Maintenance Dredging of New York and New Jersey Channels - Ward Point Bend, NY&NJ Federal Navigation Project
Solicitation number
W912DS-18-B-0010
Issued by

About this file

W912DS-18-B-0010_Technical Specs

View the file

Other files

File Type Posted
W912DS18B0010_Abstract.pdf PDF
Amendment_0001_NYSDEC_Permit.pdf PDF
Amendment_0001.pdf PDF
W912DS-18-B-0010_Contract_Plans.pdf PDF
W912DS-18-B-0010_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New York District

THIS IS AN UNRESTRICTED PROCUREMENT AISC CODE 237990

SAFETY PAYS

MAINTENANCE DREDGING

NEW YORK AND NEW JERSEY CHANNELS –

WARD POINT BEND,

NEW YORK & NEW JERSEY

FEDERAL NAVIGATION PROJECT

Solicitation &

Specifications

IFB No. W912DS18B0010

MAINTENANCE DREDGING

NEW YORK AND NEW JERSEY CHANNELS – WARD POINT BEND, NEW YORK &

NEW JERSEY, FEDERAL NAVIGATION PROJECT

W912DS18B0010

TABLE OF CONTENTS

SECTION NUMBER TITLE

CHECKLIST FOR BIDDERS

INSTRUCTIONS FOR BIDDERS

00 01 15 LIST OF DRAWINGS

00 10 00 SOLICITATION, OFFER AND AWARD FORM

00 21 16 INSTRUCTIONS, CONDITIONS AND NOTICE TO OFFEROR

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONTRACT CONDITIONS

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 90 00 WAGE RATES

00 90 01 LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

00 90 02 WATER QUALITY CERTIFICATE

01 11 00 SUMMARY OF WORK

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 CONSTRUCTION QUALITY CONTROL

01 45 00.10 10 CONSTRUCTION QUALITY CONTROL SYSTEM (QCS)

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 58 00 PROJECT IDENTIFICATION

35 20 23 DREDGING

35 20 29 DREDGED MATERIAL TRANSPORT AND PLACEMENT MONITORING

US ARMY ENGINEER DISTRICT, NEW YORK

INVITATION FOR BID

CHECK LIST FOR BIDDERS

ATTACHED IS IFB FOR:

Maintenance Dredging, New York and New Jersey Channels – Ward Point Bend, New York & New Jersey, Federal Navigation Project

ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION

MUST BE FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR BID

INELIGIBLE FOR AWARD. IMPORTANT ITEMS FOR YOU TO CHECK ARE

INCLUDED IN BUT NOT LIMITED TO THOSE LISTED BELOW. THIS

INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN SUBMITTING A

PROPER BID.

__ HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?

__ HAVE YOU COMPLETED THE “REPRESENTATIONS AND

CERTIFICATIONS” (SECTION 00 45 00) PORTION OF THE SOLICITATION?

__ IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?

__ IS YOUR BID PROPERLY SIGNED?

__ A BID BOND IS REQUIRED. HAS YOUR SURETY PROVIDED YOU WITH A

BID BOND ON STANDARD FORM 24 OR A SIMILAR FORM CONTAINING

THE SAME LANGUAGE AS A STANDARD FORM 24?

__ IS YOUR BID GUARANTEE IN THE PROPER AMOUNT?

__ IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER

AND SURETY AND ARE ALL REQUIRED SEALS AFFIXED?

__ IS THE NAME IN WHICH YOU SUBMITTED THE BID THE SAME ON YOUR

BID AS ON THE BID BOND?

__ IS YOUR BID BOND INCLUDED WITH YOUR BID? (A LATE BID

GUARANTEE IS TREATED THE SAME AS A LATE BID)

__ HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR BID BY

ALTERING THE PROVISIONS OF THE SOLICITATION?

__ WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH BID

ITEM? (THE SOLICITATION SPECIFICALLY STATES WHEN THIS IS

NECESSARY.)

__ ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR

FIGURES LEGIBLE?

__ IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE

THEY INITIALED BY THE PERSON SIGNING THE BID?

__ DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY

THAT IT IS A SEALED BID AND DOES IT CONTAIN THE CORRECT

SOLICITATION NUMBER AND BID OPENING TIME?

__ WILL YOUR BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED “LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS” IN THE

INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21

16 OF THE SOLICITATION.)

NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K. JAVITS

FEDERAL BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE TIME IT

TAKES TO ENTER THE BUILDING. BIDDER IS RESPONSIBLE TO ENSURE

THAT ITS BID IS SUBMITTED TIMELY.

BIDDER IS RESPOSIBLE TO ENSURE BID IS SUBMITTED ON TIME.

COVER SHEET

INVITATION FOR BID

NEW YORK DISTRICT

CORPS OF ENGINEERS

NEW YORK, NEW YORK 10278-0090

INVITATION FOR BIDS

FOR

MAINTENANCE DREDGING

NEW YORK AND NEW JERSEY CHANNELS, WARD POINT BEND

NEW YORK & NEW JERSEY

FEDERAL NAVIGATION PROJECT

1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS18B0010.

