Plans_1_of_4.pdf
PDF 7 MB Posted
- Attached to
- Fire Island Maintenance Project 3B3
- Solicitation number
- W912DS18B0008
About this file
Plans 1/4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.01.02_Bid_Abstract_W912DS18C0008.xlsx | XLSX spreadsheet | |
| FIMI_Specs.pdf | ||
| Plans_4_of_4.pdf | ||
| Plans_3_of_4.pdf | ||
| Solicitation_W912DS18B0008.pdf | ||
| plans_2_of_4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
A T
E
T
IM
E
F
IL
E description of the alteration.
signature, the date of the alteration and a specific his seal and the notation "altered by" followed by his who directs another to so alter, shall affix to the items altered, the Professional Engineer who so alters, or any item on this material in any way. If any item is so direction of a licensed Professional Engineer, to alter illegal for any person, unless acting under the
Under N.Y.S. Educational Law Sec. 7209 Sub.2, it is
NOTE:
COUNTY OF SUFFOLK
DEPARTMENT OF PUBLIC WORKS
TOWN OF BROOKHAVEN, SUFFOLK COUNTY, NY
CONTRACT DRAWINGS FOR
JANUARY 2018
FIMI CONTRACT NUMBER 3B3
OwnerMap
3B3 BASE
OwnerMap
KEYES537DP
GINSBERG536DP
HASHER517DP
LEJA BEACH PROPERTIES 513DP
BAYSIDE ASSOCIATES511DP
VAN ALSTYNE253PW
3B3 OPTION
DAVIS PARK AND POINT O' WOODS
HOUSE RELOCATION AND SEPTIC SYSTEMS
H
U
N
T
I N
G
T
O
N
B
A
B
Y
L
O
N
S
M
I
T
H
T
O
W
N
ISLIP
BROOKHAVEN
R
I V
E
R
H
E
A
D
S
O
U
T
H
A
M
P
T
O
N
E
A
S
T
H
A
M
P
T
O
N
GREAT SOUTH
BAY
NNNN
NNNN
G-001 TITLE SHEET
3.000 ari@debruinengineering.com
MAP 253 PW
#135
3 STY
FRAME
HOUSE
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
5991-86
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
ND
RC
C-101
07/22/2016
SCALE: AS SHOWN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
253 PW
VAN ALSTYNE RESIDENCE
P o i n t
O
W o o d s
A s s o c i a t i o n r e p u t e d o w n e r
W i l l a r d
S
M o o r e
N a n c y
H
H a l l e t t
P e r k e r
D
H a n d y
N o w o r
F o r m e r l y o f
P o i n t
O
W o o d s
A s s o c i a t i o n
556 OCEAN WALK
EXISTING
CONDITIONS
PLAN AND
SECTION
1 SCDPW ASSESSMENT REVIEW 07-26-16
1 2
0200-985.80-01.00-031.000
Now or Formerly of
Joan Van Alstyne Johnson
Keats Van Alstyne
Ellen Van Alstyne Starrat
William C. Ferguson
2 SCDPW ASSESSMENT REVIEW 09-16-16
3 TOB DEP PERMIT REVIEW 10-19-16
4 TOB BD PERMIT REVIEW 11-02-16
5 TOB BD PERMIT REVIEW 01-30-17
6 TOB BZA PERMIT REVIEW 02-01-17
7 USACE CD REVIEW 05-22-17
0 20 4010
SCALE IN FEET
0 10 20 5
SCALE IN FEET
8 TOB BD CD PERMIT REVIEW 06-30-17
1 REVISED PER USACE COMMENTS 08-18-17
9 USACE CD REVIEW 08-18-17
10 TOB BD CD PERMIT REVIEW 09-18-17
2 USACE COMMENTS 01-17-18
3 USACE COMMENTS 04-09-18
MAP 253 PW
BOARDWALK
R A
M P
WOOD DECK
WOOD DECK
STEPS
STEPS
HOUSE
FRAME
3 STY
#135
EL:8.8 EL:8.8
EL:10.5 EL:10.5
EL:12.7 EL:12.5
W
E
GRADE
TO EXISTING
DOWN
3:1 SLOPE
EL.=4.10'
OF TANK
BOTTOM
253PW - Van Alstyne
20'-0" 2'-0"
SECTION
M
IN
GROUNDWATER
PLAN
IN
C O
U R
S E
S
EL.=4.10'
OF TANK
BOTTOM
NOTES:
1. TOP SLAB - PRECAST 5'x2'x3" REINFORCED CONCRETE WITH 1-1/2" INTERLOCK.
2. ALL BLOCKS TO BE 8"x8"x16" TAPERED CELL CESSPOOL BLOCK.
3. TOP COURSE OF BLOCK TO BE LAID ON SIDE WITH SOLID FACE OUT.
4. SOIL LINE - 4" DIAMETER, SDR35 PVC, SEALED TO TANK.
6. 5' MINIMUM DISTANCE FROM ANY PORTION OF TANK TO PROPERTY LINES AND
GRADE
5/8"
(2) 2'-0" X 1'-0" FOR 1,500 GAL TANK
SEPTIC TANK CORNER ANCHOR ASSEMBLY
MID TANK TOP BRACE PLATE DETAIL
N.T.S.
N.T.S.
LIQUID LEVEL
4" PVC
PIPE
SERIAL NUMBER EMBOSSED HERE
CAN BE REFERENCED TO THE
DATE OF MANUFACTURE
5'-9"
13'-1"
8'-1"
4'-1/2"
20" 2
FLOW
FLOW
4" PVC
PIPE
NORWESCO/SNYDER IND.
ST. BONIFACIUS, MN
1500 GALLON CAPACITY
MAX. EARTH COVER 3.0 FT
4" RUBBER GASKET
GROUNDWATER
M I N
14'-0"
NORWESCO/SNYDER IND.
ST. BONIFACIUS, MN
1500 GALLON CAPACITY
MAX. EARTH COVER 3.0 FT
7'-0"
HOLE IN PARTITION
4"Ø PASS-THROUGH
DIVIDER WALL
20" LID
WASHER (2 PLCS)
NUT AND 1/4"X2"
ROD EMBEDDED 9" WITH
5/8"Ø GALV THREADED
WITH 5/8" NUT AND 1/4"X2" WASHER (2 PLCS)
5/8"Ø GALV. THREADED ROD
MID TANK TOP BRACE PLATE (2 PLCS)
WITH NATIVE MATERIAL (2 PLCS)
BACKFILL TANK VOID
4" RUBBER GASKET
CLEARANCE ABOVE TOP OF INLET TEE 1"
COVER WITH 6" DIA. EXTENTION TO GRADE
S A
N
EL.=10.20'
GRADE
EL.=2.10'
WATER
GROUND
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
of the alteration.
alteration, and a specific description followed by his signature, the date of drawing with the notation “altered by” engineer shall affix his seal to the professional engineer, the altering altered under the direction of a drawing in any way. If the drawing is engineer, to alter any item on this direction of a licensed professional person, unless he is acting under the
New York State Education Law for any
It is a violation of Section 7209 of the
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
PS
INLET (FIMI)
TO THE MORICHES
FIRE ISLAND INLET
05/19/2017
SEPTIC SYSTEM
NO. REVISIONS DATE
NO. SUBMITTALS DATE
SCALE: AS SHOWN
AP
253PW
556 OCEAN WALK
VAN ALSTYNE RESIDENCE
C-103
E X
IS
T
IN
G H
O M
E
E D
G E O
F
P R
O P
E R
T Y L
IN
E
0+00
0+00
0+50 1+00
0+50 1+00
SCALE: N.T.S.
TEST HOLE
SCALE: 1" = 20'
SCALE: 1/2" = 1'-0"
SCALE: 1" = 10'
PARCEL
SUBJECT
10 0 10 205
SCALE IN FEET
KEY PLAN
SCALE: 1" = 100'
100 0 100 20050
SCALE IN FEET
N
N
OCEAN
ATLANTIC
B O
U N
D A
R Y
P R
O P
E R
T Y
B O
U N
D A
R Y
P R
O P
E R
T Y
LEACHING TANK DETAIL
SEPTIC TANK DETAIL
DUNE
PROPOSED
CREST OF
LANDWARD
DUNE
PROPOSED
LIMIT OF
LANDWARD
RESIDENCE
VAN ALSTYNE
NEW YORK AVENUE
NEW YORK AVENUE
JOISTS
HANG PIPE FROM HOUSE
CONNECT TO EXISTING.
