Plans_4_of_4.pdf
PDF 8 MB Posted
- Attached to
- Fire Island Maintenance Project 3B3
- Solicitation number
- W912DS18B0008
About this file
Plans 4/4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.01.02_Bid_Abstract_W912DS18C0008.xlsx | XLSX spreadsheet | |
| FIMI_Specs.pdf | ||
| Plans_1_of_4.pdf | ||
| Plans_3_of_4.pdf | ||
| Solicitation_W912DS18B0008.pdf | ||
| plans_2_of_4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-113
SCALE: AS SHOWN
DECK DETAILS II
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
RM
RC
4/7/2017
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
1st WALK
PATCHOGUE, NY 11772
536 DP
GINSBERG RESIDENCE
5991-72
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
1 REVISED PER USACE COMMENTS 09-18-17
5 TOB BD CD PERMIT REVIEW 09-18-17
6 USACE CD REVIEW 09-21-17
2 USACE COMMENTS 04-09-18
3.000 ari@debruinengineering.com
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-114
SCALE: AS SHOWN
WALKOVER
DETAILS I
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
RM
RC
4/7/2017
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
1st WALK
PATCHOGUE, NY 11772
536 DP
GINSBERG RESIDENCE
5991-72
ALL WALKOVER WORK IS
BY OWNER UNDER
SEPARATE CONTRACT
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-115
SCALE: AS SHOWN
WALKOVER
DETAILS II
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
RM
RC
4/7/2017
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
1st WALK
PATCHOGUE, NY 11772
536 DP
GINSBERG RESIDENCE
5991-72
ALL WALKOVER WORK IS
BY OWNER UNDER
SEPARATE CONTRACT
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
CONSTRUCTION NOTES:
1. NO WORK TO START UNTIL APPROVED PLANS ARE OBTAINED FROM THE BUILDING DEPARTMENT.
2. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. LARGER SCALE DETAILS SHALL
HAVE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
3. IT IS THE INTENTION OF THE DRAWINGS TO PROVIDE FOR A COMPLETE JOB IN ALL RESPECTS AND NO EXTRAS WILL BE ALLOWED FOR MATERIALS AND/OR LABOR REQUIRED TO COMPLETE THE WORK AS INDICATED.
4. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE AND THE CONTRACTING OFFICER'S OFFICE MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS
SHOWN ON THE DRAWINGS.
5. THESE PLANS ESSENTIALLY CONFORM TO THE FOLLOWING CODES, NEVERTHELESS, WHETHER SPECIFIED OR NOT, ALL CONSTRUCTION MUST CONFORM TO THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE; NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION CODE; NEW YORK STATE
ELECTRICAL AND PLUMBING CODE AND/OR LOCAL CODES WITH JURISDICTION AND VARIANCES.
6. CONSTRUCTION SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES, ORDINANCES, RULES AND REGULATIONS. CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS AND OBTAIN THE CERTIFICATE OF
OCCUPANCY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTION AND MISALIGNMENT ACCORDING
TO CODES, STANDARDS AND GOOD PRACTICE.
8. THE INSTALLATION OF ALL MATERIALS AND PRODUCTS SHALL MEET ALL LOCAL FIRE DEPARTMENT'S REQUIREMENTS AND REGULATIONS, PROOF OF WHICH SHALL BE FURNISHED TO THE FIRE MARSHAL PRIOR
TO THE INSTALLATION OF SUCH MATERIALS AND PRODUCTS.
9. THE CONTRACTING OFFICER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, DEVIATIONS, TECHNIQUES, SEQUENCES, PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, NOR FOR ANY SUBCONTRACTORS OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY
OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
10.THE ENTIRE PREMISES SHALL BE CLEANED OF ALL DEBRIS AND EXCESS MATERIALS TO THE SATISFACTION OF THE CONTRACTING OFFICER, INCLUDING LABELS AND PROTECTIVE COATINGS ON ALL MATERIALS.
11.REQUEST FOR FINAL PAYMENT MUST BE ACCOMPANIED WITH A WAIVER OF LIENS SIGNED BY ALL
SUBCONTRACTORS AND MATERIAL SUPPLIERS IN ADDITION TO THE GENERAL CONTRACTOR.
12.GENERAL CONTRACTOR TO COORDINATE WORK BETWEEN ALL TRADES.
13.THE TERM “CONTRACTOR” IN THESE DRAWINGS AND SPECIFICATIONS SHALL MEAN THE GENERAL
CONTRACTOR, WHO SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF THE WORK OF ALL THE
SUBCONTRACTORS EMPLOYED BY HIM.
14.NO CONTRACTOR SHALL BE BROUGHT ONTO THE SITE WITHOUT FIRST PROVIDING ALL LIABILITY AND COMPENSATION INSURANCE AS MANDATED BY THE LAW AND/OR CONTRACTING OFFICER'S REQUIREMENTS.
IT SHALL BE THE DUTY OF THE CONTRACTOR TO SEE THAT ALL SUBCONTRACTORS ARE COVERED BY THE
REQUIRED INSURANCE AND HE SHALL BE RESPONSIBLE FOR THE SAME.
15.ALL MATERIALS SHALL BE FIRST CLASS AS HEREIN SPECIFIED, AND ALL LABOR SHALL BE DONE IN A
THOROUGH AND WORKMANLIKE MANNER.
16.THE CONTRACTOR SHALL REPLACE WITHIN ONE YEAR, WITHOUT ADDITIONAL CHARGE, ANY WORK
WHICH DEVELOPS DEFECTS DUE TO POOR WORKMANSHIP OR INFERIOR MATERIALS.
17.THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT REQUIRED FOR THE PERFORMANCE OF THE WORK. ALL MATERIALS SHALL BE BROUGHT TO THE SITE BY WATER ACCESS ONLY AND DELIVERED TO APPROVED PIERS/MARAINAS/DOCKS UTILIZING APPROVED HAUL ROUTES. CONTRACTOR SHALL COORDINATE AND SUBMIT DELIVERY PLANS WITH THE CONTRACTING OFFICER FOR REVIEW AN D
APPROVAL PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
18.THE CONTRACTOR SHALL BE LIABLE FOR ANY VIOLATIONS OF THE LAW AND ANY DAMAGE TO
ADJOINING PROPERTY CAUSED BY THE CONTRACTOR AND HIS EMPLOYEES.
