This amendment modifies a solicitation for maintenance dredging of the New York Harbor, Sandy Hook Federal Navigation Channel. The scope of work includes dredging approximately 103,185 cubic yards of material from the channel to a depth of 35 feet below mean lower low water, transporting the material, and placing it in an offshore borrow area. Bidders must bid on all line items, which include the base work of dredging and transport, a monitoring unit, and an option for dredging and placement at an upland site. The bid due date is July 30, 2021. Award will be made to the responsible and responsive bidder offering the lowest total price for all line items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 030820211419W912DS21B0013.xlsx | XLSX spreadsheet | |
| Copy of AbstractForm1419W912DS21B0013.xlsx | XLSX spreadsheet | |
| SHC 21 Drawing Sheet 4_Amendment 0004.pdf | ||
| SHC 21 Drawing Sheet 5_Amendment 0004.pdf | ||
| SHC 21-B-0013_Amendment 0004.pdf | ||
| W912DS21B0013-Amendment 0003.pdf | ||
| W912DS21B0013 0002.pdf | ||
| W912DS21B00130001.pdf | ||
| 3 - (Revised) SCH21 Specifications 2021 06 09.pdf | ||
| 22062021W912DS21B0013.pdf | ||
| 2 - SCH21 Plan Drawing Sheets 1-6 RTA_May 2021.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. update and reissue specifications/plans,
2. update quantity increase on CLINS 0002, 0004.
Bid due date remains 30 July 2021 at 2:00 P.M. EST
Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow in methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0013
X 9B. DATED (SEE ITEM 11)
22-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jul-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS21B0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Mobilization and Demobilization
FFP
FOB: Destination
PSC CD: Y1KF
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 103,185 Cubic
Yard Basic Work – Dredging
FFP
Basic Work – Dredging, Transportation and Placement of Dredged Material Dredging of material except ledge rock to -35 feet mean lower low water (MLLW) + 2 foot allowable overdepth from the New York Harbor, Sandy Hook Federal Navigation Channel with Transportation and Placement of the dredged material at the Sea Bright Offshore Borrow Area (SBOBA) placement area identified on the plan drawing. ESTIMATED QUANTITY.
FOB: Destination
PSC CD: Y1KF
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
Black Box Monitoring Unit
FFP
See specifications section 35 20 23.10 18
FOB: Destination
PSC CD: Y1KF
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 103,185 Cubic
Yard OPTION Option 1
FFP
Dredging, Transportation, Offloading, and Placement of Material from Basic Work Dredging Area (Item 0002) to a contractor-furnished, state permitted, government approved, upland placement site(s). This Line Item represents the difference (positive or negative) between the Basic Work (Line Item 0002) and Option 1 (Line Item 0004).
FOB: Destination
PSC CD: Y1KF
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
NOTES TO BIDDERS:
TOTALS
TOTAL BASE BID (CLINS 0001 THRU 0003) $ ___________________
TOTAL OPTION (CLINS 0004) $ ___________________
TOTAL BASE BID PLUS OPTION (CLINS 0001 THRU 0004) $ ___________________
NOTES TO BIDDERS:
NOTE 1: Bidders must bid on all items. Failure to bid on all work will be cause for rejection of the bid as nonresponsive.
NOTE 2: Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINs 0001-0004.
NOTE 3: The unit price for CLIN 0002, is directly related to the estimated quantities of dredged material available for removal, except ledge rock, lying above the plane of 35 feet below MLLW plus 2-foot allowable overdepth in the contract areas of New York Harbor, Sandy Hook Federal Navigation Channel.
NOTE 4: All bidders are hereby advised that the estimated dredge quantities for placement in the price schedule are estimated and based on the survey data collected on14-16 and 19 July 2021.
NOTE 5: The Government may reject a bid as non–responsive if the prices bid are materially unbalanced between line items and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low bid.
NOTE 6: Exercise of options are at the discretion of the Government and may be exercised at the time of award, if they are exercised at all.
NOTE 7: Option 1 represents the difference in price per cubic yard (positive or negative) between the Basic Work with SBOBA placement (CLIN 0002) and the placement of the dredge material at a contractor-furnished, state approved, upland placement site(s) as noted in Option 1 (CLIN 0004). As an example, if placement at an upland site is lower cost than placement at SBOBA, then the price per cubic yard for Option 1 would be negative to reflect the reduced cost. If placement at an upland site is higher cost than placement at SBOBA, then the price per cubic yard for Option 1 would be positive to reflect the increased cost of Option 1. If there is no difference in prices between upland and SBOBA placement, then the price per cubic yard for Option 1 would be zero.
NOTE 8: Should Option 1 be exercised, only dredging with placement at a contractor-furnished, state approved, upland placement site will be required (Option 1).
NOTE 9: Should no Option be exercised, only dredging with SBOBA placement will be required (Basic Work).
NOTE 10: It is the contractor’s responsibility to comply with all conditions and requirements of the SBOBA or upland placement site.
NOTE 11: Bidders are reminded that they must bid on the issued plans and specifications as amended.
Any deviations, conditions or attachments made by the bidder himself may render the proposal non-responsive and may be cause for its rejection.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 24 dys. ANP 1 CIVIL WORKS TEAM
26 FEDERAL PLAZA, RM 17-512
NEW YORK NY 10278-0090
FOB: Destination
W912DS
0002 24 dys. ANP 103,185 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0003 24 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
0004 24 dys. ANP 103,185 (SAME AS PREVIOUS LOCATION) FOB: Destination
W912DS
(End of Summary of Changes)