AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise the Bid Schedule
2. Revise the 00 73 00 section
3. Add Plan
4. Add Specs Please see the continuation page for further details.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 53
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS19B0004
X 9B. DATED (SEE ITEM 11)
03-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS19B0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CHANGES
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
FOB: Destination
NET AMT
0002 474,235 Cubic
Yard
Basic Work-Dredging Area 1
Dredging (to -40 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 3 and 4 of 6 of the contract drawings). Removal of material (474,235 CY) except ledge rock lying above the plane of 40 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Main & Pt. Newark Channels) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s).
(Estimated Quantities)
0003 112,190 Cubic
Yard
OPTION Option-Dredging Area 2
Dredging (to -40 feet MLLW + 1 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 4 through 6 of 6 of the contract drawings). Removal of material (112,190 CY) except ledge rock lying above the plane of 40 feet below mean lower low water (MLLW), plus 1 foot allowable overdepth from Newark Bay, NJ, Federal Navigation Project (Pt.
Newark Channel) with placement of the dredged material at a contractor furnished, state permitted, Government approved upland placement site(s). (Estimated Quantities)
0004 1 Job Black Box Monitoring Unit
FFP
See specifications section 35 20 29
TOTALS/NOTES
TOTAL BASE BID (CLINs 0001, 0002 &0004)…………..………………...……….. $ ___________________
TOTAL OPTIONAL BID (CLIN 0003)…………..………………...………………… $ ___________________
TOTAL BASE BID PLUS OPTIONAL BID (CLINs 0001 through 0004)…………… $ ___________________
NOTES TO BIDDERS:
NOTE 1: Bidders must bid on all items. Failure to bid on all work will be cause for rejection of the bid as nonresponsive.
NOTE 2: Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINs 0001 through 0004.
NOTE 3: The unit prices for CLINs 0002 and 0003 are directly related to the estimated quantities of dredged material available for removal (all material except ledge rock lying above the plane of -40 feet mean lower low water (MLLW), plus 1 foot allowable overdepth), in the contract Dredging Area 1, and contract Dredging Area 2 of Newark Bay, respectively. The dredged material from CLINs 0002 and 0003, must subsequently be transported, processed and placed at a contractor furnished, state permitted, Government approved upland placement site(s).
NOTE 4: All bidders are hereby advised that the estimated dredge quantities for placement in the price schedule are estimated and based on the survey data collected on 29, 30 November, and 01, 03, 04, 07 December 2018.
NOTE 5: The Government may reject a bid as non–responsive if the prices bid are materially unbalanced between line items and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low bid.
NOTE 6: Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself may render the proposal non-responsive and may be cause for its rejection.
NOTE 7: The apparent low bidder shall submit the documents specified in Section 00 73 00, Special Contract Requirements paragraph 1.3, Contractor-Identified Offloading, Processing and Disposal Site Compliance. If the apparent low bidder does not submit the required information within 35 calendar days from the date the apparent low bidder is notified of being the low bidder, the bidder may be considered non-responsible and his bid will no longer be considered. Information provided by the apparent low bidder regarding the 35 day submittal will be the final version. If the apparent low bidder requests to make changes to the 35 day submittal they can only be made with approval from the Government.
NOTE 8: It is the contractor’s responsibility to comply with all conditions and requirements of the contractor furnished placement site(s).
NOTE 9: Any options may be exercised, at the Government's discretion, within one-hundred and seventy-seven
(177) Calendar days of receipt by the Contractor of the Notice to Proceed (Basic Work), if they are exercised at all.
If exercised, the options listed above may not be exercised in numerical order. If options are exercised, their performance periods will be consecutive to that of the Basic Work. If exercised, the time for contract completion of each option will be based on the rate of one (1) additional calendar day for each 2,500 cubic yards in the option.
The following have been added by full text:
CONTINUATION PAGE
PROJECT DRAWINGS:
The following items have been added to “W912DS-19-B-0004 Plans”:
1) Sheet 2 of 6, added to legend “Basic Work - Dredging Area 1 ” & “Option - Dredging Area 2”
2) Sheet 3 of 6, added to the legend “Basic Work - Dredging Area 1”
3) Sheet 4 of 6, added to legend “Basic Work - Dredging Area 1” & “Option - Dredging Area 2”
4) Sheet 5 of 6, added to legend “Option - Dredging Area 2”
5) Sheet 6 of 6, added to legend “Option - Dredging Area 2”
SPECIFICATIONS:
W912DS-19-B-0004, the following items have been added to Specification:
1) Section 00 73 00 Special Contract Requirement - SECTION 1.2 will change the BID SCHEDULE Table to “Basic Work - Dredging Area 1” and “Option - Dredging Area 2”.
2) Section 00 73 00 Special Contract Requirement - SECTION 1.2 will add the following “Any options may be exercised, at the Government's discretion, within one-hundred and seventy-seven (177) calendar days of receipt by the Contractor of the Notice to Proceed (Basic Work), if they are exercised at all. If exercised, the options listed above may not be exercised in numerical order. If options are exercised, their performance periods will be consecutive to that of the Basic Work. If exercised, the time for contract completion of each option will be based on the rate of one (1) additional calendar day for each 2,500 cubic yards in the option.”
3) Section 00 73 00 Special Contract Requirement - SECTION 1.2 will change description to “Basic Work - Dredging Area 1” and “Option - Dredging Area 2”.
4) Section 00 73 00 Special Contract Requirement - SECTION 1.7 (e) will change drawing index to “Basic Work - Dredging Area 1” and “Option - Dredging Area 2”.
5) Section 00 73 00 Special Contract Requirement - SECTION 1.12 will change Distribution of Volumes Table to “Basic Work - Dredging Area 1” and “Option - Dredging Area 2”.
W912DS-19-B-0004_TECH_SPECS, the following items have been added to the Technical Specification:
1) Section 00 01 15 List of Drawings - SECTION 1.2 will change Contract Drawing Table to “Basic Work - Dredging Area 1” and “Option - Dredging Area 2”.
2) Section 00 90 01 Attachment A Vicinity Map - will change Map Legend to “Basic Work - Dredging Area 1” and “Option - Dredging Area 2”.