19.THE CONTRACTOR TO FOLLOW ALL MANUFACTURER'S SPECIFICATIONS FOR THE INSTALLATION OF ALL
EQUIPMENT, PRODUCTS AND SYSTEMS.
20.THE CONTRACTOR SHALL FURNISH TO THE CONTRACTING OFFICER, A WRITTEN STATEMENT CERTIFYING THAT HIS WORK MEETS THE SPECIFICATIONS AS WELL AS CONFORMING TO THE GOVERNING CODES APPLICABLE AT THE TIME THE WORK WAS PERFORMED, AND CONFORMS TO THE PREVAILING STANDARDS
OF PRACTICE IN THE INDUSTRY.
21. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL TEMPORARY STRUCTURE (I.E:-
STEPS, RAILINGS, RAMPS, ETC.) AS PART OF THE INSTALLATION OF NEW STRUCTURE.
22. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING CERTIFICATE OF OCCUPANCY UPON COMPLETION
OF PROJECT
23. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE DUNE
24. CONTRACTOR SHALL HIRE A LICENSED LAND SURVEYOR TO PREPARE FINAL SURVEYS MEETING THE REQUIREMENTS OF THE SUFFOLK COUNTY SCDHS AND THE BUILDING DEPARTMENT. SURVEYS SHALL BE
SUBMITTED TO AGENCIES AND CONTRACTING OFFICER.
25. UTILITIES
A. THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING ALL UTILITY DISCONNECTS AND RECONNECTIONS WITH THE UTILITY COMPANIES, PAYING ALL RELATED FEES AND PROVIDING EVIDENCE OF THE SAME TO
THE TOWN OF BROOKHAVEN AND CONTRACTING OFFICER. THIS INCLUDES POWER, WATER,
TELECOMMUNICATIONS AND GAS. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL UTILITY
PIPING AND/OR WIRES AFTER THEY HAVE BEEN DISCONNECTED AND SAFED OFF BY THE
OWNING UTILITY COMPANY.
B. NOTIFY CONTRACTING OFFICER AND SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES (SCDHS) OF INTENT TO ABANDON SEPTIC SYSTEM. FILE ALL PAPER WORK PAY ALL FEES AND ARRANGE ALL INSPECTIONS REQUIRED BY THE DEPARTMENT. EXPOSE ALL ELEMENTS OF THE SANITARY SYSTEM. PUMP SYSTEM OUT IN A MANNER APPROVED BY SCDHS. SYSTEM PUMP OUT SHALL BE CONDUCTED BY A CONTRACTOR LICENSED TO DO SO. COMPLETELY REMOVE ALL ELEMENTS OF THE SEPTIC SANITARY SYSTEM - PIPING, TANKS AND LEACHING STRUCTURES. PROVIDE CERTIFICATION OF ABANDONMENT TO
THE SCDHS AND THE CONTRACTING OFFICER AT THE COMPLETION OF THE WORK.
DECK FRAMING NOTES:
1. WOOD DESIGN AND MATERIAL SELECTION BASED ON THE FOLLOWING CODES:
a. NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION (NDS 2005)
b. ASCE 7-10 - MINIMUM LOADS FOR BUILDINGS AND OTHER STRUCTURES
c. INTERNATIONAL RESIDENTIAL CODE (IRC)
d. DCA-6 - PRESCRIPTIVE RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE.
2. ALL FRAMING LUMBER SHALL BE SOUTHERN PINE OR DFI OR HFI - SELECT STRUCTURAL OR APPROVED
EQUAL.
3. ALL LUMBER SHALL BE IDENTIFIED BY THE GRADE MARK OF, OR CERTIFICATE OF INSPECTION ISSUED BY, AN
APPROVED LUMBER GRADING OR INSPECTION BUREAU OR AGENCY.
4. ALL LUMBER SHALL BE PRESERVATIVELY TREATED WITH AN APPROVED PROCESS IN ACCORDANCE WITH
AMERICAN WOOD PROTECTION ASSOCIATION STANDARDS.
5. ALL LUMBER IN CONTACT WITH THE GROUND SHALL BE APPROVED PRESERVATIVE TREATED WOOD
SUITABLE FOR GROUND CONTACT.
6. ALL CUTS SHALL BE FIELD-TREATED WITH AN APPROVED PRESERVATIVE, SUCH AS COPPER NAPHTHENATE.
7. ALL NAILS SHALL MEET THE REQUIREMENTS OF ASTM F1667. THREADED NAILS INCLUDE HELICAL (SPIRAL) AND ANNULAR (RING-SHANK) NAILS. WOOD SCREWS SHALL MEET THE REQUIREMENTS OF ANSI/ASME B18.6.1. BOLTS AND LAG SCREWS SHALL MEET THE REQUIREMENTS OF ANSI/ASME B18.2.1. ALL NAILS, SCREWS AND BOLTS SHALL BE HOT DIPPED GALVANIZED PER ASTM SPECIFICATION SECTION ASTM A153/A153M.
8. ALL CONNECTORS (JOIST HANGERS, POST ANCHORS, ETC., SHALL BE AS MANUFACTURED BY SIMPSON ZMAX
COATING OR APPROVED EQUAL).
9. TOE-NAILING OF JOISTS IS PROHIBITED. USE MINIMUM 16 GAUGE JOIST HANGERS TO FRAME TO STRINGERS.
10.ALL CONNECTORS SHALL BE SIMPSON STRONG-TIE CONNECTORS OR APPROVED EQUAL. CONTRACTOR TO REFER TO “SIMPSON STRONG-TIE” C-HW09 HIGH WIND RESISTANT CONSTRUCTION PRODUT MANUAL FOR INFORMATION REGARDING ANCHORS NECESSARY FOR ALL CONNECTIONS (EVEN IF NOT SPECIFIED IN
THE DRAWINGS).