2. BIDS MUST SET FORTH full, accurate, and complete information as requested by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed in Title 18, United States Code, Section 1001.

3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).

4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL

OPPORTUNITY clause as it applies to the contract resulting from this solicitation.

(See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 72 00 of this

IFB.)

5. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS

SOLICITATION. Bidders, Offerors, and applicants are cautioned to note the “Certification of Nonsegregated Facilities” in the solicitation. Failure of bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitation involving awards of contracts exceeding $10,000, which are not exempt from the provisions of Equal Opportunity Clause. (1984 APR)

6. REPRESENTATIONS AND CERTIFICATIONS- SECTION 00 45 00

Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.

7. THIS IS A CIVIL WORKS PROGRAM PROCUREMENT AND IS NOT FUNDED

BY THE DEPARTMENT OF DEFENSE. BUY AMERICAN ACT –

CONSTRUCTION MATERIALS (MAY 1993) IN ACCORDANCE WITH FAR

52.225-9 APPLIES.

8. THIS PROJECT IS NOT A SMALL BUSINESS SET-ASIDE.

SECTION 00 10 00 Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

ITEM No. Mobilization and Demobilization 1.00 Job __________.__ __________.__

ITEM No.

0002 Dredging Area 1

Dredging (to -35 feet MLLW + 2 foot allowable overdepth), Dewatering, Offloading, Processing, Transportation and Placement (Sheets 3 and 4 of 4 of the contract drawings).

182,300 CY __________. __ __________.__

Removal of material (182,300 CY) except ledge rock lying above the plane of 35 feet below mean lower low water (MLLW), plus 2 foot allowable overdepth from New York and New Jersey Channels, NY & NJ, Federal Navigation Project (Ward Point Bend) with placement of the dredged material at the Historic Area Remediation Site

(HARS).

ITEM No.

0003 Black Box Monitoring Unit

See specifications section 35 20 29 1.00 Job __________.____________.__

TOTAL BID (CLIN 0001 THRU 0003)…………..………………...……….. $ ___________________

NOTES TO BIDDERS:

NOTE 1: Bidders must bid on all items. Failure to bid on all work will be cause for rejection of the bid as nonresponsive.

NOTE 2: Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINs 0001-0003.

NOTE 3: The unit prices for CLIN 0002 is directly related to the estimated quantities of dredged material available for removal (all material except ledge rock lying above the plane of -35 feet mean lower low water (MLLW), plus 2 foot allowable overdepth). The dredged material from CLINs 0002, must subsequently be transported, processed and placed at the Historic Area Remediation Site (HARS).

NOTE 4: All bidders are hereby advised that the estimated dredge quantities for placement in the price schedule are estimated and based on the survey data collected on 05-06 February 2018.

NOTE 5: The Government may reject a bid as non–responsive if the prices bid are materially unbalanced between line items and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low bid.

NOTE 6: Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself may render the proposal non-responsive and may be cause for its rejection.

Maintenance Dredging of NY & NJ Channels - Ward Point Bend

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 15

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

Section 00 01 15 Page 1

SECTION 00 01 15

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

DRAWING NO. TITLE

Sheet 1 Index

Sheet 2 Location Map, Dredging Map, Typical Cross Section

Sheet 3 Dredging Area, Channel Coordinates

Sheet 4 Dredging Area, Channel Coordinates

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

Section 00 01 15 Page 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 73 00

SPECIAL CONTRACT RQMTS

PART 1 GENERAL

1.1 SUBMITTALS

1.2 COMMENCEMENT, PROSECUTION, & COMPLETION OF WORK

1.3 Not Applicable

1.4 PERFORMANCE OF WORK BY THE CONTRACTOR

1.5 SUBMITTAL OF WORK TO BE PERFORMED BY THE CONTRACTOR

1.6 LIQUIDATED DAMAGES-CONSTRUCTION

1.7 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS

1.8 [Enter Appropriate Subpart Title Here]

1.8 PHYSICAL CONDITIONS

Section 00 73 00 Page 1

SECTION 00 73 00

SPECIAL CONTRACT RQMTS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Order of work;

Accident prevention plan; G Quality control plan; G Letter appointing superintendent;

List of subcontractors;

Environmental protection plan; G Progress schedule; G Submittal register;

Work plan;

1.2 COMMENCEMENT, PROSECUTION, & COMPLETION OF WORK

The Contractor will be required to commence work under this contract within five (5) calendar days after the date of receipt by him of the notice to proceed, to prosecute said work diligently and to complete the Basic Work in the number of calendar days after the date of receipt by him of the notice to proceed, as summarized in the table below.

BID SCHEDULE TOTAL ESTIMATED

QUANTITY (CY)

CONTRACT TIME FOR COMPLETION

(Calendar Days)

Basic Work - Dredging, Transportation and

Placement

182,300 35

Should the total quantity of material exceed the estimated quantities within the Solicitation Contract Form, additional time will be allowed at the rate of one (1) calendar day for each 8,000 cubic yards in excess of the established limit. The time stated for completion shall include final clean up.

The entire work (Mob/Demob and Basic Work) is estimated to cost approximately $1,000,000.00 to $5,000,000.00.

