Specs-part2.pdf
PDF 15 MB Posted
- Solicitation number
- W912DS19R0005
About this file
Specs Part 2 of 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DS19R0005-Amendment0002.pdf | ||
| CTC.pdf | ||
| W912DS19R0005-Amendment0001.pdf | ||
| Specs-part1.pdf | ||
| W912DS19R0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building knowledge
Job Order Contract Technical Specifications
Book 3 of 5 CSI Divisions 14 - 22 May 2018
Seneca Army Depot
This Page Intentionally Left Blank
Table of Contents
May 2018
Seneca Army Depot TOC - 1
01 General Requirements
01 22 16 00 No Specification Required 01 32 33 00 Allowances 01 32 33 00a Schedule Of Values 01 32 33 00b Contract Modification Procedure 01 32 33 00c Payment Procedures 01 32 33 00d Special Procedures for Historic Treatment 01 32 33 00e LEED Requirements 01 32 33 00f References 01 32 33 00g Abbreviations, Acronyms, Definitions, and Symbols 01 32 33 00h Cutting and Patching 01 51 13 00 Electrical Renovation 01 51 13 00a Panelboards 01 52 13 00 Temporary Facilities and Controls 01 54 23 00 Scaffolding Tubular Steel 01 54 23 00a Unit Masonry Assemblies 01 56 26 00 Sediment Removal 01 56 26 00a Erosion Control 01 58 13 00 Signage 01 71 23 16 Execution Requirements 01 74 19 00 Construction Waste Management
02 Existing Conditions
02 32 13 00 Subsurface Drilling, Sampling, And Testing 02 41 13 13 Selective Demolition 02 41 13 13a Portland Cement Concrete Removal 02 41 16 13 Building Demolition 02 58 13 00 Farm-Type Wire Fencing 02 58 13 00a Snow And Other Temporary Fencing 02 61 00 00 Excavation And Handling Of Contaminated Material 02 61 13 00 Underground Storage Tank Removal 02 61 13 00a Precision Testing Of Underground Fuel Oil Tanks 02 61 13 00b Hydrostatic Pressure Testing Of Air Receiving Tanks 02 81 00 00 Disposal Of Hazardous Materials 02 82 16 00 Encapsulation (Lock-Down) Of Asbestos-Containing Materials 02 82 33 00 Removal Of Friable Asbestos-Containing Materials 02 82 33 00a Removal Of Nonfriable Asbestos-Containing Materials 02 83 19 13 Removal And Disposal Of Lead-Containing Paint 02 83 19 13a Lead Paint Related Abatement Procedures 02 83 19 13b XRF Testing For Lead-Based Paint 02 83 19 13c Lead Dust Wipe, Air And Tclp Sampling And Analysis 02 84 16 00 Removal of Fluorescent Light Ballasts/Capacitors and Fluorescent Light Tubes 02 84 16 00a Interior Lighting 02 84 16 00b Exterior Lighting 02 84 33 00 Overhead Electrical Distribution 02 87 13 33 Mold Remediation 02 87 16 13 Bird And Bird Waste Abatement
03 Concrete
03 01 30 71 Concrete Rehabilitation 03 05 00 00 Cast-In-Place Concrete 03 11 16 00 Rusticated Concrete Finishes 03 11 16 00a Cast-In-Place Architectural Concrete 03 31 13 00 Cement Concrete Pavement 03 31 13 00a Roller Compacted Concrete Pavement 03 31 13 00b Portland Cement Concrete Overlays 03 31 13 00c Steel Reinforced Portland Cement Concrete Overlays 03 31 13 00d Fiber Reinforced Portland Cement Concrete Overlays 03 31 13 00e Miscellaneous Cast-In-Place Concrete 03 35 23 00 Exposed Aggregate Surface Concrete Walls
TOC - 2 Seneca Army Depot
03 37 13 00 Shotcrete 03 37 13 00a Glass Fiber Reinforced Concrete 03 40 00 00 Tilt-Up Precast Concrete 03 41 16 00 Plant-Precast Structural Concrete 03 41 16 00a Precast Lighweight Roof Slabs 03 41 23 00 Architectural Precast Concrete 03 41 26 00 Unbonded Post-Tensioned Concrete 03 51 13 00 Cementitious Wood-Fiber Deck 03 51 16 00 Gypsum Plank Decking 03 51 16 00a Gypsum Concrete Decks 03 53 00 00 Concrete Floor Topping 03 54 16 00 Cement-Based Underlayment
04 Masonry
04 01 20 51 Clay Masonry Restoration And Cleaning 04 01 40 52 Stone Restoration And Cleaning 04 01 40 91 Stone Masonry 04 23 13 00 Glass Unit Masonry Assemblies 04 41 00 00 Dimension Stone Cladding 04 41 00 00a Interior Stone Facing 04 43 16 00 Stone Flooring 04 72 00 00 Cast Stone
05 Metals
05 05 23 00 Structural Steel 05 12 23 00 Cold-Formed Metal Framing 05 14 16 00 Structural Aluminum 05 15 16 00 Ornamental Metal 05 21 19 00 Steel Joists 05 31 00 00 Steel Deck 05 50 00 00 Metal Fabrications 05 51 13 00 Metal Stairs 05 51 13 00a Fabricated Spiral Stairs 05 52 13 00 Pipe And Tube Railings 05 53 13 00 Gratings 05 58 16 00 Ornamental Formed Metal 05 73 00 00 Miscellaneous Ornamental Metals 05 73 00 00a Ornamental Railings
06 Wood, Plastics, and Composites
06 01 20 91 Wood Restoration 06 05 23 00 Timber Bridge Components 06 05 23 00a Miscellaneous Carpentry 06 05 23 00b Heavy Timber Construction 06 05 73 33 Wood Decking 06 10 00 00 Rough Carpentry 06 11 13 00 Rough Carpentry Renovation 06 15 13 00 Exterior Rough Carpentry 06 16 23 00 Sheathing 06 17 13 00 Structural Glued-Laminated Timber 06 17 33 00 Metal-Plate-Connected Wood Trusses 06 22 13 00 Exterior Finish Carpentry 06 22 13 00a Interior Finish Carpentry 06 25 16 00 Paneling 06 41 13 00 Interior Architectural Woodwork 06 41 13 00a Residential Cabinets 06 42 19 00 Plastic Paneling
Seneca Army Depot TOC - 3
06 46 29 00 Exterior Architectural Woodwork 06 48 13 00 Wood Doors 06 51 13 00 Plastic Lumber 06 51 13 00a Composite Plastic Lumber 06 51 13 00b Structural Plastic Lumber 06 74 13 00 Pultruded Fiberglass Industrial Grating 06 82 00 00 Pultruded Fiberglass Structural Shapes
07 Thermal And Moisture Protection