11.ALL FLASHING SHALL BE CORROSION-RESISTANT STAINLESS STEEL, GRADE 304 OR 316 OF MINIMUM NOMINAL 0.019-INCH THICKNESS OR APPROVED NON-METALLIC MATERIAL. ALUMINUM SHOULD NOT BE USED IN DIRECT CONTACT WITH LUMBER TREATED WITH PRESERVATIVES THAT CONTAIN COPPER, SUCH AS
ACQ, COPPER AZOLE OR ACZA.
12.DECK SHALL NOT BE USED OR OCCUPIED UNTIL FINAL INSPECTION AND APPROVAL IS OBTAINED.
13.ABOVE-GROUND PRESERVATION TREATMENT SHALL BE UC3B OR EQUAL.
14.GROUND CONTACT PRESERVATION TREATMENT SHALL BE UC4A OR EQUAL.
15.WHERE PARTIAL REMOVAL OF DECK PLANKS ARE PERMITTED, NEW DECK PLANKING SHALL MATCH
EXISTING IN MATERIAL TYPE AND COLOR.
16.THE CONTRACTOR IS TO VERIFY ALL MEASUREMENTS IN THE FIELD AND ANY DISCREPANCIES ARE TO BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION.
17.THE CONTRACTOR SHALL PROTECT AND BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO EXISTING
FACILITIES WITHIN OR ADJACENT TO THE PROJECT SITE.
18.ALL POSTS SHALL BE SPF OR DF#1, EITHER 6X6 OR 8X8, AS NOTED ON PLANS. PRESSURE TREATED IN
ACCORDANCE WITH THE APWA UC5A.
19.ALL PILES SHALL BE SPF OR DF#1, NOMINAL 12' TAPPERED BUTT PILE, AS NOTED ON PLANS. PRESSURE
TREATED IN ACCORDANCE WITH AWPA UC5A.
20.ALL PILES SHALL HAVE A 20-TON MINIMUM ULTIMATE BEARING CAPACITY. THE PILE CONTRACTOR SHALL MAINTAIN A PILE DRIVING RECORD DURING PILE DRIVING AND SUBMIT IT TO THE CONTRACTING OFFICER UPON COMPLETION OF PILE DRIVING. THE RECORD SHALL INDICATE, FOR EACH PILE DRIVEN, THE LOCATION OF THE PILE, THE TYPE AND RATING OF THE PILE DRIVING EQUIPMENT, OVERALL BLOW COUNT PER FOOT, NUMBER OF BLOWS PER INCH PENETRATION FOR THE LAST 12 INCHES, PILE LENGTH, BEARING
CAPACITY, AND ANY USUAL CONDITIONS ENCOUNTERED DURING DRIVING.
21.HOME ELEVATION PILE EMBEDMENT DEPTH SHALL BE A MINIMUM OF 20 FEET BELOW GRADE AT EACH
PILE LOCATION (MIN).
22.DECK OR WALKOVER PILE EMBEDMENT SHALL BE A MINIMUM OF 6' BELOW UNDISTURBED GRADE.
23.PILES SHALL BE DRIVEN TO WITHIN 3 INCHES OF THE LOCATIONS INDICATED ON THIS DRAWING.
24.NOTCH PILES WHERE SHOWN ON THE DETAILS TO CREATE SHELF FOR GIRDERS, OR AS AN ALTERNATE, CONTRACTOR MAY INSTALL SHELF BLOCKING AS SHOWN ON PLANS FOR ALL SQUARE TIMBER PILES OR POSTS. PILES SHALL NOT BE NOTCHED MORE THAN 50% OF CROSS SECTION. DOUBLE BOLT EACH GIRDER TO
PILE WITH HOT DIPPED GALVANIZED BOLTS, NUTS AND FLAT AND LOCK WASHERS.
25.ALL STRUCTURAL PLACES AND SHAPES SHALL BE ASTM A36 AND HOT DIPPED GALVANIZED IN
ACCORDANCE WITH ASTM A123.
26.ALL NUTS, BOLTS, FLAT AND LOCK WASHERS SHALL BE ASTM A325 (MINIMUM 5
8 DIAMETER ON PLANS)
AND HOT DIPPED GALVANIZED IN ACCORDANCE WITH ASTM A153.
27.ALL GIRDERS BEAMS AND BRACES SHALL BE PRESSURE TREATED IN ACCORDANCE WITH AWPA
STANDARD UI.
28.TREAT ALL PILE CUT OFF ENDS, NOTCHES, DRILL HOLES AND END GRAINS IN THE ENDS OF GIRDERS, BEAMS, AND BRACES WITH WOOD PRESERVATIVE IN ACCORDANCE WITH AWPA STANDARD UI.
29.REMOVE CUT OFF SECTIONS OF PILES FROM THE SITE AND DISPOSE OF THEM.
PILE INSTALLATION NOTES:
1. TIMBER PILES:
TIMBER PILES SHALL BE IN ONE PIECE WITH AN APPROXIMATE UNIFORM TAPER FROM BUTT TO TIP AND
SHALL CONFORM TO ALL REQUIREMENTS OF ASTM D25. TIMBER PILES SHALL BE UNUSED, CLEAN, AND
PEELED ROUND TIMBER PILES TREATED IN ACCORDANCE WITH AWPA T1 AND U1. OFFERED PRODUCTS
SHOULD COMPLY WITH APPLICABLE AWPA STANDARDS. IDENTIFY TREATMENT ON EACH PIECE BY THE
QUALITY MARK OF AN AGENCY ACCREDITED BY THE BOARD OF REVIEW OF THE AMERICA LUMBER
STANDARD COMMITTEE.
A. SAW OFF TOPS OF TIMBER PILES IN A HORIZONTAL PLANE. CUTOFFS AND DAMAGED PILE SURFACES
SHALL BE TREATED AS SPECIFIED IN AWPA M4.
C. SPUD PILES OR BORED HOLES MAY BE USED TO PENETRATE HIGHLY RESISTANT STRATA LYING NEAR
SURFACE.
D. CONTRACTOR SHALL SUBMIT A SIGNED CERTIFICATE STATING THAT PRESERVATIVE TREATMENT OF
TIMBER PILES DELIVERED TO SITE COMPLIES WITH STRUCTURAL AND ENVIRONMENTAL
REQUIREMENTS. CERTIFICATE SHALL CONTAIN NAME AND ADDRESS OF CONTRACTOR, PROJECT
LOCATIONS, QUANTITY OF PILES AND DATE OR DATES OF SHIPMENTS, NAME OF PRESERVATIVE USED
AND RETENTION IN POUNDS PER CUBIC FOOT OF WOOD TREATED.
