – November 2022.

Question No. 3: We could not find the referenced “Water Quality Certificate (11 pages) for the maintenance dredging of the Hudson River, NY, Federal Navigation Project” or the NYS Parks Permit application described in section 00 90 02 and throughout. Could these please be provided?

Response: The Water Quality Certificate and NYS PARKS application will be included with this amendment (Amendment 2).

Question No. 4: Section 01 20 00, Page 4, subsection 6 states that a closed environmental clamshell bucket is required to be used. Section 01 11 00, Page 1 , subsection 1.2.1 describes the material as 83.1% sand, this is also present in Section 35 20 23, page 4, subsection 2.1.a and Sec. 01 20 00, page 3, subsection 3.1. It is unlikely that a bucket of this type will be able to penetrate and dig material of this character, should this type of bucket be unsuccessful in the removal of the material, will the use of a conventional bucket be allowed?

Response: NYS DEC Water Quality Certification, and NOAA Fisheries consultation, requires the use of an environmental bucket for the 2022 Maintenance Dredging at the Port of Coeymans. If dredging is severely hindered by the use of an environmental bucket, USACE may request permission to use a conventional bucket from NYS DEC;

without said permission, all in-water work must be completed with an environmental bucket.

Question No. 5: Please confirm that the placement site work line item is only for work incidental and necessary to the dredging and placement operations and restoration of areas impacted by those operations, not new construction of improvements to the site.

Response: The placement site work contract line item includes all potential work as described in Section 01 20 00, Part 7 - Placement of Dredged Material. No new construction of improvements are specified in the contract, but the site will need to be prepared for receiving material, maintained throughout dredging, and restored and stabilized at the end of the contract performance period.

Questions No. 6: Could the site visit attendance list please be posted?

Response: The site visit attendance list will be included with this amendment.

(End of Summary of Changes)