07 01 50 81 Built-Up Coal-Tar Roofing 07 01 50 81a Membrane Reroofing Preparation 07 05 13 00 CSPE Membrane Roofing 07 05 13 00a APP-Modified Bituminous Membrane Roofing 07 05 13 00b SBS-Modified Bituminous Membrane Roofing 07 11 13 00 Bituminous Dampproofing 07 13 13 00 Bituminous Waterproofing 07 13 53 00 Self-Adhering Sheet Waterproofing 07 13 53 00a Elastomeric Sheet Waterproofing 07 14 13 00 Hot Fluid-Applied Rubberized Asphalt Waterproofing 07 14 16 00 Cold Fluid-Applied Waterproofing 07 16 13 00 Modified Cement Waterproofing 07 16 16 00 Crystalline Waterproofing 07 16 19 00 Metal-Oxide Waterproofing 07 17 13 00 Bentonite Waterproofing 07 19 13 00 Water Repellents 07 21 13 13 Building Insulation 07 21 13 13a Modified Bitumous Protected Membrane Roofing 07 22 16 00 Fluid-Applied Protected Membrane Roofing 07 24 13 00 Polymer-Based Exterior Insulation And Finish System (EIFS) 07 24 13 00a Water-Drainage Exterior Insulation and Finish System (EIFS) 07 31 13 00 Asphalt Shingles 07 31 16 00 Metal Shingles 07 31 26 00 Slate Shingles 07 31 29 13 Wood Shingles And Shakes 07 31 33 00 Composite Rubber Shingles 07 32 13 00 Clay Roof Tiles 07 32 16 00 Concrete Roof Tiles 07 41 13 00 Metal Roof Panels 07 41 13 00a Sheet Metal Roofing 07 42 13 19 Glazing 07 46 16 00 Metal Wall Panels 07 46 16 00a Metal Plate Wall Panels 07 46 16 00b Siding 07 46 63 00 Insulated-Core Metal Wall Panels 07 51 13 00 Built-Up Asphalt Roofing 07 53 16 00 EPDM Membrane Roofing 07 54 19 00 Polyvinyl-Chloride (PVC) Roofing 07 54 23 00 Thermoplastic Polyolefin (TPO) Roofing 07 56 00 00 Coated Foamed Roofing 07 62 00 00 Sheet Metal Flashing And Trim 07 63 00 00 Common Work Results for Plumbing 07 71 23 00 Manufactured Roof Specialties 07 72 13 00 Packaged, Outdoor, Central-Station Air-Handling Units 07 72 13 00a Intake and Relief Ventilators 07 72 23 00 Roof Accessories 07 72 56 00 Radiant-Heating Electric Cables 07 72 56 00a Heat Tracing for Fire-Suppression Piping 07 72 56 00b Heat Tracing for Plumbing Piping 07 72 56 00c Heat Tracing for HVAC Piping 07 81 16 00 Sprayed Fire-Resistive Materials 07 82 00 00 Board Fire Protection 07 84 13 16 Through-Penetration Firestop Systems 07 84 13 16a Fire-Resistive Joint Systems 07 84 13 16b Firestopping 07 91 23 00 Joint Sealants 07 95 13 13 Architectural Joint Systems 07 95 13 16 Roof Expansion Assemblies
TOC - 4 Seneca Army Depot
08 Openings
08 01 11 61 Steel Doors And Frames 08 01 11 61a Steel Entry Doors 08 01 52 61 Wood Windows 08 05 13 00 Stainless Steel Doors And Frames 08 05 13 00a Flush Wood Doors 08 11 63 13 Steel Storm Doors 08 11 63 13a Security Window Screens and Doors 08 11 63 23 Aluminum Storm Doors 08 11 73 00 Sliding Metal Fire Doors 08 14 16 00 Stile And Rail Wood Doors 08 16 13 00 Fiberglass Reinforced Plastic (FRP) Doors and Frames 08 31 13 00 Access Doors And Frames 08 32 13 00 Sliding Aluminum-Framed Glass Doors 08 32 19 00 Sliding Wood-Framed Glass Doors 08 33 23 00 Overhead Coiling Doors 08 33 23 00a Overhead Coiling Grilles 08 33 36 00 Side Coiling Grilles 08 34 49 13 Radiation Protection 08 34 53 00 Security Grilles 08 34 56 00 Detention Doors And Frames 08 34 59 00 Security Vault Doors 08 34 59 00a Vault Doors and Day Gates 08 34 59 00b Modular Vaults 08 34 73 16 Sound Control Doors 08 35 13 13 Folding Doors 08 36 13 00 Sectional Overhead Doors 08 36 23 00 Vertical Lift Doors 08 38 13 00 Flexible Doors 08 42 13 00 Aluminum-Framed Entrances And Storefronts 08 42 26 00 All-Glass Entrances And Storefronts 08 42 29 23 ICU/CCU Entrance Doors 08 42 33 00 Revolving Entrance Doors 08 44 13 00 Glazed Aluminum Curtain Walls 08 44 13 00a Structural-Sealant-Glazed Curtain Walls 08 44 13 00b Sloped Glazing Assemblies 08 45 23 00 Unit Skylights 08 45 23 00a Metal-Framed Skylights 08 45 23 00b Structured-Polycarbonate-Panel Assemblies 08 45 23 00c Fiberglass-Sandwich-Panel Assemblies 08 51 13 00 Aluminum Windows 08 51 13 00a Aluminum Replacement Windows 08 51 23 00 Steel Windows 08 51 69 00 Aluminum Storm Windows 08 53 13 00 Vinyl Windows 08 56 19 00 Security Windows 08 62 00 00 Roof Windows 08 71 23 00 Door Hardware 08 71 23 00a Detention Door Hardware 08 75 00 00 Automatic Door Operators 08 83 13 00 Mirrors 08 84 00 00 Plastic Glazing 08 87 23 16 Fragment Retention Film For Glass 08 88 53 00 Security Glazing 08 90 00 00 Louvers And Vents
09 Finishes
09 01 60 91 Portland Cement Terrazzo Flooring 09 01 60 91a Carpet 09 22 13 00 Gypsum Plaster
Seneca Army Depot TOC - 5
09 22 13 00a Gypsum Veneer Plaster 09 22 13 00b Portland Cement Plaster 09 22 16 13 Non-Load-Bearing Steel Framing 09 22 36 23 Lath and Plaster Renovation 09 23 13 00 Gypsum Board Renovation 09 28 13 00 Gypsum Board 09 28 13 00a Gypsum Board Shaft-Wall Assemblies 09 31 00 00 Ceramic Tile 09 51 13 00 Acoustical Panel Ceilings 09 51 23 00 Acoustical Tile Ceilings 09 54 23 00 Acoustical Metal Pan Ceilings 09 54 23 00a Linear Metal Ceilings 09 63 13 00 Brick Flooring 09 64 13 00 Wood Flooring 09 64 23 00 Wood Sports-Floor Assemblies 09 65 13 13 Cork Flooring 09 65 13 13a Resilient Wall Base And Accessories 09 65 13 33 Resilient Floor Tile 09 65 13 33a Resilient Sheet Flooring 09 65 13 33b Linoleum Floor Coverings 09 65 66 00 Fluid-Applied Athletic Flooring 09 65 66 00a Resilient Sports-Floor Coverings 09 66 23 00 Resinous Matrix Terrazzo Flooring 09 67 16 00 Resinous Flooring 09 68 13 00 Carpet Tile 09 69 13 00 Access Flooring 09 69 33 00 Cable Management System 09 72 13 00 Wall Coverings 09 84 13 00 Acoustical Wall Panels 09 91 13 00 Exterior Painting 09 91 13 00a Wood Stains and Transparent Finishes 09 91 13 00b High-Temperature-Resistant Coatings 09 91 23 00 Interior Painting 09 91 23 00a Multicolored Interior Coatings 09 93 23 53 Floor Treatment Refinishing Wood Floors 09 96 00 00 High-Performance Coatings 09 96 46 00 Intumescent Paints 09 96 56 00 Fiberglass Reinforced Epoxy Coating 09 96 66 00 Cementitious Coatings