The work is anticipated to be performed within the approximate time period of August 2018 to January 2019.

Based on the plans and specifications survey performed on 05 & 06 February

Section 00 73 00 Page 2

2018, the maximum quantity available to be dredged and transported to the HARS is 182,300 CY from the contract areas in New York and New Jersey Channels, Ward Point Bend, NY & NJ. For a detailed breakdown of quantity available to be dredged, see paragraph 1.12 "ESTIMATED QUANTITIES" in this Section of the Specifications.

Scow monitoring is required for this project. The contractor is required to comply with Section 35 20 23.10 18 entitled "DREDGED MATERIAL TRANSPORT, PLACEMENT AND MONITORING" of these specifications.

Sampling and testing has been conducted by the Government and the test results are included in the specifications in Section 00 90 01 as Attachment J.

The current New York State Department of Environmental Conservation (NYSDEC) Water Quality Certificate (WQC) and the New Jersey Department of Environmental Protection (NJDEP) WQC, for the maintenance dredging of New York and New Jersey Channels, Ward Point Bend, NY Federal Navigation Project are included in Section 00 90 02. The contractor must comply with all conditions of the NYSDEC WQC, and its amendments.

The Apparent Low Bidder is required to obtain Environmental Clearance on all quantity as per the Supply/Services (Price) Schedule.

1.3 Not Applicable

1.4 PERFORMANCE OF WORK BY THE CONTRACTOR

The Contractor shall perform on the site, and with its own organization and equipment, work equivalent to at least forty (40) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performance of the work, the Contractor requests a reduction and the Contracting Officer and/or his Representative determines that the reduction would be to the advantage of the Government. (FAR 52.236-01)

1.5 SUBMITTAL OF WORK TO BE PERFORMED BY THE CONTRACTOR

The Contractor shall furnish the Contracting Officer and/or his Representative, within five (5) days after award, items of work he will perform with his own forces and the estimated cost of those items. The percentage of work that must be performed by the Contractor is stated in paragraph 1.4, entitled: "PERFORMANCE OF WORK BY THE CONTRACTOR."

1.6 LIQUIDATED DAMAGES-CONSTRUCTION

a. If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,770.00 for each calendar day of delay until the work is completed or accepted.

b. If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

1.7 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS

a. The Government will provide to the Contractor, without charge, one

Section 00 73 00 Page 3 set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

b. The Contractor shall:

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

c. In general:

(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are available in the office of the District Engineer, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, New York, N.Y.

10278-0090:

Maintenance Dredging of New York and New Jersey Channels, Ward Point Bend, NY &

NJ

Federal Navigation Project

SHEET NO. DESCRIPTION

1 Index

2 Location Map, Dredging Map, Typical Cross Section

Section 00 73 00 Page 4

Maintenance Dredging of New York and New Jersey Channels, Ward Point Bend, NY &

NJ

Federal Navigation Project

3 Dredging Area, Channel Coordinates

4 Dredging Area, Channel Coordinates

f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements unless dimensions are specified. Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl. 52.236-7002).

1.8 [Enter Appropriate Subpart Title Here] 1.8 PHYSICAL CONDITIONS

The information and data furnished or referred to below are not intended as representations or warranties but are furnished for information only.

It is expressly understood that the Government will not be responsible for the accuracy thereof or for any deduction, interpretation or conclusion drawn by the Contractor.

a. WEATHER CONDITIONS. The site of the work is not exposed to severe wind and wave action and the Contractor's operations are not likely to be affected by ordinary storms. Real-time data are available on the World Wide Web at http://www.ndbc.noaa.gov/index.shtml .

(1) Fog. An examination of the records of the U.S. Weather Bureau at John F. Kennedy International Airport, New York, discloses an average of 31 days per year on which dense fog (visibility of 1/4 mile or less) occurs in the New York Harbor area. The maximum number of days in which dense fog occurred in any month was 4 days in June.

(2) Winds and Waves. Wind and wave climate in the New York Lower Bay, based upon hourly data obtained from NOAA's National Buoy Center (NDBC) observation at Station SDHN4 - Sandy Hook, NJ (8531680) is provided below.

MONTH AVE WIND SPEED (MPH) PEAK WIND GUST (MPH)

JAN 12.1 52.8

FEB 12.3 53.5

MAR 11.3 60.6

APR 10.1 48.3

Section 00 73 00 Page 5

MAY 8.9 49.0

JUN 8.3 42.2

JUL 8.1 55.7

AUG 8.2 57.5

SEP 9.1 108.5

OCT 10.7 149.7

NOV 10.5 52.6

DEC 12.7 96.4

(3) Weather conditions exceeding in severity the fog conditions described above or average wind speeds exceeding 25 mph, or wave heights exceeding 3 feet will be considered unusually severe if delays are caused thereby to operations for more than 50% of the day under this contract.

(4) ICE. Icing within the project vicinity during the contract period is not anticipated. However, in the event that icing does occur, this will be considered to be unusually severe weather if delays are caused thereby to operations for more than 50% of the day under this contract.