G. IT SHALL BE CONTRACTOR'S RESPONSIBILITY TO FURNISH THE SPECIFIED TYPE OF PILE NECESSARY TO INSTALL
A SATISFACTORY PILE FOUNDATION. CONVERSION FROM ONE TYPE OF PILE TO AN APPROVED EQUAL SHALL
BE AT NO ADDITIONAL COST TO THE CONTRACTING OFFICER.
H. SURVEY: REGISTERED PROFESSIONAL LAND SURVEYOR SHALL ESTABLISH LINES AND LEVELS AND STAKE PILE
LOCATIONS.
1. AFTER ALL PILES ARE INSTALLED, REGISTERED PROFESSIONAL LAND SURVEY OR SHALL MAKE FIELD
SURVEY OF COMPLETED PILING WORK. SUBMIT DRAWING TO CONTRACTING OFFICER SHOWING ACTUAL
PILE LOCATIONS WITH RESPECT TO PLANNED PILE LOCATIONS AND INDICATING PLUMBNESS OF PILES.
I. REPORTS: SUBMIT A REPORT TO CONTRACTING OFFICER FOR EACH PILE, DETAILING DIAMETER OR CROSS SECTION, LENGTH, MAKE AND MODEL OF PILE INSTALLATION EQUIPMENT AND ANY OTHER PERTINENT INFORMATION.
2. INSTALLATION
A. ALL TIMBER PILES SHALL BE 12" DIAMETER CLASS I ASTM D25, REATED AT 20 TON ULTIMATE CAPACITY USING
B. IF, DURING INSTALLATION OF ANY PILE, PREVIOUSLY INSTALLED PILES SHOW SIGNS OF HEAVING, REINSTALL
DISTURBED PILES TO THEIR ORIGINAL RESISTANCE, AT NO ADDITIONAL COST TO THE CONTRACTING OFFICER.
C. REMOVE SOIL THAT HEAVES DURING OR AFTER INSTALLATION TO MAINTAIN GRADES.
D. WHERE THE PROTECTIVE SHELL OF TREATED WOOD IS IMPAIRED AT A POINT WHICH AFTER INSTALLATION WILL
BE NOT LESS THAN 10 FEET BELOW THE GROUND, MAKE REPAIRS IN ACCORDANCE WITH AWPA M4 UNLESS THE
PILE IS DAMAGED TO SUCH EXTENT THAT IT IS REJECTED.
E. WITHDRAW DAMAGED OR DEFECTIVE PILES AND PILES THAT EXCEED INSTALLATION TOLERANCES AND INSTALL NEW
PILES WITHIN INSTALLATION TOLERANCES. FILL HOLES LEFT BY WITHDRAWN PILES AS DIRECTED BY CONTRACTING OFFICER.
1. REJECTED PILES MAY NOT BE CUT AND ABANDONED IN PLACE. CONTRACTOR SHALL REMOVE REJECTED PILES
2. FILL HOLES LEFT BY WITHDRAWN PILES THAT WILL NOT BE FILLED BY NEW PILES UTILIZING THE EXCAVATED
MATERIALS FROM OTHER PILE INSTALLATIONS. PLACE AND COMPACT IN LIFTS NOT EXCEEDING 12 INCHES.
F. CUT OFF TOPS OF PILES BY AN APPROVED METHOD SQUARE WITH PILE AXIS AND AT REQUIRED
ELEVATIONS.
3. FIELD CONTROLLED INSPECTIONS
A. TESTING AGENCY: CONTRACTOR WILL ENGAGE A NYSPE, APPROVED BY THE CONTRACTING OFFICER, TO PERFORM FIELD QUALITY-CONTROL TESTING.
J. REMOVE WITHDRAWN PILES AND CUTOFF SECTIONS OF PILES FROM SITE AND LEGALLY DISPOSE OF THEM
OFF CONTRACTING OFFICER'S PROPERTY IN ACCORDANCE WITH ALL AUTHORITIES HAVING JURISDICTION.
B. ALL TREATED TIMBER PILES SHALL BE PRESERVATIVE TREATED. PRESERVATIVE RETENTION SHALL BE
0.61 POUNDS PER CUBIC FOOT. PILE PRESERVATIVE TREATMENT SHALL COMPLY WITH AWPA C3 STANDARDS.
E. TREAT CUT ENDS AND DRILLED HOLES OF TREATED TIMBER PILES WITH THE SAME PENETRATING PRESERVATIVE
AS BASE TREATMENT CHEMICAL. ALL PILES SHALL BE UNIFORMLY SPACED ALONG WIDTH AND DEPTH OF BUILDING.
VARIATIONS OF +/-3" MAX ARE ALLOWED TO ADDRESS SITE CONDITIONS, PROVIDE PILE SPACES ARE A MINIMUM OF
4 PILE DIAMETERS UNLESS NOTED OTHERWISE. (U.N.O)
THESE CONSTRUCTION DOCUMENTS WERE PREPARED USING THE IBC 2015 RESIDENTIAL CODE FOR ONE AND TWO FAMILY HOMES IN CONJUNCTION W/ THE PRESCRIPTIVE DESIGN OF THE WOOD FRAME CONSTRUCTION MANUAL FOR ONE & TWO FAMILY DWELLINGS (2001 EDITION) & ASCE 7 & FEMA P-550 COASTAL CONSTRUCTION MANUAL. LOAD CONDITIONS INCLUDE COMBINED WIND LOADING (130 MPH), WAVE ACTION (V ZONE CRITERIA), SCOURING EROSION, BOUNCY LOADS, IMPACT LOADS, LIVE AND DEAD LOADS.