10 Specialties
10 11 13 13 Visual Display Surfaces 10 13 16 00 Directories 10 14 00 00 Vitrified Brick Pavement Replacement 10 14 53 00 Traffic Signs 10 17 16 13 Telephone Specialties 10 21 13 13 Toilet Compartments 10 21 13 19 Solid Surface Material Toilet Compartments 10 21 16 17 Shower and Dressing Compartments 10 21 16 17a Cubicle Curtains and Tracks 10 22 13 00 Wire Mesh Partitions 10 22 19 13 Demountable Partitions 10 22 43 00 Operable Panel Partitions 10 26 13 00 Impact-Resistant Wall Protection 10 28 13 13 Toilet And Bath Accessories 10 28 13 13a Detention Toilet Accessories 10 28 16 13 Bath Accessories 10 28 19 16 Plumbing Fixtures 10 44 13 00 Fire Protection Cabinets 10 44 16 13 Fire Extinguishers 10 51 13 00 Metal Lockers 10 51 13 00a Wire Basket Lockers 10 51 26 00 Solid Plastic Lockers 10 55 23 23 Postal Specialties 10 56 13 16 Metal Storage Shelving 10 71 13 13 Exterior Shutters 10 73 13 13 Awnings
TOC - 6 Seneca Army Depot
10 73 26 13 Extruded Aluminum Walkway Cover 10 75 16 00 Flagpoles 10 81 13 00 Oriented Flexible Netting Bird Barrier 10 86 00 00 Detention Furniture
11 Equipment
11 11 33 00 Paint Spray Booths 11 12 16 00 Parking Control Equipment 11 12 16 00a Prefabricated Control Booths 11 13 13 00 Loading Dock Equipment 11 14 13 16 Turnstiles 11 21 63 00 Food Service Equipment 11 30 13 13 Residential Appliances 11 30 13 13a Refrigerators 11 30 13 13b Gas Ranges 11 30 13 13c Electric Ranges 11 32 13 00 Unit Kitchens 11 41 33 00 Residential Casework 11 52 13 13 Projection Screens 11 53 13 00 Laboratory Fume Hoods 11 61 23 00 Folding And Portable Stages 11 66 13 00 Playground Equipment And Structures 11 66 13 00a Recreational Facilities 11 66 13 00b Gymnasium Equipment 11 66 53 00 Gymnasium Dividers 11 68 23 13 Playing Fields 11 82 19 00 Packaged Incinerators 11 82 26 00 Waste Compactors 11 98 12 00 Detention Enclosures
12 Furnishings
12 01 60 00 Fixed Audience Seating 12 21 13 13 Horizontal Louver Blinds 12 21 13 13a Vertical Louver Blinds 12 22 13 00 Draperies and Tracks 12 24 13 00 Roller Shades 12 24 13 00a Pleated Shades 12 36 23 13 Stone Countertops 12 36 61 16 Solid Polymer Fabrications 12 48 13 13 Floor Mats And Frames 12 48 13 13a Foot Grilles 12 56 53 00 Laboratory Casework 12 59 13 00 Systems Furniture 12 62 23 00 Portable Bleachers 12 66 13 00 Telescoping Stands
13 Special Construction
13 12 13 00 Water Distribution 13 27 53 16 Floor Safes 13 34 16 13 Fixed Wood Bleachers (Exterior) 13 34 16 13a Demountable Bleachers (Exterior) 13 34 16 13b Grandstands And Bleachers 13 34 19 00 Metal Building Systems 13 42 63 16 Security Ceiling Systems 13 47 13 13 Cathodic Protection
Seneca Army Depot TOC - 7
14 Conveying Equipment
14 01 20 71 Electric Traction Elevators 14 01 20 71a Hydraulic Elevators 14 11 00 00 Dumbwaiters 14 24 13 00 Hydraulic Freight Elevators 14 26 00 00 Limited-Use/Limited-Application Elevators 14 31 00 00 Escalators 14 41 16 00 Personnel Lifts 14 42 13 00 Wheelchair Lifts 14 45 13 00 Vehicle Lifts 14 91 33 00 Chutes
21 Fire Suppression
21 05 00 00 Common Motor Requirements for Fire Suppression Equipment 21 05 13 00 Common Work Results for Fire Suppression 21 05 13 00a Vibration And Seismic Controls For Fire-Suppression Piping And Equipment 21 05 19 00 Fire-Suppression Systems Insulation 21 05 19 00a Meters and Gages for Plumbing Piping 21 05 19 00b Meters and Gages for HVAC Piping 21 11 19 00 Fire-Suppression Standpipes 21 12 29 00 Piped Utilities Basic Materials And Methods 21 13 13 00 Wet-Pipe Fire-Suppression Sprinklers 21 13 16 00 Dry-Pipe Fire-Suppression Sprinklers 21 13 39 00 Foam Fire Extinguishing 21 16 00 00 Pressure-Maintenance Pumps 21 16 00 00a Controllers for Fire-Pump Drivers 21 22 16 00 Clean-Agent Extinguishing Systems 21 24 00 00 Fiberglass Reinforced Polyester (FRP) Flush Doors 21 30 00 00 Electric-Drive, Centrifugal Fire Pumps 21 30 00 00a Diesel-Drive, Centrifugal Fire Pumps 21 31 13 00 Electric-Drive, Vertical-Turbine Fire Pumps 21 31 16 00 Diesel-Drive, Vertical-Turbine Fire Pumps
22 Plumbing
22 01 40 81 Emergency Plumbing Fixtures 22 05 13 00 Common Motor Requirements for Plumbing Equipment 22 05 48 13 Vibration And Seismic Controls For Plumbing Piping And Equipment 22 05 53 00 Identification for Plumbing Piping and Equipment 22 05 76 00 Sanitary Sewerage 22 05 76 00a Storm Drainage Piping Specialties 22 07 19 00 Plumbing Insulation 22 11 16 00 Domestic Water Piping 22 11 16 00a Sanitary Waste And Vent Piping 22 11 16 00b Storm Drainage Piping 22 11 16 00c Hydronic Piping 22 11 16 00d Steam And Condensate Piping 22 11 16 00e Refrigerant Piping 22 11 16 00f General-Service Compressed-Air Piping 22 11 16 00g Compressed-Air Piping For Laboratory And Healthcare Facilities 22 11 16 00h Vacuum Piping For Laboratory And Healthcare Facilities 22 11 16 00i Gas Piping For Laboratory And Healthcare Facilities 22 11 16 00j Chemical-Waste Systems for Laboratory and Healthcare Facilities 22 11 19 00 Electronic Air Cleaners 22 11 23 13 Water Distribution Pumps 22 11 23 13a Packaged Booster Pumps 22 11 23 23 Water Supply Wells 22 11 23 23a Hydronic Pumps 22 12 19 00 Surface Water-Storage Tanks 22 12 19 00a Potable-Water Storage Tanks