(5) TIDES The mean range of tide at Keyport, Raritan Bay, New Jersey is 5.05 feet MLLW and the mean range of spring tides is

6.06 feet MLLW. Irregular fluctuations due to wind and atmospheric pressure have varied from 12.60 feet above MLLW and -2.20 below MLLW for the dredging area.

b. CHANNEL TRAFFIC AND TRANSPORTATION FACILITIES. New York and New Jersey Channels, Ward Point Bend: Based on a plans and specifications survey performed on 5 & 6 February 2018, a controlling depth of approximately -31.6 feet MLLW is present at the site of the work.

Channel use is heavy and consists of deep draft ocean-going commodity, container, and petroleum freighters, medium draft interharbor bulk and general cargo barges, fuel barges, sewage carrier barges, and miscellaneous small craft vessels. Vessel traffic may cause some delay to the dredging required in these specifications. Railroads and first class highways serve the locality / project vicinity.

c. BRIDGE AND UTILITY CROSSINGS.

UTILITY CROSSINGS:

A search of the regulatory files within New York District, Corps of Engineers disclosed the following structures crossing the New York and New Jersey Channels - Ward Point Bend, NY & NJ Channel in the vicinity of the area to be dredged:

ITEM NO. PERMIT NO. DESCRIPTION

Section 00 73 00 Page 6

1 2002-00134 16 February 2005: A high-voltage direct-current submarine transmission cable roughly 4 to 6 feet below the seabed in Raritan Bay, south of Ward Point bend. The Department of the Army permit No.

2002-00134 dated 16 February 2005 issued to Neptune Regional Transmission System, LLC.

2 7509

29 June 1967: A cathodic protected siubmarine cable in Raritan Bay. The Department of the Army permit No. 7509 dated 29 June 1967 & permit No.

7595 dated 20 December 1967 issued to the Transcontinental Gas Pipe Line Corporation.

3 5 March 1968: A submarine cable crossing from the foot of Smith Street, Perth Amboy, Middlesex County, N.J., to Tottenville, Staten Island, Richmond County, N.Y. New Jersey Telephone Company.

Section 00 73 00 Page 7

4 8875 28 June 1974: Install two power cables and one hose on the existing river bottom; under Arthur Kill, at the Outerbridge Crossing, Staten Island, N.Y., in accordance with the plans and drawings attached hereto and marked 1522-15 (Arthur Kill - Interstate Sanitation Commission -submarine cables and hose @ Outerbridge Crossing).

Permit issued to:

Interstate Sanitation Commission, 10 Columbus Circle, Room 1620, New York, New York 10019.

5 238/28 August 1928: Two 3-1/2" submarine telephone cables on the nature bottom crossing the Arthur Kill between the foot of Commerce Street in Perth Amboy, NJ and a point about 300' north of the foot of Amboy Avenue in Tottenville, Staten Island, NY. The NJ Bell Telephone, 1060 Broad Street, Newark, NJ.

6 Nation Wide General Permit No. 12

22 April 1999: Install fiber optic cable crossing the Arthur Kill between Fayette Street, Perth Amboy, NJ and Amboy Road, Staten Island, NY at depth of 80' below MLW. Bell Atlantic-NJ, c/o Federic R. Harris, Inc., 485B Route 1 South, Iselin, NJ 08830.

Section 00 73 00 Page 8

7 18 September 1964: To lay a 3" telephone cable crossing Arthur Kill on natural bottom between Smith Street, Perth Amboy, NJ and Amboy Avenue, S.I., NY. NJ Bell Telephone Co., 540 Broad Street, Newark, NJ.

8 260/13 14 September 1925:

Install a 26,000 volt submarine cable crossing Arthur Kill between Perth Amboy, NJ and Tottenville, SI, NY.

Public Service Production Co., Newark, NJ.

9 3816/5 1940: Install 2 submarine cables at a trench at a minimum depth of 42' in Arthur Kill between Bentley Ave, Tottenville, SI and Buckingham Ave, Perth Amboy, NJ.

10 849 18 September 1927: Lay two power submarine cables in Arthur kill between Buckingham Ave Perth Amboy NJ and N of Ferry Slip @ SI Rapid Transit, Tottenville SI,

- Public Service Production Co. Both cables removed in 1945.

11 760 29 April 1924: Lay two telephone cables in Arthur kill on the nature bottom, between foot of Commerce Street, Perth Amboy NJ and Foot of Amboy Ave, SI, NY.

The Contractor shall take all necessary precautions to prevent damage to these structures. The Contractor is required to coordinate with the owners, if such action is necessary, to mark the structures or move the cables in order to avoid interference with dredging operations. Copies of all permits are available upon request. Please allow sufficient lead time.

Section 00 73 00 Page 9

BRIDGES:

New York and New Jersey Channels, Ward Point Bend: The Outerbridge Crossing, near the north end of Ward Point is a fixed medium level span between Perth Amboy, NJ and Staten island, NY. Vertical clearance is 143 feet above MHW.