CODE INFORMATION
CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA TABLE R301.2 (1)
AIR
FREEZING
INDEX
AIR
FREEZING
INDEX
ICE SHIELD
UNDERLAYMENT
REQUIRED
FLOOD
HAZARDS
SUBJECT TO DAMAGE FROM
DECAY
SLIGHT TO
MODERATE
TERMITEFROST LINE
DEPTHWEATHERING
MODERATE
TO HEAVY3 FEETSEVERE 11 YES YES 496
SEISMIC
DESIGN
CATEGORY
WIND BORNE
DEBRIS
REGIONSPEED (MPH)
WINDGROUND
SNOW LOAD
BYES13020 psf
MINIMUM UNIFORMLY DISTRIBUTED LIVE LOADS : TABLE R301.5
USE LIVE LOAD DEAD LOAD
Exterior Balconies Decks Passenger Vehicle Garages ATTICS without Storage ATTICS with Storage ROOMS other than sleeping rooms Sleeping Rooms Stairs Guardrails and Handrails
ROOFS:
Live = Ground Snow Load Adjustments as per ASCE 7
60 psf 40 psf 50 psf 10 psf 20 psf 40 psf 30 psf 40 psf 200 psf
20 psf 30 psf
10 psf 10 psf as per plan 10 psf 10 psf 10 psf 10 psf 10 psf 10 psf
10 psf
DEMOLITION NOTES:
1. REMOVE ALL ITEMS INDICATED ON THESE DRAWINGS.
2. VERIFY ALL EXISTING CONDITIONS. INFORM CONTRACTING OFFICER OF ANY CONDITIONS THAT AFFECT NEW
CONSTRUCTION AS SHOWN ON DRAWINGS.
3. SCOPE OF DEMOLITION AND REMOVAL WORK SHALL NOT BE LIMITED BY THESE DRAWINGS, BUT SHALL
INCLUDE ANY AND ALL WORK NECESSARY TO FACILITATE NEW CONSTRUCTION.
4. ALL WORK OF THIS SECTION SHALL BE ACCOMPLISHED IN STRICT CONFORMANCE WITH OSHA AND THE
RESIDENTIAL CODE OF NEW YORK STATE.
5. REPAIR ALL DAMAGE CAUSED TO ADJACENT CONSTRUCTION BY DEMOLITION WORK AT NO COST TO THE
CONTRACTING OFFICER.
6. CLEAN DEBRIS AND OTHER MATERIALS RESULTING FROM DEMOLITION EACH DAY AND LEAVE PREMISES
AND WORK IN CLEAN CONDITION.
7. CONTRACTOR TO VERIFY THAT ALL UTILITY DISCONNECTS ARE PERFORMED PRIOR TO DEMOLITION IF REQUIRED. INSPECT ALL DECKS FOR ELECTRIC, PLUMBING FIXTURES AND PIPING. NOTIFY CONTRACTING
OFFICER WITH FINDINGS.
8. PILES ARE TO BE REMOVED COMPLETELY FROM THE GROUND AND REMAINING VOIDS BACKFILLED WITH
CLEAN SAND.
9. THE CONTRACTOR HAS THE RIGHT OF SALVAGE FOR ANY BUILDING MATERIALS OR CONTENTS OF THE STRUCTURES. NO GUARANTEE IS MADE THAT SALVAGEABLE MATERIALS THAT ARE PRESENT AT THE TIME OF BID WILL BE PRESENT AT THE TIME OF DEMOLITION AND THE CONTRACTOR SHALL HAVE NO CLAIM OF
MONETARY DAMAGE AS A RESULT OF CHANGES IN SALVAGEABLE MATERIALS OR CONTENTS.
10. ALL DEMOLITION DEBRIS AND SALVAGED MATERIALS ARE THE PROPERTY OF THE CONTRACTOR AND SHALL
BE REMOVED FROM THE SITE AND DISPOSED OF IN A LEGAL MATTER BY WATER ACCESS ONLY.
11. THE SITE SHALL BE LEFT IN A RAKE CLEAN CONDITION. NO VISIBLE DEBRIS TO REMAIN ON SITE AT THE
COMPLETION OF PROJECT.
12. CONTRACTOR SHALL PROVIDE TEMPORARY SHORING, CRIBBING LOCATION, STEEL SUPPORT, AND BRACING FOR HOUSE RELOCATION AS REQUIRED TO PROTECT THE EXISTING HOUSE FROM STRESSES IN EXCESS OF THOSE WHICH CAUSE DAMAGE. SHORING, CRIBBING LOCATION, STEEL SUPPORT, AND BRACING SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF NEW YORK, AND HIRED BY THE CONTRACTOR DIRECTLY. CONTRACTOR SHALL PROVIDE SIGNED AND SEALED SHORING DRAWINGS OF ALL SHORING FOR REVIEW PRIOR TO WORK. REVIEW WILL BE PROVIDED FOR COMPLIANCE WITH
CONTRACT DOCUMENTS ONLY, AND NOT ON STRUCTURAL INTEGRITY, MEANS AND METHODS, OR
SUITABILITY OF SHORING AND BRACING.
13. PROTECTION OF VEGITATION - NO VEGETATION IS TO BE REMOVED AS PART OF THE DEMOLITION PROCESS.
THE CONTRACTOR SHALL PROTECT EXISTING VEGETATION UNTIL DEMOLITION WORK IS COMPLETED.
DAMAGED VEGETATION WILL BE RESTORED IN KIND AS DIRECTED BY THE CONTRACTING OFFICER.
1. PROVIDE A PILE INSTALLATION LOG CERTIFYING: PILE EMBEDMENT, PILE CAPACITY (IN TONS), BLOW COUNT
2. INSPECTION AND CERTIFICATION OF ALL BOLTED CONNECTIONS.
HAMMER ENERGY OF 7500 FT#, MAXIMUM BLOW COUNT 3 -4 BLOWS/INCH. MINIMUM SPACING SHALL BE
NOT LESS THAN 4 PILE DIAMETER, IN ACCORDANCE USACE SPECIFICATION EM 1110-2-22906
COMPLETELY FROM THE GROUND AND DISPOSE OF OFF SITE.
AND OVERALL LENGTH.