W E
S T S
T R
E E
T
M A P
W
.8
.0
.0
William C. Ferguson Ellen Van Alstyne Starrat
Keats Van Alstyne Joan Van Alstyne Johnson
Now or Formerly of
SEPTIC SYSTEM
FROM PROPOSED
SEPARATION DISTANCE
MAINTAINING REQ'D. 10'
LOCATION AND
VERIFING EXACT
RESPONSIBLE FOR
SERVICE. CONTRACTOR IS
EXISTING WATER
APPROX. LOCATION OF
1 SCDHS PERMIT REVIEW 08-11-17
W E
S T S
T R
E E
T 90.00'
M
.8
.0
.0
CEHA LINE
SCALE: NTS
SEPTIC TANK LEACHING TANK
(M
IN
ELEV 2.10'
GROUND WATER
SANITARY PROFILE
ELEV 5.36'
BOTTOM OF SEPTIC TANK
ELEV 5.36'
SEPTC TANK
BOTTOM OF
INV 8.86
INLET
(C
E H
A
5'-0"
INV 8.61
OUTLET
INV 8.44
INLET
G9.94 G9.52
ELEV 4.10'
BOTTOM OF LEACHING TANK
SITE PLAN
FOR TEST HOLE DATA
ON 05/9/2016. SEE DETAIL 6/C103
SUBJECT PROPERTY) PERFORMED
(APPROXIMATELY 600' EAST OF
TEST HOLE LOCATED AT 267PW ALLEN
LINE REPRESENTS RADIUS LIMIT FROM
INV 8.44
G9.52
STA 0+38.6
INV 8.61
G9.94
STA 0+21.2
INV 8.86
G9.94
STA 0+8.1
(TYP)
@ 1/8"/FT MIN
4"Ø SDR 35
EXISTING GRADELINE FOR EXISTING HOUSE JOISTS
CONTRACTOR SHALL HANG NEW SANITARY
CONTINUE TO NEW HOUSE CONNECTION.
0+00
STA
0+21.2
STA
0+38.6
STA
.0
90.00'
90.00'
.0
90.00'
GRADE (TYP)
TO EXISTING
DOWN
3:1 SLOPE
SIZE = 20'L X 5'W X 4'-11"D
MIN REQUIRED LEACHING TANK
CAPACITY = 1,500
MINIMUM REQUIRED SEPTIC TANK
NO. BEDROOMS 5
LOT AREA = ±8,100SF
0200-985.80-01.00-031.000
SCTM NO.
PROPOSED GRADE
SITE PLAN LEGEND
EL:8.7
G9.80
GRADING
LIMI T OF PROPOSED
TANKS
PROPANE
METER
ELEC.
VALVE
WATER
WOOD DECK
ST
LT
G9.52
G9.93
EXISTING GRADE ELEV.
PROPOSED GRADE ELEV.
4" DIA. CLEANOUT
FLOW ARROW
ELBOW DOWN
HOUSE TRAP
SDR 35 @ 1/8"/FT (MIN)
BELOW GRADE 4" DIA.
SDR 35 @ 1/8"/FT (MIN)
ABOVE GRADE 4" DIA.
ST
LT
SEE DETAIL 2/C103
NEW 20'Lx5'Wx4.92'H LEACHING TANK
APPROVED EQUAL. SEE DETAIL 3/C103
MANUFACTURED BY NORWESCO, OR
COMPARTMENT SEPTIC TANK MD#: N43504 AS
NEW 1,500 GAL 13.08'x5.75'x4.25' TWO
COMPLETE FROM THE GROUND
REGULATIONS AND REMOVED
IN ACCORDANCE WITH SCDHS
SYSTEM TO BE DECOMMISSIONED
OF EXISTING SEPTIC
APPROXIMATE LOCATION
DUNE
PROPOSED
CREST OF
LANDWARD
DUNE
PROPOSED
LIMIT OF
LANDWARD
WHICH IS ELEVATION 17.1 IN NGVD 29
5.SITE LOCATED IN FLOOD ZONE VE-16 (NAVD 1988)
VERTICAL DATUM = NGVD 1929
HORIZONTAL DATUM = NAD 1983
DATED 2/26/2015.
PREPARED BY HIRANI ENGINEERING & AND SURVEYING,
4.ALL SURVEY INFORMATION TAKEN FROM SURVEY
SEWAGE DISPOSAL SYSTEM PRIOR TO BACKFILLING.
SCDHS TO SCHEDULE THE INSPECTION OF PIPING AND
3. CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE
ARE CONNECTED TO PUBLIC WATER.
2. NEIGHBORING PROPERTIES WITHIN 150' OF THE LOT
WATER WELL FIELDS WITHIN 150' OF THE PROPERTY.