TOC - 8 Seneca Army Depot
22 12 23 13 Electric, Domestic Water Heaters 22 12 23 13a Fuel-Fired, Domestic Water Heaters 22 13 19 00 High-Efficiency Particulate Filtration 22 13 19 26 Interceptors 22 13 19 33 General-Duty Valves for Plumbing Piping 22 13 19 33a General-Duty Valves for HVAC Piping 22 13 29 13 Packaged Sewage Pumping Stations 22 13 29 13a Lift Station 22 13 29 13b Sewage Pumps 22 14 29 13 Sump Pumps 22 15 13 00 General-Service Packaged Air Compressors and Receivers 22 31 16 00 Water Softeners 22 35 23 00 Domestic Water Heat Exchangers 22 42 19 00 Porcelain Steel Bathtub Liners and Surrounds 22 43 00 00 Medical Plumbing Fixtures 22 46 13 13 Security Plumbing Fixtures 22 47 13 00 Drinking Fountains And Water Coolers
23 Heating, Ventilating, And Air-Conditioning (HVAC)
23 01 10 91 Sequence Of Operation 23 01 10 91a Testing, Adjusting, And Balancing 23 01 30 51 Air Duct Cleaning 23 05 13 00 Common Work Results for HVAC 23 05 16 00 Expansion Fittings and Loops for Plumbing Piping 23 05 16 00a Expansion Fittings and Loops for HVAC Piping 23 05 29 00 Steam Distribution 23 05 29 00a Hangers and Supports for Plumbing Piping and Equipment 23 05 29 00b Hangers and Supports for HVAC Piping and Equipment 23 05 48 13 Vibration And Seismic Controls For HVAC Piping And Equipment 23 05 53 00 Identification for HVAC Piping and Equipment 23 05 93 00 Processed Water Piping 23 07 13 00 HVAC Insulation 23 09 00 00 HVAC Instrumentation And Controls 23 11 23 00 Relief Wells 23 11 23 00a Monitoring Wells 23 11 23 00b Facility Natural-Gas Piping 23 11 23 00c Facility Liquefied-Petroleum Gas Piping 23 13 23 16 Facility Fuel-Oil Piping 23 21 13 23 Radiant Heating Piping 23 22 23 13 Steam Condensate Pumps 23 25 13 00 HVAC Water Treatment 23 31 13 13 Metal Ducts 23 31 13 13a HVAC Casings 23 31 13 16 Tailpipe Exhaust Equipment 23 31 13 33 Duct Accessories 23 31 16 13 Nonmetal Ducts 23 33 13 13 Draft Control Devices 23 34 13 00 Axial Fans 23 34 16 00 Centrifugal Fans 23 34 16 00a Power Ventilators 23 34 33 00 Air Curtains 23 36 13 00 Diffusers, Registers, And Grilles 23 41 13 00 Particulate Air Filtration 23 42 13 00 Gas-Phase Air Filtration 23 44 00 00 Interlocking Resilient Flooring 23 51 13 13 Breechings, Chimneys, And Stacks 23 52 13 00 Electric Boilers 23 52 23 00 Cast-Iron Boilers 23 52 33 16 Condensing Boilers 23 52 33 16a Water-Tube Boilers 23 52 36 00 Fire-Tube Boilers 23 53 16 00 Feedwater Equipment 23 53 16 00a Deaerators 23 54 16 13 Furnaces 23 55 23 13 Radiant Heating and Cooling Units
Seneca Army Depot TOC - 9
23 55 23 13a Radiant-Heating Electric Panels 23 55 33 00 Fuel-Fired Unit Heaters 23 55 33 00a Unit Heaters 23 57 13 00 Heat Exchangers 23 61 16 00 Centrifugal Water Chillers 23 61 16 00a Rotary-Screw Water Chillers 23 62 13 00 Indirect-Fired Absorption Water Chillers 23 63 13 00 Condensing Units 23 63 13 00a Air-Cooled Condensers 23 63 13 00b Split-System Air-Conditioning Units 23 64 13 16 Direct-Fired Absorption Water Chillers 23 64 16 16 Fan-Coil Units 23 64 23 00 Reciprocating Water Chillers 23 64 23 00a Scroll Water Chillers 23 65 13 00 Cooling Towers 23 72 13 00 Air-To-Air Energy Recovery Units 23 74 16 00 Modular Indoor Central-Station Air-Handling Units 23 74 16 00a Rooftop Replacement Air Units 23 74 16 00b Self-Contained Air-Conditioners 23 74 23 13 Direct-Fired, Makeup Air Units 23 74 23 13a Indirect-Fired, Packaged H&V Units 23 81 13 11 Packaged Terminal Air Conditioners 23 81 23 00 Computer-Room Air-Conditioners 23 82 16 00 Air Coils 23 82 16 00a Unit Ventilators 23 82 29 00 Convection Heating Units 23 84 13 00 Humidifiers 23 84 16 33 Dehumidification Units
26 Electrical
26 05 00 00 Common Work Results for Electrical 26 05 13 00 Conductors And Cables 26 05 13 00a Undercarpet Cables 26 05 13 00b Medium-Voltage Cables 26 05 19 13 Raceways And Boxes 26 05 19 13a Underfloor Raceways For Electrical Systems 26 05 19 16 Common Work Results for Communications 26 05 19 16a Common Work Results for Electronic Safety and Security 26 05 19 16b Control-Voltage Electrical Power Cables 26 05 19 16c Communications Equipment Room Fittings 26 05 19 16d Communications Backbone Cabling 26 05 19 16e Communications Horizontal Cabling 26 05 19 16f Conductors and Cables for Electronic Safety and Security 26 05 19 23 Monorails With Electric Powered Hoists 26 05 19 23a Cranes, Overhead Electric, Underrunning (Under 20,000 Pounds) 26 05 26 00 Lightning Protection 26 05 26 00a Grounding And Bonding 26 05 29 00 Hangers And Supports For Electrical Systems 26 05 29 00a Vibration And Seismic Controls For Electrical Systems 26 05 33 16 Wiring Devices 26 05 36 00 Cable Trays 26 05 53 00 Electrical Identification 26 09 23 00 Lighting Controls 26 09 23 00a Lighting Control Devices 26 09 23 00b Electrical Power Monitoring And Control 26 09 23 00c Motor-Control Centers 26 09 23 00d Central Dimming Controls 26 09 23 00e Modular Dimming Controls 26 11 13 00 Secondary Unit Substations 26 11 16 00 Switchgear 26 12 13 00 Medium-Voltage Transformers 26 12 13 00a Low-Voltage Transformers 26 24 13 00 Electricity Metering 26 24 13 00a Enclosed Switches And Circuit Breakers 26 24 13 00b Switchboards 26 24 19 00 Enclosed Controllers 26 24 19 00a Power Distribution Units