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
ND
RC
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
536 DP
GINSBERG RESIDENCE
A-116
6/14/2016
SCALE: NONE
GENERAL NOTES
1 USACE REVIEW 10-24-16
1 REVISED PER USACE COMMENTS 08-18-17
4 TOB BD CD PERMIT REVIEW 09-18-17
2 REVISED PER ARCHITECT'S COMMENTS 09-18-17
2 USACE CD REVIEW 05-09-17
3 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
3 USACE COMMENTS 01-12-18
4 USACE COMMENTS 04-09-18
H
U
N
T
I N
G
T
O
N
B
A
B
Y
L
O
N
S
M
I
T
H
T
O
W
N
ISLIP
BROOKHAVEN
R
I V
E
R
H
E
A
D
S
O
U
T
H
A
M
P
T
O
N
E
A
S
T
H
A
M
P
T
O
N
GREAT SOUTH
BAY
NNNN
NNNN
G-001 TITLE SHEET
276.55' N 20°29'11"W
277.02' S20°29'11"E
111.95' S63°31'32"W
112.00' N63°17'19"E
CENTER WALK
(DUNE WALK)
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
5991-73
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
ND
RC
SCALE: AS SHOWN
EXISTING
CONDITIONS
PLAN AND
SECTION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
C-101
2/10/2016
6 NYSDEC PERMIT REVIEW 10-05-16
7 USACE REVIEW 10-24-16
1 REVISED PER TOB - DEP COMMENT 11-09-16
8 USACE CD REVIEW 05-09-17
9 TOB BD CD PERMIT REVIEW 05-09-17
10 USACE CD REVIEW 09-21-17
276.55'
20°29'11"W
277.02' S20°29'11"E
111.95' S63°31'32"W
112.00' N63°17'19"E
CENTER WALK
(DUNE WALK)
276.55' N 20°29'11"W
277.02' S20°29'11"E
111.95' S63°31'32"W
112.00' N63°17'19"E
CENTER WALK
(DUNE WALK)
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
5991-73
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
ND
RC
C-102
12/22/2015
SCALE: AS SHOWN
PROPOSED
PLAN AND
SECTION
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
1 REVISED PER TOB - DEP COMMENT 11-09-16
2 USACE COMMENTS 04-09-18
UP
UP
UP
DN
DN
N '1
W
.5
S '1
E
.0
S63°31'32 "W
111.95'
N63°17'19 "E
112.00'
(DUNE WALK)
CENTER WALK
ATLANTIC OCEAN
5/8"
(2) 2'-0" X 1'-0" FOR 1,500 GAL TANK
SEPTIC TANK CORNER ANCHOR ASSEMBLY
MID TANK TOP BRACE PLATE DETAIL
N.T.S.
N.T.S.
LIQUID LEVEL
4" PVC
PIPE
SERIAL NUMBER EMBOSSED HERE
CAN BE REFERENCED TO THE
DATE OF MANUFACTURE
5'-9"
13'-1"
8'-1"
4'-1/2"
20" 2
FLOW
FLOW
4" PVC
PIPE
NORWESCO/SNYDER IND.
ST. BONIFACIUS, MN
1500 GALLON CAPACITY
MAX. EARTH COVER 3.0 FT
4" RUBBER GASKET
GROUNDWATER
M I N
14'-0"
NORWESCO/SNYDER IND.
ST. BONIFACIUS, MN
1500 GALLON CAPACITY
MAX. EARTH COVER 3.0 FT
7'-0"
HOLE IN PARTITION
4"Ø PASS-THROUGH
DIVIDER WALL
20" LID
WASHER (2 PLCS)
NUT AND 1/4"X2"
ROD EMBEDDED 9" WITH
5/8"Ø GALV THREADED
WITH 5/8" NUT AND 1/4"X2" WASHER (2 PLCS)
5/8"Ø GALV. THREADED ROD
MID TANK TOP BRACE PLATE (2 PLCS)
WITH NATIVE MATERIAL (2 PLCS)
BACKFILL TANK VOID
4" RUBBER GASKET
CLEARANCE ABOVE TOP OF INLET TEE 1"
COVER WITH 6" DIA. EXTENTION TO GRADE
S A
D
EL.=9.50'
GRADE
EL.=4.30'
WATER
GROUND
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
of the alteration.
alteration, and a specific description followed by his signature, the date of drawing with the notation “altered by” engineer shall affix his seal to the professional engineer, the altering altered under the direction of a drawing in any way. If the drawing is engineer, to alter any item on this direction of a licensed professional person, unless he is acting under the
New York State Education Law for any
It is a violation of Section 7209 of the
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
PS
INLET (FIMI)
TO THE MORICHES
FIRE ISLAND INLET
05/19/2017
SEPTIC SYSTEM
537DP KEYES
NO. REVISIONS DATE
NO. SUBMITTALS DATE
1" = 20'
AP
C-103
0+50
0+50
0+00
0+00 1+00
1+00
PLAN
SECTION
KEYES
GEOTEX NOT SHOWN ON THIS VIEW
GROUNDWATER
M
IN TANK
TO SEPTIC
40' - 0"
GRADE
VENTED CAP
COVER VENT PIPE
PLANT BUSHES TO
22.5 DEG PVC BEND
45 DEG PVC ELBOW
PVC TEE
PVC ELBOW
45 DEG
6"
NO ROOTS OR STONES
BACKFILL MATERIAL SHALL BE CLEAN,
MODULE (TYP)
EVERY OTHER GSF
PIPE WITH WIRE CLAMP
SECURE PERFORATED
HUMUS AND DREDGING
FREE OF TOPSOIL,
CLEAN RUN SAND,
SIZE 36" W X 48" L X 7" H (TYP).
ELJEN GEOTEXTILE SAND FILTER
GSF MODULES:
SOLID COVER
DRAIN BASIN WITH
2' DIA NYLOPLAST
4" SLEEVE
NO ROOTS OR STONES
BACKFILL MATERIAL SHALL BE CLEAN,
GSF MODULES.
INSTRUCTIONS. WRAP GEOTEX UNDER
GEOTEXTILE AS PER MANUFACTURER
INSTALL ELJEN PROVIDED
CONCRETE
W/ 3,000 PSI
POUR INVERT
SDR 35 @ 1/8"/FT
4" DIA PVC PIPE
EL.=7.19'
OF SYSTEM
BOTTOM
HOLES AT BOTTOM.
PERFORATED PIPE
4" DISTRIBUTION
SEE NOTE 3
ASTM C33 -
SAND BED
SPECIFIED
M
IN
SCALE: N.T.S.