1. PURSUANT TO SCWA RECORDS, THERE ARE NO PUBLIC
SITE PLAN NOTES:
PROPERTY LINES AND BUILDINGS.
6. 5' MINIMUM DISTANCE FROM ANY PORTION OF TANK TO
5. BOTTOM OF TANK TO BE OPEN.
4. SOIL LINE - 4" DIAMETER, SDR35 PVC, SEALED TO TANK.
SOLID FACE OUT.
3. TOP COURSE OF BLOCK TO BE LAID ON SIDE WITH
BLOCK.
2. ALL BLOCKS TO BE 8"x8"x16" TAPERED CELL CESSPOOL
WITH 1-1/2" INTERLOCK.
1. TOP SLAB - PRECAST 5'x2'x3" REINFORCED CONCRETE
LEACHING TANK NOTES:
(C E
H A
HOUSE
FRAME
3 STY
#135
2,127± SF
SCDHS PERMIT REVIEW 11-21-172
SCTM No.: 0200-985.80-01.00-031.000
SANDY REBUILD
SCDHS No.: R02-17-0192
0+8.1
STA
PIPING TO BE REMOVED
EXISTING SANITARY
3'-10"
SCDHS PERMIT REVIEW 12-21-173
12-21-171 SCDHS COMMENTS
CONSTRUCTION NOTES:
1. NO WORK TO START UNTIL APPROVED PLANS ARE OBTAINED FROM THE BUILDING DEPARTMENT.
2. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. LARGER SCALE DETAILS SHALL
HAVE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
3. IT IS THE INTENTION OF THE DRAWINGS TO PROVIDE FOR A COMPLETE JOB IN ALL RESPECTS AND NO EXTRAS WILL BE ALLOWED FOR MATERIALS AND/OR LABOR REQUIRED TO COMPLETE THE WORK AS INCIDATED.
4. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE AND THE CONTRACTING OFFICER'S OFFICE MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS
SHOWN ON THE DRAWINGS.
5. THESE PLANS ESSENTIALLY CONFORM TO THE FOLLOWING CODES, NEVERTHELESS, WHETHER SPECIFIED OR NOT, ALL CONSTRUCTION MUST CONFORM TO THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE; NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION CODE; NEW YORK STATE
ELECTRICAL AND PLUMBING CODE AND/OR LOCAL CODES WITH JURISDICTION AND VARIANCES.
6. CONSTRUCTION SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES, ORDINANCES, RULES AND REGULATIONS. CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS AND OBTAIN THE CERTIFICATE OF
OCCUPANCY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTION AND MISALIGNMENT ACCORDING
TO CODES, STANDARDS AND GOOD PRACTICE.
8. THE INSTALLATION OF ALL MATERIALS AND PRODUCTS SHALL MEET ALL LOCAL FIRE DEPARTMENT'S REQUIREMENTS AND REGULATIONS, PROOF OF WHICH SHALL BE FURNISHED TO THE FIRE MARSHAL PRIOR
TO THE INSTALLATION OF SUCH MATERIALS AND PRODUCTS.
9. THE CONTRACTING OFFICER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, DEVIATIONS, TECHNIQUES, SEQUENCES, PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, NOR FOR ANY SUBCONTRACTORS OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY
OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
10.THE ENTIRE PREMISES SHALL BE CLEANED OF ALL DEBRIS AND EXCESS MATERIALS TO THE SATISFACTION OF THE CONTRACTING OFFICER, INCLUDING LABELS AND PROTECTIVE COATINGS ON ALL MATERIALS.
11.REQUEST FOR FINAL PAYMENT MUST BE ACCOMPANIED WITH A WAIVER OF LIENS SIGNED BY ALL
SUBCONTRACTORS AND MATERIAL SUPPLIERS IN ADDITION TO THE GENERAL CONTRACTOR.
12.GENERAL CONTRACTOR TO COORDINATE WORK BETWEEN ALL TRADES.
13.THE TERM “CONTRACTOR” IN THESE DRAWINGS AND SPECIFICATIONS SHALL MEAN THE GENERAL
CONTRACTOR, WHO SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF THE WORK OF ALL THE
SUBCONTRACTORS EMPLOYED BY HIM.
14.NO CONTRACTOR SHALL BE BROUGHT ONTO THE SITE WITHOUT FIRST PROVIDING ALL LIABILITY AND COMPENSATION INSURANCE AS MANDATED BY THE LAW AND/OR CONTRACTING OFFICER'S REQUIREMENTS.