TOC - 10 Seneca Army Depot
26 25 00 00 Enclosed Bus Assemblies 26 28 13 00 Fuses 26 29 23 00 Variable Frequency Controllers 26 31 00 00 Photovoltaic Energy Equipment 26 32 13 13 Packaged Engine Generators 26 33 43 00 Central Battery Inverters 26 33 43 00a Nurse Call 26 33 43 00b Public Address and Mass Notification Systems 26 33 53 00 Static Uninterruptible Power Supply 26 35 33 00 Power Factor Correction Capacitors 26 36 13 00 Transfer Switches 26 43 13 00 Transient Voltage Suppression 26 55 61 00 Stage Lighting 26 55 68 00 Exterior Athletic Lighting
27 Communications
27 05 26 00 Intercommunications and Program Systems 27 11 19 00 Loose-Tube Gel-Filled Fiber Optic Cables 27 51 33 00 Educational Intercommunications and Program Systems 27 53 13 00 Clock And Program Control
28 Electronic Safety And Security
28 16 11 00 Perimeter Security 28 16 11 00a Intrusion Detection 28 16 11 00b Security Access 28 21 00 00 Video Surveillance 28 46 00 00 Oil/Water Separator 28 46 21 33 Digital, Addressable Fire-Alarm System 28 46 21 33a Zoned (DC Loop) Fire-Alarm System
31 Earthwork
31 05 13 00 Earthwork 31 05 13 00a Subdrainage 31 11 00 00 Site Clearing 31 13 13 00 Tree Protection And Trimming 31 23 16 13 Excavation Support And Protection 31 23 16 26 Embankment 31 23 19 00 Dewatering 31 24 13 00 Levee Closure 31 25 14 13 Geosynthetic Fabric 31 25 14 23 Unit Pavers 31 25 14 26 Silt Fences 31 31 16 13 Termite Control 31 31 19 13 Soil Sterilization 31 32 13 16 Soil Stabilization-Lime 31 32 13 19 Soil Stabilization-Vibroflotation 31 32 19 16 Sewage Treatment Lagoons 31 32 19 16a Pond Reservoir Liners 31 36 13 00 Wire Mesh Gabions 31 37 00 00 Riprap 31 41 13 00 Drilled Piers 31 62 13 23 Prestressed Concrete Piles 31 62 16 16 Steel H Piles 31 62 19 00 Timber Piles 31 62 23 13 Concrete-Filled Steel Piles 31 66 15 00 Resistance Pier Systems
Seneca Army Depot TOC - 11
32 Exterior Improvements
32 01 11 53 Asphalt Paving 32 01 11 53a Pavement Joint Sealants 32 01 11 53b Traffic Coatings 32 01 13 62 Crack Sealing Of Bituminous Pavements 32 01 13 62a Spray Applications, Seal Coats, And Surface Treatments 32 01 16 71 Grinding/Grooving Pavement 32 01 16 71a Cold Mix Recycling 32 01 16 74 Bituminous Rejuvenation 32 01 16 74a Central Plant Hot-Mix Recycling 32 11 16 16 Crushed Stone Paving 32 11 16 16a Crushed Stone 32 11 16 16b Select Gravel 32 11 26 19 Asphaltic Concrete Overlays 32 12 13 13 Bituminous Paving-Repair And Resurfacing 32 13 13 33 Decorative Cement Concrete Pavement 32 14 09 00 Exterior Plants 32 14 11 00 Asphalt Concrete Sidewalks 32 14 11 00a Miscellaneous Sidewalks 32 14 11 00b Precast Sidewalks And Pavers 32 14 33 00 Porous Unit Paving 32 16 13 13 Steel Curbs 32 17 23 13 Track, Court, And Playground Markings 32 17 26 00 Tactile/Detectable Warning Tile 32 18 16 13 Playground Surface Systems 32 18 16 13a Synthetic Running Track Surface 32 18 23 13 Lawns And Grasses 32 18 23 29 Colored Athletic Wearing Surface 32 18 23 29a Synthetic Turf 32 31 13 13 Chain-Link Fences And Gates 32 31 13 53 High-Security Chain-Link Fences And Gates 32 31 19 00 Ornamental Metal Fences and Gates 32 31 29 00 Permanent Wood Fencing 32 32 13 00 Segmental Retaining Walls 32 33 13 00 Miscellaneous Site and Street Furnishings 32 33 23 00 Site Furnishings 32 84 13 00 Irrigation Systems 32 91 13 16 Tree Relocation 32 91 19 13 Concrete Revetment 32 91 19 13a Septic Tank Systems
33 Utilities
33 01 10 58 Repair And Maintenance Of Imhoff Tanks 33 01 10 58a Sewer Line Cleaning 33 01 30 42 Repair And Maintenance Of Siphon Tank And Siphons 33 01 30 79 Pipe Lining 33 01 30 81 Underground Ducts And Utility Structures 33 05 07 13 Trenchless Excavation Using Microtunneling 33 11 13 00 Well Repair 33 14 13 23 Sand Drains 33 14 13 23a Hydronic Distribution 33 14 13 23b Ground-Loop Heat-Pump Piping 33 42 11 00 Storm Drainage 33 42 13 13 Culverts
34 Transportation
34 41 13 00 Electrical Traffic Control Signals
TOC - 12 Seneca Army Depot
34 71 13 13 Beam-Type Guardrail 34 71 13 16 Active Vehicle Barriers
35 Waterway and Marine Construction
35 22 26 00 Sluice Gate
41 Material Processing And Handling Equipment
41 22 23 13 Material Handling Hoists 41 22 23 13a Monorails With Air Motor Powered Hoist 41 22 23 13b Monorails With Manual Hoist 41 22 23 23 Ash Hoists
14 - Conveying Equipment
May 2018 Electric Traction Elevators Seneca Army Depot 14 01 20 71 - 1
SECTION 14 01 20 71 - ELECTRIC TRACTION ELEVATORS
1.1 GENERAL
A. Description Of Work
1. This specification covers the furnishing and installation of materials for electric traction elevators.
Products shall be as follows or as directed by the Contracting Officer. Installation procedures shall be in accordance with the product manufacturer’s recommendations. Demolition and removal of materials shall be as required to support the work.