TEST HOLE
SCALE: 1" = 20'
SCALE: 1" = 10'-0"
20 0 20 4010
SCALE IN FEET
KEY PLAN
SCALE: 1" = 100'
100 0 100 20050
SCALE IN FEET
PROPOSED DUNE
LANDWARD LIMIT OF
N
PARCEL
SUBJECT
N
ATLANTIC OCEAN
SCALE: 1/4" = 1'-0"
Susan E. Keyes
Bruce R. Keyes &
RESIDENCE
KEYES
DUNE WALK
BOUNDARYPROPERTY
BOUNDARYPROPERTY
B O
U N
D A
R Y
P R
O P
E R
T Y
B O
U N
D A
R Y
P R
O P
E R
T Y
SEPTIC TANK
W H
A L E
B O
N E W
A L
K
DUNE WALK
G .5
P a t r ic ia
A n e
R iz z u t o
R o b e r t
M
G in s b e r g
A n e t t e
G in s b e r g
ELJEN SYSTEM
CEHA LINE
ELEV 4.30'
GROUND WATER
SEPTIC TANK
EXISTING GRADE
H O
M E
E X
IS
T
IN
G
E D
G E O
F
SITE PLAN
SEPTIC SYSTEM PROFILE
SCALE: N.T.S.
ATLANTIC OCEAN
ST
FRAME HOUSE
2 STOREY
±1,791 SF
EL. 17.36'
PLATFORM
EL. 11.90'
WALKWAY
EX.
TEST HOLE
ELEVATION 9.50'
PERFORMED ON
05/11/2016
29.85
EL.
DECK
FLR.
2ND
26'-5" 8'-1"
HOUSE JOISTS
LINE FOR EXISTING
HANG NEW SANITARY
CONTRACTOR SHALL
HOUSE CONNECTION.
CONTINUE TO NEW
INV 8.92
G9.75
STA 0+00
ST
LT
COMPARTMENT SEPTIC TANK
PROPOSED DUNE
LANDWARD CREST OF
G9.80'
SITE PLAN LEGEND
13.08Lx5.75'Wx4.25'H TWO
NEW 1,500 GAL
MD#: N43504 AS MANUFACTURED
BY NORWESCO, OR APPROVED
INV 8.60
G10.34
STA 0+32.1
INV 8.35
G10.57
STA 0+45.2
GRADE
EXISTING
ELEV 5.02'
SEPTIC TANK
BOTTOM OF
CONCRETE
CAST-IN-PLACE
ELEV 5.02'
BOTTOM OF SEPTIC TANK
INV 8.60
INLET
INV 8.35
OUTLET
GRADE
EXISTING
M I N
C O
V E
R
M A
X
09-28-17SCDHS PERMIT REVIEW1
09-28-172 USACE CD REVIEW
SEE DETAIL 2/C103
NEW ELJEN SYSTEM.
DUNE
PROPOSED
LIMIT OF
LANDWARD
DUNE
PROPOSED
CREST OF
LANDWARD
FOR TEST HOLE DATA
SEE DETAIL 6/C103
ON 05/9/2016.
537DP KEYES PERFORMED
TEST HOLE LOCATED AT
INV 8.30
G10.62
STA 0+50.2 INV 8.51
G11.33
STA 0+98.6
INV 8.27
G10.64
STA 0+53.2
EQUAL.SEE DETAIL 3/C103
INV 8.27
G11.24
STA 0+93.2
(TYP)
@ 1/8"/FT MIN
4"Ø SDR 35
LEACHING SYSTEM
0+00
STA
JOISTS
FROM HOUSE
HANG PIPE
EXISTING.
CONNECT TO
0+32.1
STA 0+45.2
STA
0+53.2
STA
ELEVATION 17.1 IN NGVD 29
VE-16 (NAVD 1988) WHICH IS
5.SITE LOCATED IN FLOOD ZONE
VERTICAL DATUM = NGVD 1929
HORIZONTAL DATUM = NAD 1983
DATED 12/13/2014.
SURVEY PREPARED BY YOUNG & YOUNG,
4.ALL SURVEY INFORMATION TAKEN FROM
DISPOSAL SYSTEM PRIORTO BACKFILLING.
THE INSPECTION OF PIPING AND SEWAGE
CONTACTING THE SCDHS TO SCHEDULE
3. CONTRACTOR IS RESPONSIBLE FOR
PUBLIC WATER.
150' OF THE LOT ARE CONNECTED TO
2. NEIGHBORING PROPERTIES WITHIN
WITHIN 150' OF THE PROPERTY.
ARE NO PUBLIC WATER WELL FIELDS
1. PURSUANT TO SCWA RECORDS, THERE
SITE PLAN NOTES:
MODULES.
PLACED BELOW AND AROUND THE GSF
THAN 5% PASSING A #200 SIEVE SHALL BE
THAN 10% PASSING A #100 SIEVE AND LESS
3. ASTM C33 SPECIFIED SAND WITH LESS
BACKWASH FROM A WATER SOFTENER.
2. THIS SYSTEM IS NOT DESIGNED FOR
USE WITH A GARBAGE DISPOSAL.
1. THIS SYSTEM IS NOT DESIGNED FOR
LEACHING TANK NOTES:
LT
SCTM NO.
0200-987.00-05.00-019.000
LOT AREA = 30,817 SF
NO. BEDROOMS 5
MINIMUM REQUIRED SEPTIC TANK
CAPACITY = 1,500
ELEV 7.19'
BOTTOM OF LEACHING FIELD(2
M
IN
.8
PROPOSED GRADE ELEV.
4" DIA. CLEANOUT
FLOW ARROW
ELBOW DOWN
HOUSE TRAP
PERFORATED PIPE
BELOW GRADE 4" DIA.
SDR 35 @ 1/8"/FT (MIN)
BELOW GRADE 4" DIA.
SDR 35 @ 1/8"/FT (MIN)
ABOVE GRADE 4" DIA.