IT SHALL BE THE DUTY OF THE CONTRACTOR TO SEE THAT ALL SUBCONTRACTORS ARE COVERED BY THE
REQUIRED INSURANCE AND HE SHALL BE RESPONSIBLE FOR THE SAME.
15.ALL MATERIALS SHALL BE FIRST CLASS AS HEREIN SPECIFIED, AND ALL LABOR SHALL BE DONE IN A
THOROUGH AND WORKMANLIKE MANNER.
16.THE CONTRACTOR SHALL REPLACE WITHIN ONE YEAR, WITHOUT ADDITIONAL CHARGE, ANY WORK
WHICH DEVELOPS DEFECTS DUE TO POOR WORKMANSHIP OR INFERIOR MATERIALS.
17.THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT REQUIRED FOR THE PERFORMANCE OF THE WORK. ALL MATERIALS SHALL BE BROUGHT TO THE SITE BY WATER ACCESS ONLY AND DELIVERED TO APPROVED PIERS/MARAINAS/DOCKS UTILIZING APPROVED HAUL ROUTES. CONTRACTOR SHALL COORDINATE AND SUBMIT DELIVERY PLANS WITH THE CONTRACTING OFFICER FOR REVIEW AN D
APPROVAL PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
18.THE CONTRACTOR SHALL BE LIABLE FOR ANY VIOLATIONS OF THE LAW AND ANY DAMAGE TO
ADJOINING PROPERTY CAUSED BY THE CONTRACTOR AND HIS EMPLOYEES.
19.THE CONTRACTOR TO FOLLOW ALL MANUFACTURER'S SPECIFICATIONS FOR THE INSTALLATION OF ALL
EQUIPMENT, PRODUCTS AND SYSTEMS.
20.THE CONTRACTOR SHALL FURNISH TO THE CONTRACTING OFFICER, A WRITTEN STATEMENT CERTIFYING THAT HIS WORK MEETS THE SPECIFICATIONS AS WELL AS CONFORMING TO THE GOVERNING CODES APPLICABLE AT THE TIME THE WORK WAS PERFORMED, AND CONFORMS TO THE PREVAILING STANDARDS
OF PRACTICE IN THE INDUSTRY.
21. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING CERTIFICATE OF OCCUPANCY UPON COMPLETION
OF PROJECT.
22. CONTRACTOR SHALL HIRE A LICENSED LAND SURVEYOR TO PREPARE FINAL SURVEYS MEETING THE REQUIREMENTS OF SCDHS AND BROOKHAVEN BUILDING DEPARTMENT. SURVEYS SHALL BE SUBMITTED TO
AGENCIES AND OWNER.
23. UTILITIES
A. THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING ALL UTILITY DISCONNECTS AND RECONNECTIONS WITH THE UTILITY COMPANIES, PAYING ALL RELATED FEES AND PROVIDING EVIDENCE OF THE SAME TO
THE TOWN OF BROOKHAVEN AND CONTRACTING OFFICER. THIS INCLUDES POWER, WATER,
TELECOMMUNICATIONS AND GAS. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL UTILITY
PIPING AND/OR WIRES AFTER THEY HAVE BEEN DISCONNECTED AND SAFED OFF BY THE
OWNING UTILITY COMPANY.
B. NOTIFY CONTRACTING OFFICER AND SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES (SCDHS) OF INTENT TO ABANDON SEPTIC SYSTEM. FILE ALL PAPER WORK PAY ALL FEES AND ARRANGE ALL INSPECTIONS REQUIRED BY THE DEPARTMENT. EXPOSE ALL ELEMENTS OF THE SANITARY SYSTEM. PUMP SYSTEM OUT IN A MANNER APPROVED BY SCDHS. SYSTEM PUMP OUT SHALL BE CONDUCTED BY A CONTRACTOR LICENSED TO DO SO. COMPLETELY REMOVE ALL ELEMENTS OF THE SEPTIC SANITARY SYSTEM - PIPING, TANKS AND LEACHING STRUCTURES. PROVIDE CERTIFICATION OF ABANDONMENT TO
THE SCDHS AND THE CONTRACTING OFFICER AT THE COMPLETION OF THE WORK.
DEMOLITION NOTES:
1. REMOVE ALL ITEMS INDICATED ON THESE DRAWINGS.
2. VERIFY ALL EXISTING CONDITIONS. INFORM CONTRACTING OFFICER OF ANY CONDITIONS THAT AFFECT NEW
CONSTRUCTION AS SHOWN ON DRAWINGS.