B. Summary
1. This Section includes electric traction passenger and service elevators.
C. Definitions
1. Definitions in ASME A17.1 apply to work of this Section.
2. Defective Elevator Work: Operation or control system failure, including excessive malfunctions;
performances below specified ratings; excessive wear; unusual deterioration or aging of materials or finishes; unsafe conditions; need for excessive maintenance; abnormal noise or vibration; and similar unusual, unexpected, and unsatisfactory conditions.
3. Service Elevator: A passenger elevator that is also used to carry freight.
D. Submittals
1. Product Data: Include capacities, sizes, performances, operations, safety features, finishes, and similar information. Include product data for the following:
a. Car enclosures and hoistway entrances.
b. Operation, control, and signal systems.
2. Shop Drawings: Show plans, elevations, sections, and large-scale details indicating service at each landing, machine room layout, coordination with building structure, relationships with other construction, and locations of equipment and signals. Include large-scale layout of car control station and standby power operation control panel, as directed. Indicate variations from specified requirements, maximum dynamic and static loads imposed on building structure at points of support, and maximum and average power demands.
3. Samples: For exposed finishes of cars, hoistway doors and frames, and signal equipment; 3-inch- (75-mm-) square Samples of sheet materials; and 4-inch (100-mm) lengths of running trim members.
4. Manufacturer Certificates: Signed by elevator manufacturer certifying that hoistway, pit, and machine room layout and dimensions, as shown on Drawings, and electrical service, as shown and specified, are adequate for elevator system being provided.
5. Qualification Data: For Installer.
6. Operation and Maintenance Data: For elevators to include in emergency, operation, and maintenance manuals.
7. Inspection and Acceptance Certificates and Operating Permits: As required by authorities having jurisdiction for normal, unrestricted elevator use.
8. Warranty: Special warranty specified in this Section.
E. Quality Assurance
1. Installer Qualifications: Elevator manufacturer or manufacturer's authorized representative who is trained and approved for installation of units required for this Project.
2. Source Limitations: Obtain elevators, including hydraulic passenger elevators specified in another Division 14 Section, through one source from a single manufacturer.
a. Provide major elevator components, including driving machines, controllers, signal fixtures, door operators, car frames, cabs, and entrances, manufactured by a single manufacturer.
3. Regulatory Requirements: Comply with ASME A17.1 and elevator design requirements for earthquake loads in ASCE 7.
Electric Traction Elevators May 2018
14 01 20 71 - 2 Seneca Army Depot
a. Effective peak velocity acceleration (Av) for Project's location is less than 0.10 (seismic risk zones 0 and 1) OR greater than or equal to 0.10, but less than 0.20 (seismic risk zone 2) OR greater than or equal to 0.20 (seismic risk zones 3 and 4), as directed.
b. Provide earthquake equipment required by ASME A17.1.
c. Design earthquake spectral response acceleration, short period (Sds) for Project is determined by Project's location and site classification.
d. Project's seismic design category is A OR B OR C OR D, as directed.
e. Elevator importance factor is 1.5 OR 1.0, as directed.
4. Accessibility Requirements: Comply with Section 4.10 in the U.S. Architectural & Transportation Barriers Compliance Board's "Americans with Disabilities Act (ADA), Accessibility Guidelines for Buildings and Facilities (ADAAG)" OR 407 in ICC A117.1, as directed.
5. Fire-Rated Hoistway Entrance Assemblies: Door and frame assemblies complying with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire-protection ratings indicated, based on testing at as close to neutral pressure as possible according to NFPA 252 OR IBC Standard 3002.4 OR UL 10B, as directed.
F. Delivery, Storage, And Handling
1. Deliver, store, and handle materials, components, and equipment in manufacturer's protective packaging.
2. Store materials, components, and equipment off of ground, under cover, and in a dry location.
Handle according to manufacturer's written recommendations to prevent damage, deterioration, or soiling.
G. Coordination
1. Coordinate installation of sleeves, block outs, elevator equipment with integral anchors, and other items that are embedded in concrete or masonry for elevator equipment. Furnish templates, sleeves, elevator equipment with integral anchors, and installation instructions and deliver to Project site in time for installation.
2. Coordinate sequence of elevator installation with other work to avoid delaying the Work.
3. Coordinate locations and dimensions of other work relating to electric traction elevators including pit ladders, sumps, and floor drains in pits; entrance subsills; machine beams, as directed; and electrical service, electrical outlets, lights, and switches in pits and machine rooms OR hoistways, as directed.
H. Warranty
1. Special Manufacturer's Warranty: Manufacturer's standard form in which manufacturer agrees to repair, restore, or replace defective elevator work within specified warranty period.
a. Warranty Period: One year from date of Final Completion.
1.2 PRODUCTS
A. Systems And Components
1. General: Provide manufacturer's standard elevator systems. Where components are not otherwise indicated, provide standard components published by manufacturer as included in standard preengineered elevator systems and as required for complete system.
2. Elevator Machines: Provide variable-voltage, variable-frequency, ac-type hoisting machines OR At manufacturer's option, provide either variable-voltage, variable-frequency, ac-type or variable-voltage, dc-type hoisting machines, as directed. Provide solid-state power converters.
a. Provide regenerative OR nonregenerative, as directed, system.
b. Limit total harmonic distortion of regenerated power to 5 percent per IEEE 519.
c. Provide means for absorbing regenerated power when elevator system is operating on standby power.
d. Provide line filters or chokes to prevent electrical peaks or spikes from feeding back into building power system.
Seneca Army Depot 14 01 20 71 - 3
3. Fluid for Oil Buffers: If oil buffers are used, use only fire-resistant hydraulic fluid containing antioxidant, anticorrosive, antifoaming, and metal-passivating additives.
4. Inserts: Furnish required concrete and masonry inserts and similar anchorage devices for installing guide rails, machinery, and other components of elevator work where installation of devices is specified in another Section.
5. Machine Beams: Provide framing to support elevator hoisting machine and deflector sheaves from the building structure. Comply with Division 5 Section "Metal Fabrications" for materials and fabrication.
6. Car Frame and Platform: Welded steel units.
7. Guides: Provide roller guides OR polymer-coated, nonlubricated sliding guides, as directed, at top and bottom of car and counterweight frames.
B. Operation Systems
1. General: Provide manufacturer's standard microprocessor operation system for each elevator
OR for each group of elevators, as directed, as required to provide type of operation system indicated.
2. Group Automatic Operation with Demand-Based Dispatching: Provide reprogrammable, as directed, group automatic system that assigns cars to hall calls based on a dispatching program designed to minimize passenger waiting time. System automatically adjusts to changes in demand for different traffic conditions including heavy incoming, heavy two-way, heavy outgoing, and light off-hours as variations of normal two-way traffic.