The contractor shall exercise the utmost caution when dredging in the vicinity of any bridge, pier, abutment, or bulkhead to prevent the collapse, undermining or damage to these structures. In no case shall the contractor moor any plant to or tie any line, cable, chain or anchor line around any part of a bridge structure, pier, abutment or bulkhead connected therewith.

d. Vessel traffic in Ward Point Bend is heavy. Traffic consists of coastal bulk and general cargo freighters, tankers, tows and scows and barges, and miscellaneous small craft. Vessel traffic may cause some delay to the dredging required in these specifications.

e. OBSTRUCTION OF CHANNEL. The Government will not undertake to keep the area free from vessels or other obstructions except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army in accordance with the provisions of section 7 of the Rivers and Harbors Act in such manner as to obstruct navigation as little as possible, and in case the contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage.

Upon the completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles and other marks placed by him under the contract in navigable waters or on shore.

f. NAVIGATION AIDS. The Contractor shall not relocate or move any aids to navigation that have been established by the U.S. Coast Guard. If it becomes necessary to have any aids to navigation moved in order to complete dredging operations under this contract, the Contractor shall notify the appropriate Coast Guard Office, with a copy to the Contracting Officer and/or his Representative, not less than 30 days prior to the need for movement. The Contractor shall notify the appropriate Coast Guard Office of the approximate time of completion of dredging.

g. LOCATION. The site of the work to be performed under these specifications is as follows:

1) The Ward Point Bend of the New York and New Jersey Channels Federal Navigation Project is bounded on the northeast by Staten Island, NY and on the west by Perth Amboy, NJ.

h. LAYING OF SUBMERGED PIPELINES AND OBSTRUCTIONS OF CHANNEL.

Should it become necessary in the performance of this contract to close a channel to lay submerged pipeline across a navigable channel, the Contractor shall notify the Contracting Officer or Contracting Officer's Representative in writing to be received in the District office at least ten working days prior to the desired closure date.

This notification shall furnish the following:

(1) Location (Channel Centerline Stationing) and depth (above

Section 00 73 00 Page 10 the top of the pipeline) at which the submerged line will be placed;

(2) The desired length of time the channel is to be closed for installation of the pipeline;

(3) The date and hour placement or removal will commence;

(4) The date and hour of anticipated completion; and

(5) The name and telephone number of the person to be contacted for information and response to any emergency condition.

i. The Coast Guard has indicated that the requirements of navigation may make it necessary to establish times other than those requested.

IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE HIS PLANS

WITH THE COAST GUARD SUFFICIENTLY IN ADVANCE OF THE PLANNED CLOSING TO

PREVENT DELAY TO THE DREDGING OPERATIONS AND COMPLY WITH THE COAST

GUARD REQUIREMENT.

j. BRIDGE-TO-BRIDGE RADIO-TELEPHONE EQUIPMENT. In order that radio-telephone communication may be made with passing vessels, all dredges engaged in work under the contract shall be equipped with and operate bridge-to-bridge radio-telephone equipment on VHF Channel 13 (156.65 MHz with low power output having a communication range of approximately ten (10) miles). The Federal Communication Commission has approved the frequency.

1.9 TIME EXTENSIONS

a. Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

b. If a time extension is requested due to adverse weather conditions, the contractor must chronologically list each day that was lost due to adverse weather conditions with his daily reports. The Contracting Officer or his Representative will examine whether the contractor is entitled to a time extension. The adverse weather days must prevent work for 50% or more of the contractor’s work day and delay work critical to the timely completion of the project. The Contracting Officer or his Representative will convert any delays meeting the above requirements to calendar days and issue a modification in accordance with Contract Clause “CHANGES.”

1.10 LAYOUT OF WORK

The Government will provide the basic horizontal control data (coordinated triangulation stations) in the area. The Contractor shall compute and establish in the field all range points required for the proper discharge of his functions. The Contractor shall be responsible for the accuracy of the range points and its computations. The Contractor shall furnish, at his own expense, all stakes, templates, platforms, equipment, range markers, tide staffs and labor as may be required in laying out any part

Section 00 73 00 Page 11 of the work. The Contractor will be held responsible for the execution of the work to such lines and grades as required or indicated by the Contracting Officer or his representative. It shall be the responsibility of the Contractor to maintain and preserve all established stakes and markers. The Contractor may be required to suspend dredging at any time when for any reason the gauges or ranges cannot be seen or properly followed.

Contractor shall contact the New York District Survey Section at (201) 333-0248 for any future reference to horizontal and vertical control data.

1.11 DATUM AND BENCH MARKS

The plane of reference of Mean Lower Low Water (MLLW) as used in the USACE drawings and these specifications is that determined by the following benchmark and tide gauges:

New York and New Jersey Channels - Ward Point Bend:

Benchmark:

FIRE

Elevation: 7.39' (NAVD88)

3.89' (MLLW)

Benchmark:

B5 (PID: KV0006)

Elevation: 63.49' (NAVD88)

59.99' (MLLW)

Location: 609,401' (Northing) 556,990' (Easting)

40.506216 (Latitude) -74.266717 (Longitude)

All control needs to be verified.

The contractor may contact the New York District Survey Section at (201) 333-0284 for assistance in establishing the location of the bench marks and the tide gages.