COMPLETELY FROM THE GROUND
REGULATIONS AND REMOVED
IN ACCORDANCE WITH SCDHS
SYSTEM TO BE DECOMMISSIONED
OF EXISTING SEPTIC
APPROXIMATE LOCATION
10-23-173 SCDHS PERMIT REVIEW
10-23-171 REVISED PER SCDHS COMMENTS
MIN REQUIRED LEACHING SYSTEM
EXPANSION.
AND AN ADDITIONAL ROW FOR 50%
USE 2 ROWS OF (10) MODULES = 80 FT
PROPOSED LENGTH OF TRENCH:
458 SF/ 6 SF/FT = 76 FT OF TRENCH
ELGEN LEACHING RATE = 6 SF/FT
REQUIRED LENGTH OF TRENCH:
550 GPD=458 SF TRENCH AREA
TRENCH AREA:
5 BEDROOM * 110 GPD/BR=550 GPD
DAILY FLOW:
INV 8.32
G10.61
STA 0+48.2 SANDY REBUILD
SCTM No.: 0200-987.00-05.00-019.000
SCDHS No.: R02-17-0252
SEE DETAIL C103/2)
EXCAVATION TRENCH
(5' SEPARATION TO
5'-6" TO MODULES
EXPANSION
FUTURE
CLARITY. SEE DETAIL C-103/2
EXCAVATION NOT SHOW FOR
LIMITS OF TRENCH
3'-0" (TYP)
5'-0" (TYP)
W H
A L
E B
O N
E W
A L
K
0+93.2
STA
EL. 20
.85'
1ST FLR. DECK
2ND FF 30.00'
1ST FF 21.08'
FROM THE NEW SYSTEM.
PIPE AND MAINTAIN MINIMUM 5' SEPARATION
FURNISH AND INSTALL A PVC SLEEVE FOR THE
IS ENCOUNTERED, THE CONTRACTOR SHALL
PROPOSED SEPTIC SYSTEM. IF WATER SERVICE
THE REQUIRED 10' SEPERATION DISTANCE FROM
VERIFIYING EXACT LOCATION AND MAINTAINING
SERVICE. CONTRACTOR IS RESPONSIBLE FOR
APPROXIMATE LOCATION OF EXISTING WATER
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
D-101
03/22/2017
SCALE: AS SHOWN
PILE/SUBSTRUCTURE
DEMOLITION
PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
D-102
03/22/2017
SCALE: AS SHOWN
DECK
DEMOLITION
PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
D-103
03/22/2017
SCALE: AS SHOWN
DEMOLITION
SECTIONS
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-101
03/22/2017
SCALE: AS SHOWN
PILE/SUBSTRUCTURE
PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-102
03/22/2017
SCALE: AS SHOWN
FIRST FLOOR
DECK PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-103
03/22/2017
SCALE: AS SHOWN
SECOND FLOOR
DECK PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-104
03/22/2017
SCALE: AS SHOWN
NORTH AND
SOUTH ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-105
03/22/2017
SCALE: AS SHOWN
EAST ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-106
03/22/2017
SCALE: AS SHOWN
WEST ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-107
03/22/2017
SCALE: AS SHOWN
SECTIONS
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
A-108
WALKOVER PLANS AND
ELEVATION
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
SCALE: AS SHOWN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 03-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
RM
RC
03/22/2017
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
BY OWNER UNDER
SEPARATE CONTRACT
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-109
SCALE: AS SHOWN
DECK DETAILS I
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
RM
RC
03/22/2017
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-110
SCALE: AS SHOWN
DECK DETAILS II
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
RM
RC
03/22/2017
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-111
SCALE: AS SHOWN
WALKOVER
DETAILS I
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
RM
RC
03/22/2017
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
BY OWNER UNDER
SEPARATE CONTRACT
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-112
SCALE: AS SHOWN
WALKOVER
DETAILS II
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
RM
RC
03/22/2017
31 DUNE WALK
PATCHOGUE, NY 11772
537 DP
KEYES RESIDENCE
5991-73
BY OWNER UNDER
SEPARATE CONTRACT
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
CONSTRUCTION NOTES:
1. NO WORK TO START UNTIL APPROVED PLANS ARE OBTAINED FROM THE BUILDING DEPARTMENT.
2. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. LARGER SCALE DETAILS SHALL
HAVE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
3. IT IS THE INTENTION OF THE DRAWINGS TO PROVIDE FOR A COMPLETE JOB IN ALL RESPECTS AND NO EXTRAS WILL BE ALLOWED FOR MATERIALS AND/OR LABOR REQUIRED TO COMPLETE THE WORK AS INDICATED.
4. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE AND THE CONTRACTING OFFICER'S OFFICE MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS
SHOWN ON THE DRAWINGS.
5. THESE PLANS ESSENTIALLY CONFORM TO THE FOLLOWING CODES, NEVERTHELESS, WHETHER SPECIFIED OR NOT, ALL CONSTRUCTION MUST CONFORM TO THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE; NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION CODE; NEW YORK STATE
ELECTRICAL AND PLUMBING CODE AND/OR LOCAL CODES WITH JURISDICTION AND VARIANCES.
6. CONSTRUCTION SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES, ORDINANCES, RULES AND REGULATIONS. CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS AND OBTAIN THE CERTIFICATE OF
OCCUPANCY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTION AND MISALIGNMENT ACCORDING
TO CODES, STANDARDS AND GOOD PRACTICE.
8. THE INSTALLATION OF ALL MATERIALS AND PRODUCTS SHALL MEET ALL LOCAL FIRE DEPARTMENT'S REQUIREMENTS AND REGULATIONS, PROOF OF WHICH SHALL BE FURNISHED TO THE FIRE MARSHAL PRIOR
TO THE INSTALLATION OF SUCH MATERIALS AND PRODUCTS.
9. THE CONTRACTING OFFICER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, DEVIATIONS, TECHNIQUES, SEQUENCES, PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, NOR FOR ANY SUBCONTRACTORS OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY
OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
10.THE ENTIRE PREMISES SHALL BE CLEANED OF ALL DEBRIS AND EXCESS MATERIALS TO THE SATISFACTION OF THE CONTRACTING OFFICER, INCLUDING LABELS AND PROTECTIVE COATINGS ON ALL MATERIALS.
11.REQUEST FOR FINAL PAYMENT MUST BE ACCOMPANIED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.