3. Destination-Based Group Automatic Operation: Provide reprogrammable group automatic system that assigns elevators leaving the main lobby in the up direction to a selected group of floors and directs passengers to an elevator serving their destination floor. System dispatches cars in a regulated sequence for optimum system efficiency; dispatch is based on origin and destination of calls. System automatically adjusts to changes in demand for different traffic conditions including heavy incoming, heavy two-way, heavy outgoing, and light off-hours as variations of normal two-way traffic.
4. Auxiliary OR Single-Car Auxiliary, as directed, Operations: In addition to primary operation system features, provide the following operational features for elevators where indicated:
a. Standby Power Operation: On activation of standby power, car is returned to a designated floor and parked with doors open. Car can be manually put in service on standby power, either for return operation or for regular operation, by switches in control panel located at main lobby OR fire command station, as directed. Manual operation causes automatic operation to cease.
b. Standby Powered Lowering: On activation of standby power, if car is at a floor, it remains at that floor, opens its doors, and shuts down. If car is between floors, it is lowered to the next floor below, opens its doors, and shuts down.
c. Battery-Powered Lowering: If power fails and car is at a floor, it remains at that floor, opens its doors, and shuts down. If car is between floors, it is lowered to the next floor below, opens its doors, and shuts down. System includes rechargeable battery and automatic recharging system.
d. Automatic Dispatching of Loaded Car: When car load exceeds 80 percent of rated capacity, doors will begin closing.
e. Nuisance Call Cancel: When car calls exceed a preset number while car load is less than a predetermined weight, all car calls are canceled. Preset number of calls and predetermined weight, as directed, can be adjusted.
5. Group Auxiliary Operations: In addition to primary operation system features, provide the following operational features for elevators and elevator groups where indicated:
a. Standby Power Operation: On activation of standby power, cars are returned to a designated floor and parked with doors open. One car is returned at a time, with priority given to loaded cars. If a car cannot be returned after two attempts, it is removed from the system. When all cars have been returned or removed from the system, one car is automatically placed in service. If car selected for service cannot operate within 60 seconds, the system removes car from service and places another car in service. Cars can be manually put in service on standby power, either for return operation or for regular
14 01 20 71 - 4 Seneca Army Depot operation, by switches in control panel located at main lobby OR fire command station, as directed. Manual operation causes automatic operation to cease.
b. Standby Power Operation: On activation of standby power, cars are returned, one at a time, to a designated floor and parked with doors open. If a car cannot be returned, it is removed from the system. When all cars have been returned or removed from the system, one car can be put in service on standby power by a selector switch in control panel located at main lobby OR fire command station, as directed.
c. Battery-Powered Lowering: If power fails, cars that are at a floor remain at that floor, open their doors, and shut down. Cars that are between floors are lowered one at a time to the next floor below, open their doors, and shut down. System includes rechargeable battery and automatic recharging system.
d. Automatic Dispatching of Loaded Car: When car load exceeds 80 percent of rated capacity, doors will begin closing.
e. Nuisance Call Cancel: When car calls exceed a preset number while the car load is less than a predetermined weight, all car calls are canceled. Preset number of calls and predetermined weight, as directed, can be adjusted.
f. Emergency Hospital OR Priority, as directed, Service: Service is initiated by a keyswitch OR card reader OR remote switch, as directed, at designated floors. One elevator is removed from group operation and directed to the floor where service was initiated. On arriving at the floor, elevator opens its doors and parks and a lighted sign directs passengers to exit elevator, as directed. Car is placed in operation by selecting a floor and pressing door close button or by operating keyswitch to put car in independent service.
After responding to floor selected or being removed from independent service, car is returned to group operation. If car is not placed in operation within a preset time after being called, it is returned to group operation.
g. Independent Service: Keyswitch in car control station removes car from group operation and allows it to respond only to car calls. Key cannot be removed from keyswitch when car is in independent service. When in independent service, doors close only in response to door close button.
h. Loaded-Car Bypass: When car load exceeds 80 percent of rated capacity, car will respond only to car calls, not to hall calls.
i. Distributed Parking: When cars are not required for response to calls, they are parked with doors closed, distributed in predetermined zones throughout the building. One zone shall include the main floor and adjacent floors; remaining floors shall be divided into approximately equal zones.
6. Security Features: Provide the following security features, where indicated. Security features shall not affect emergency firefighters' service.
a. Card-Reader Operation: System uses card readers at car control stations OR hall push-button stations, as directed, to authorize calls. Security system determines which landings and at what times calls require authorization by card reader. Provide required conductors in traveling cable and panel in machine room for interconnecting card readers, other security access system equipment, and elevator controllers. Allow space as indicated for card reader in car OR Provide stripe-swipe card reader integral with each car control station, as directed.
1) Security access system equipment is specified in Division 28 Section "Access
Control".
OR
Security access system equipment is not in the Contract.
b. Keyswitch Operation: Push buttons are activated and deactivated by security keyswitches at car control stations OR hall push-button stations, as directed. Key is removable only in deactivated position OR in either position, as directed.
c. Keypad Operation: Allows each landing to be restricted or unrestricted. When a restricted landing button is pressed, a "Restricted Floor" lamp lights and remains lit until landing access code has been entered into a keypad or predetermined time period has elapsed.
Seneca Army Depot 14 01 20 71 - 5
Car calls for restricted landings do not register until landing access code is entered into keypad within predetermined time period after landing button is pressed.
1) Access codes are programmed at each car operating panel using a security keyswitch. Keypad operation can be activated and deactivated by security keyswitch at main landing.
d. Car-to-Lobby Feature: Feature, activated by keyswitch at main lobby, that causes car OR all cars in a group, as directed, to return immediately to lobby and open doors for inspection. On deactivation by keyswitch, calls registered before keyswitch activation are completed and normal operation is resumed.
C. Door Reopening Devices
1. Infrared Array: Provide door reopening devices with uniform array of 36 or more microprocessor-controlled, infrared light beams projecting across car entrance. Interruption of one or more of the light beams shall cause doors to stop and reopen.
2. Nudging Feature: After car doors are prevented from closing for predetermined adjustable time, through activating door reopening device, a loud buzzer shall sound and doors shall begin to close at reduced kinetic energy.
D. Finish Materials
1. General: Provide the following materials for exposed parts of elevator car enclosures, car doors, hoistway entrance doors and frames, and signal equipment as indicated.
2. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, commercial steel, Type B, exposed, matte finish.
3. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, commercial steel, Type B, pickled.
4. Stainless-Steel Sheet: ASTM A 240/A 240M, Type 304.
a. Textured Stainless-Steel Sheet: Product with coined OR embossed, as directed, texture rolled into exposed surface.
1) Metal surface is satin polished OR satin relieved OR titanium nitride colored OR oxide colored OR satin polished and titanium nitride colored OR satin relieved and titanium nitride colored OR satin polished and oxide colored OR satin relieved and oxide colored OR color coated and satin relieved OR color coated and bright relieved, as directed, after rolling.