1.12 ESTIMATED QUANTITIES

The total estimated quantities of material necessary to be removed from the specified limits to complete the work described in this specifications are computed from the plans and specifications survey performed in the New York and New Jersey Channels - Ward Point Bend project area on 5 & 6 February 2018.

Distribution of volumes is summarized below:

Section 00 73 00 Page 12

New York and New Jersey Channels - Ward Point Bend

Work Area Required Dredging

Depth (ft)

(MLLW)

Channel to Grade (CY)

Channel Overdepth, 2 foot (CY)

Slope to Grade (CY)

Slope Overdepth, 2 foot (CY)

ESTIMATED

TOTAL (CY)

Basic Work -35 64,195 85,725 19,160 13,220 182,300

Total Estimated Quantity Available (Basic Work + All Options): 182,300 CY

The Government will survey the project prior to starting work.

Above estimated quantities were computed from the data shown on the contract drawings. The quantities that may be removed and paid for will be computed by the Triangulated Irregular Network (TIN) method or average end area method as indicated in the Technical Specifications, Section 01 22 00.00 10, entitled "MEASUREMENT AND PAYMENT."

1.13 VARIATION IN ESTIMATED QUANTITIES

Where the quantity of a pay item in this contract is an estimated quantity and where the actual quantity of material within the required dredging prism varies more than fifteen percent (15%) above or below the stated estimated quantity within the required dredging prism, an equitable adjustment in the contract unit price will be made upon the demand of either party. The equitable adjustment will be based upon any increase or decrease in costs due solely to the variations above one-hundred fifteen percent (115%) or below eighty-five percent (85%) of the estimated quantity. An adjustment in the contract unit price will also apply to that part of the actual quantity of allowable overdepth material above one-hundred fifteen percent (115%) or below eighty-five percent (85%) of the estimated quantity. (UAI 52.211-5001 Variation in Estimated Quantities

MAR 1995)

1.14 HEAD PROTECTION

THE ENTIRE WORK SITE UNDER THIS CONTRACT IS DESIGNATED AS A HARD HAT AREA.

The Contractor shall post the area in accordance with the requirements of paragraph 05.D.01, EM 385-1-1, and shall ensure that all prime and subcontractor personnel, vendors, and visitors utilize hard hats while within the project area. (EM 385-1-1 30 Nov. 2014)

1.15 SIGNAL LIGHTS

The Contractor shall display signal lights and conduct his operations in accordance with the General Regulations of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no light signals can be displayed. Vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipelines, and day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel, and the passing by other

Section 00 73 00 Page 13 vessels or floating plant working in navigable channels, as approved by the Commandant, U.S. Coast Guard with respect to vessels on the high seas (33 CAR 81 App. A-72 COLREGS, Part C), vessels in inland waters (33-CFR

93.18 - 93.31a), and vessels in western rivers (33 CFR 95.5.51 - 95.70)), as applicable. (DAEN-PRP Ind dtd. 12 Sep. 83)

1.16 REVERSE SIGNAL ALARM

a. All construction equipment, except light service trucks, panels, pickup trucks, station wagons, crawler-type cranes, power shovels and draglines, whether moving alone or in combination shall be equipped with reverse signal alarms. The alarm shall be mounted on the rear of the equipment and shall be protected or constructed as to withstand severe wear and tear, adverse weather and unfavorable environmental working conditions and shall be certified by the manufacturer to fully meet the following performance standards.

b. The alarm shall produce a relatively pure tone which shall peak within the American National Std's. Inst. standard octave pass band of 600 to 2400 cycles per second and shall produce a 0.2 to 0.5 second audible warning within the initial three (3) feet of backward movement of the vehicle on which it is mounted and at regular intervals, not to exceed three (3) seconds throughout the backward movement. The alarm shall automatically stop when backward movement ceases. The sound intensity of the alarm shall range from and not exceed 90-100 db (decibels) at a horizontal distance of five feet from the alarm.

c. Actuation of the alarm shall be automatic by direct connections to any part of the equipment that moves or acts in a manner distinctive only to the rearward movement of the vehicle with no manual controls of any kind between the source of actuation and the alarm. Where application of this requirement to specific types of the equipment has impractical application, other means of actuation may be used upon written approval of the Contracting Officer and/or his Representative.

d. The use of the alarm shall be in the addition to prescribed requirements for signalmen.

1.17 MISPLACED MATERIAL

Should the Contractor during the progress of the work, lose, dump, throw overboard, sink, or misplace any material, plant, machinery, or appliance, which in the opinion of the Contracting Officer and/or his Representative may be dangerous to or obstruct navigation, the Contractor shall recover and remove the same with the utmost dispatch. The Contractor shall give immediate notice, with description and location of such obstructions, to the Contracting Officer and/or his Representative or inspector, and when required shall mark or buoy such obstruction until the same are removed.

Should he refuse, neglect, or delay compliance with the above requirements, such obstructions may be removed by the Contracting Officer and/or his Representative, and the cost of such removal may be deducted from any money due or to become due to the Contractor, or may be recovered under his bond. The liability of the Contractor for the removal of a vessel wrecked or sunk without fault or negligence shall be limited to that provided in Sections 15, 19, and 20 of the Rivers and Harbors Act of March 3, 1899 (33 USC. 410 et seq.) (DOD FARS SUPPL. 52.236-7006).

Section 00 73 00 Page 14

1.18 CONTINUITY OF WORK

No payment will be made for work done in any area designated by the Contracting Officer and/or his Representative until the full depth required under the contract is secured in the whole of such area, unless prevented by ledge rock; nor will payment be made for excavation in any area not adjacent to and in prolongation of areas where full depth has been secured except by decision of the Contracting Officer or Contracting Officer's Representative. Should any such nonadjacent area be excavated to full depth during the operations carried on under the contract, payment for all work therein may be deferred until the required depth has been made in the area intervening. The Contractor may be required to suspend dredging at any time when for any reason the gauges or ranges cannot be seen or properly followed.

1.19 FINAL EXAMINATION AND ACCEPTANCE

a. As soon as practicable after the completion of the entire work, as in the opinion of the Contracting Officer and/or his Representative, will not be subject to damage by further operation under the contract, such work will be thoroughly examined at the cost and expense of the Government by sounding or by sweeping, or both, as determined by the Contracting Officer and/or his Representative. Only after the contractor has submitted a complete survey of the entire contract area(s), and submitted mapping and all data acquired to create such map, will the government perform its survey. Raw data, edited survey data with all supporting files and documentation, and all data generated during such work shall be furnished by the Contractor to the Contracting Officer and/or his Representative. Should any shoals, lumps, or other lack of contract depth be disclosed by this examination, the Contractor will be required to remove same by dredging at the contract rate for dredging or by other method approved by the contracting officer, but if the bottom is soft and the shoal areas are small and form no material obstruction to navigation, the removal of such shoals may be waived by the discretion of the Contracting Officer and/or his Representative. The Contractor or his authorized representative will be notified when soundings and/or sweepings are to be made, and will be required to accompany the survey party. When the entire contract area(s) is found to be in a satisfactory condition, it will be accepted as final. Should more than two soundings or sweeping operations by the Government over an area be necessary by reason of work for the removal of shoals disclosed at a prior sounding or sweeping operations, this work will be charged against the Contractor. The rate for each day in which the Government plant is engaged in such sounding or sweeping operations and/or is en route to or from the site or held, for the Contractor's convenience, at or near the site for these operations shall be $12,500.

b. Final acceptance of the entire work and the deductions or corrections of deductions made thereon will not be reopened after having once been made, except on evidence of collusion, fraud, or obvious error, and the acceptance of the entire work shall not change the time of payment of the retained percentages of the whole or any part of the work.

c. The entire area within the contract limits will be surveyed for final examination and acceptance. This contract has no partial acceptance areas.

Section 00 73 00 Page 15

d. All hydrographic survey data is to be collected in accordance with the Army Corps of Engineers manual EM-1110-2-1003.

e. Any survey related disagreement(s) as it pertains to this contract must be submitted in writing to the Contracting Officer or his Representative within 5 business days of occurrence of such survey related event. Failure to notify the Contracting Officer or his representative within 5 business days of such survey related event disqualifies the Contractor from any such related claims.

1.20 SHOALING

If, before the contract is completed, shoaling occurs in the finished channel because of the natural lowering of the side slopes, re-dredging at the contract price, within the limit of available funds, may be done if agreeable to both the Contractor and the Contracting Officer and/or his Representative.

1.21 INSPECTION

The inspectors will assess whether the gauges, ranges, location marks and limit marks are maintained in proper order; but the presence of the inspector shall not relieve the Contractor of the responsibility for the proper execution of the work in accordance with the specifications. The Contractor will be required:

a. To furnish, on the request of the Contracting Officer and/or his Representative or any inspector, the use of such boats, boatmen, laborers, a part of the ordinary and usual equipment and crew of the dredging plant as may be reasonably necessary in inspecting and supervising the work. However, the Contractor will not be required to furnish such facilities for the surveys prescribed in the clause entitled: "Final Examination and Acceptance."

b. To furnish, on the request of the Contracting Officer or the Contracting Officer's Representative or any inspector, suitable transportation from all points on shore designated by the Contracting Officer and/or his Representative to and from the various pieces of plant and to and from the placement area. Should the Contractor refuse, neglect, or delay compliance with these requirements, the specific facilities may be furnished and maintained by the Contracting Officer or Contracting Officer Representative, and the cost thereof will be deducted from any amounts due or to become due to the Contractor.

1.22 ACCOMMODATIONS FOR GOVERNMENT INSPECTORS

The Contractor shall furnish regularly to Government inspectors onboard the dredge or other craft upon which they are employed a suitable separate room for an office. The room shall be fully equipped and maintained to the satisfaction of the Contracting Officer and/or his Representative; it shall be properly heated, ventilated, and lighted, and shall have a desk which can be locked, and a chair for each inspector, and washing conveniences. In addition, the Contractor shall provide a suitable sleeping area for use by the Government inspector when weather or sea conditions preclude safe transfer to shore. The entire cost to the Contractor for furnishing, equipping and maintaining the foregoing accommodations shall be included in the contract price. If the Contractor fails to meet these requirements, the Contracting Officer and/or his

Section 00 73 00 Page 16

Representative will secure the facilities referred to above, and the cost thereof will be deducted from payments to the Contractor.