5. Stainless-Steel Bars: ASTM A 276, Type 304.
6. Stainless-Steel Tubing: ASTM A 554, Grade MT 304.
7. Bronze Plate and Sheet: ASTM B 36/B 36M, Alloy UNS No. C28000 (muntz metal).
8. Bronze Extrusions: ASTM B 455, Alloy UNS No. C38500 (architectural bronze).
9. Bronze Tubing: ASTM B 135 (ASTM B 135M), Alloy UNS No. C23000 (red brass, 85 percent copper).
10. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), Alloy 6063.
11. Nickel Silver Extrusions: ASTM B 151/B 151M, Alloy UNS No. C74500 or No. C77600.
12. Plastic Laminate: High-pressure type complying with NEMA LD 3, Type HGS for flat applications
OR Type HGL for flat applications, as directed, Type HGP for postformed applications and Type BKV for panel backing.
E. Car Enclosures
1. General: Provide enameled-steel car enclosures to receive removable OR steel-framed car enclosures with nonremovable, as directed, wall panels, with car OR removable car, as directed, roof, access doors, power door operators, and ventilation.
a. Provide standard railings complying with ASME A17.1 on car tops where required by
ASME A17.1.
b. Provide finished car including materials and finishes specified below.
2. Materials and Finishes: Provide manufacturer's standards, but not less than the following:
a. Subfloor: Underlayment grade, exterior plywood, 5/8-inch (16-mm) nominal thickness.
b. Floor Finish: Specified in a Division 9 Section OR Elevator manufacturer's standard level-loop nylon carpet; color as selected from manufacturer's full range, as directed.
14 01 20 71 - 6 Seneca Army Depot
c. Enameled-Steel Wall Panels: Flush, hollow-metal construction; fabricated from cold-rolled steel sheet. Provide with factory-applied enamel finish; colors as selected from manufacturer's full range.
d. Stainless-Steel Wall Panels: Flush, hollow-metal construction; fabricated from stainless-steel sheet.
e. Bronze Wall Panels: Flush, hollow-metal construction; fabricated from bronze sheet.
f. Plastic-Laminate Wall Panels: Plastic laminate adhesively applied to 1/2-inch (13-mm) fire-retardant-treated particleboard OR manufacturer's standard honeycomb core, as directed, with plastic-laminate panel backing and, as directed, manufacturer's standard protective edge trim. Panels have a flame-spread index of 25 OR 75, as directed, or less, when tested according to ASTM E 84. Plastic-laminate color, texture, and pattern as selected from plastic-laminate OR elevator, as directed, manufacturer's full range.
g. Fabricate car with recesses and cutouts for signal equipment.
h. Fabricate car door frame integrally with front wall of car.
i. Enameled-Steel Doors: Flush, hollow-metal construction; fabricated from cold-rolled steel sheet. Provide with factory-applied enamel finish; colors as selected from manufacturer's full range.
j. Stainless-Steel Doors: Flush, hollow-metal construction; fabricated from stainless-steel sheet OR by laminating stainless-steel sheet to exposed faces and edges of enameled cold-rolled steel doors using adhesive that fully bonds metal to metal without telegraphing or oil-canning, as directed.
k. Bronze Doors: Flush, hollow-metal construction; fabricated by laminating bronze sheet to exposed faces and edges of enameled cold-rolled steel doors using adhesive that fully bonds metal to metal without telegraphing or oil-canning.
l. Plastic-Laminate Doors: Flush, hollow-metal construction; fabricated by laminating plastic laminate to exposed faces of enameled cold-rolled steel doors and covering edges with protective edge trim matching return panels, as directed. Plastic-laminate color, texture, and pattern as selected from plastic-laminate OR elevator, as directed, manufacturer's full range.
m. Sight Guards: Provide sight guards on car doors.
n. Sills: Extruded metal, with grooved surface, 1/4 inch (6.4 mm) thick.
o. Luminous Ceiling: Fluorescent light fixtures and ceiling panels of translucent acrylic or other permanent rigid plastic.
p. Metal OR Metallic-Finish, Plastic-Laminate, as directed, Ceiling: Flush panels, with incandescent downlights in the center of OR four low-voltage downlights in, as directed, each panel. Align ceiling panel joints with joints between wall panels, as directed.
q. Handrails: Manufacturer's standard handrails, of shape, metal, and finish indicated.
F. Hoistway Entrances
1. General: Provide manufacturer's standard horizontal-sliding, door-and-frame hoistway entrances complete with track systems, hardware, sills, and accessories. Provide frame size and profile to coordinate with hoistway wall construction.
a. Where gypsum board wall construction is indicated, provide self-supporting frames with reinforced head sections.
2. Materials and Fabrication: Provide manufacturer's standards, but not less than the following:
a. Enameled-Steel Frames: Formed from cold-rolled or hot-rolled steel sheet. Provide with factory-applied enamel finish; colors as selected from manufacturer's full range.
b. Steel Subframes: Formed from cold-rolled or hot-rolled steel sheet with factory-applied enamel finish or corrosion-inhibiting primer. Fabricate to receive applied finish as indicated.
c. Stainless-Steel Frames: Formed from stainless-steel sheet.
d. Bronze Frames: Formed from cold-rolled or hot-rolled steel sheet, with enamel finish, and with formed-bronze sheet laminated to steel frames using adhesive that fully bonds metal to metal without telegraphing or oil-canning.
Seneca Army Depot 14 01 20 71 - 7
e. Enameled-Steel Doors and Transoms: Flush, hollow-metal construction; fabricated from cold-rolled steel sheet. Provide with factory-applied enamel finish; colors as selected from manufacturer's full range.
f. Stainless-Steel Doors and Transoms: Flush, hollow-metal construction; fabricated from stainless-steel sheet OR by laminating stainless-steel sheet to exposed faces and edges of enameled cold-rolled steel doors using adhesive that fully bonds metal to metal without telegraphing or oil-canning, as directed.
g. Bronze Doors and Transoms: Flush, hollow-metal construction; fabricated by laminating bronze sheet to exposed faces and edges of enameled cold-rolled steel doors using adhesive that fully bonds metal to metal without telegraphing or oil-canning.
h. Plastic-Laminate Doors and Transoms: Flush, hollow-metal construction; fabricated by laminating plastic laminate to exposed faces of enameled cold-rolled steel doors and covering edges with protective edge trim matching door frames, as directed. Plastic-laminate color, texture, and pattern as selected from plastic-laminate OR elevator, as directed, manufacturer's full range.
i. Sight Guards: Provide sight guards on doors matching door edges.
j. Sills: Extruded metal, with grooved surface, 1/4 inch (6.4 mm) thick.
k. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C 1107.
G. Signal Equipment
1. General: Provide hall-call and car-call buttons that light when activated and remain lit until call has been fulfilled. Fabricate lighted elements with long-life incandescent lamps and acrylic or other permanent, nonyellowing translucent plastic diffusers OR LEDs, as directed.
OR
General: Provide signal equipment designed for destination-based system.
This is the start of the file's text. The full file is on GovTribe.