1.23 EQUIPMENT OWNERSHIP & OPERATING EXPENSE SCHEDULE

a. Allowable costs for construction of marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data when the Government can determine both ownership and operating costs for each piece of equipment or equipment groups of similar serial and series from the contractor's accounting records. When both ownership and operating costs cannot be determined from the contractor's accounting records, equipment costs shall be based upon the applicable provision of EP 1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule," Region I.

Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule effect at the time of negotiations shall apply.

For retrospective pricing, the schedule in effect at the time the work was performed shall apply.

b. Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36 substantiated by certified copies of paid invoices. Rates for equipment rented from an organization under common control, lease-purchase or sale-leaseback arrangements will be determined using the schedule except that rental costs leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated leases are allowable. Costs for major repairs and overhaul are unallowable.

c. When actual equipment costs are proposed and the total amount of the pricing action is over $25,000, cost or pricing data shall be submitted on Standard Form 1411, "Contract Pricing Proposal Cover Sheet." By submitting cost or pricing data, the contractor grants to the contracting officer or an authorizing representative the right to examine those books, records, documents and other supporting data that will permit evaluation of the proposed equipment costs. After price agreement the contractor shall certify that the equipment costs or pricing data submitted are accurate, complete and current.(UAI 31.105-101 Equipment Ownership & Operating Expense Schedule MAR 1995)

1.24 FUEL USAGE

The Contractor shall furnish the Contracting Officer and/or his Representative a report, to be received on or before the last day of the calendar month, listing the totals of fuels consumed by the dredging plant, supporting vessels, and other construction equipments. The report shall list the quantities of different fuels separately. The report shall cover the period from the 25th of the preceding month to the 25th of the current month.

1.25 OIL TRANSFER OPERATIONS

The Contractor shall assure that oil transfer operations to or from his plant comply with all Federal, state, municipal laws, codes and

Section 00 73 00 Page 17 regulations (see Attachment D of Section 00 90 01 for regulation on "Oil and Hazardous Material Transfer Operations" - 33 CFR 156). Particular attention is invited to 33 CFR Subchapter O, Pollution. The Contractor shall incorporate in the accident prevention program, submitted in compliance with Section 00700, contract clause "ACCIDENT PREVENTION," sufficient information to demonstrate that all fuel transfers will be made in compliance with 33 CFR 156 and any other applicable laws, codes and regulations. (NAP-1/81)

1.26 WAGE RATES

The attached schedule of wage rates contains rates applicable to all work under this contract (see Section 00 90 01).

1.27 LABOR-ADDITIONAL REQUIREMENTS

Fringe benefits statement: The method of payment of applicable fringe benefits will be indicated on DD Form 879, Statement of Compliance, and attached to each weekly payroll.

1.28 NOTICE TO MARINERS

The Contractor shall, prior to commencement of work, notify the 1st Coast Guard District, Aids to Navigation Officer, of his proposed operations including location and duration of operations and request that the information be published in the "Notice to Mariners." This notification must be in sufficient time so that it appears in the Notice at least 30 days prior to the commencement of the dredging operation.

1.29 ENVIRONMENTAL LITIGATION

a. If the performance of all or any part of the work is suspended, delayed, or interrupted due to an order of a court of competent jurisdiction as a result of environmental litigation, as defined below, the Contracting Officer and/or his Representative, at the request of the Contractor, shall determine whether the order is due in any part to the acts or omissions of the Contractor or a Subcontractor at any tier not required by the terms of this contract. If it is determined that the order is not due in any part to acts or omissions of the Contractor or a Subcontractor at any tier other than as required by the terms of this contract, such suspension, delay, or interruption shall be considered as if ordered by the Contracting Officer and/or his Representative in the administration of this contract under the terms of Section I, contract clause entitled "SUSPENSION OF WORK." The period of such suspension, delay or interruption shall be considered unreasonable, and an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) as provided in that clause, subject to all the provisions thereof.

b. The term "environmental litigation," as used herein, means a lawsuit alleging that the work will have an adverse effect on the environment or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment.

1.30 NOISE LEVEL CRITERIA

Maximum sound pressure levels measured at the booster pumps, engine

Section 00 73 00 Page 18 generators and vehicles including muffler and exhaust components, shall not exceed decibel values prescribed by Federal, State and local codes and regulations. The foregoing applies with the pumps under normal operating conditions at not less than 50% full rated load. Tests will be performed at no additional cost to the Government by the Contractor, or the pump engine and generator manufacturer or by an approved testing agency having proven capability in noise measurements and using approved measurement equipment and acceptable measurement procedures. Test data will be submitted to the Contracting Officer for approval 5 days after the commencement of dredging operations. Should the sound pressure (noise) level test data indicate a need for sound reduction, the Contractor will provide necessary enclosures, baffles or any other appropriate means around booster pumps and engine generators including muffler and exhaust components, so as to attain noise levels which do not exceed those prescribed by aforementioned regulations.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.