3. SCOPE OF DEMOLITION AND REMOVAL WORK SHALL NOT BE LIMITED BY THESE DRAWINGS, BUT SHALL
INCLUDE ANY AND ALL WORK NECESSARY TO FACILITATE NEW CONSTRUCTION.
4. ALL WORK OF THIS SECTION SHALL BE ACCOMPLISHED IN STRICT CONFORMANCE WITH OSHA AND THE
RESIDENTIAL CODE OF NEW YORK STATE.
5. REPAIR ALL DAMAGE CAUSED TO ADJACENT CONSTRUCTION BY DEMOLITION WORK AT NO COST TO THE
CONTRACTING OFFICER.
6. CLEAN DEBRIS AND OTHER MATERIALS RESULTING FROM DEMOLITION EACH DAY AND LEAVE PREMISES AND
WORK IN CLEAN CONDITION.
7. CONTRACTOR TO VERIFY THAT ALL UTILITY DISCONNECTS ARE PERFORMED PRIOR TO DEMOLITION IF REQUIRED. INSPECT ALL DECKS FOR ELECTRIC, PLUMBING FIXTURES AND PIPING. NOTIFY CONTRACTING
OFFICER WITH FINDINGS.
8. PILES ARE TO BE REMOVED COMPLETELY FROM THE GROUND AND REMAINING VOIDS BACKFILLED WITH
CLEAN SAND.
9. THE CONTRACTOR HAS THE RIGHT OF SALVAGE FOR ANY BUILDING MATERIALS OR CONTENTS OF THE STRUCTURES. NO GUARANTEE IS MADE THAT SALVAGEABLE MATERIALS THAT ARE PRESENT AT THE TIME OF BID WILL BE PRESENT AT THE TIME OF DEMOLITION AND THE CONTRACTOR SHALL HAVE NO CLAIM OF
MONETARY DAMAGE AS A RESULT OF CHANGES IN SALVAGEABLE MATERIALS OR CONTENTS.
10. ALL DEMOLITION DEBRIS THAT IS REMOVED FROM FIRE ISLAND SHALL BE TRANSPORTED VIA BOAT OR BARGE, THEN RECYCLED OR DISPOSED OF AT A PERMITTED SOLID WASTE FACILITY. CONTRACTOR SHALL PROVIDE RECEIPTS ACCOUNTING FOR THE HAULING, DISPOSAL, RECYCLING, OR SALE OF ALL MATERIAL.
11. THE SITE SHALL BE LEFT IN A RAKE CLEAN CONDITION. NO VISIBLE DEBRIS TO REMAIN ON SITE AT THE
COMPLETION OF PROJECT.
12.PROTECTION OF VEGETATION - NO VEGETATION IS TO BE REMOVED AS PART OF THE DEMOLITION PROCESS.
THE CONTRACTOR SHALL PROTECT EXISTING VEGETATION UNTIL DEMOLITION WORK IS COMPLETED.
DAMAGED VEGETATION WILL BE RESTORED IN KIND AS DIRECTED BY THE CONTRACTING OFFICER.
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
5991-86
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
ND
RC
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
135 NEW YORK AVE
253PW
VAN ALSTYNE RESIDENCE
C-104
SCALE: NONE
GENERAL NOTES
6/30/16
1 USACE CD REVIEW 05-22-17
2 USACE CD REVIEW 08-18-17
1 REVISED PER USACE COMMENTS 08-18-17
3 TOB BD CD PERMIT REVIEW 09-18-17
2 REVISED PER ARCHITECT'S COMMENTS 09-18-17
3 USACE COMMENTS 12-08-17
4 USACE COMMENTS 04-09-18
N
T
I N
G
T
O
N
B
A
B
Y
L
O
N
S
M
I
T
H
T
O
W
N
ISLIP
BROOKHAVEN
R
I V
E
R
H
E
A
D
S
O
U
T
H
A
M
P
T
O
N
E
A
S
T
H
A
M
P
T
O
N
GREAT SOUTH
BAY
NNNN
NNNN
G-001 TITLE SHEET
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
5991-53
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
ND
RC
C-101
SCALE: AS SHOWN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
2/10/2016
EXISTING
CONDITIONS
PLAN AND
SECTION
1 DPW REVIEW 2-10-16
2 USACE REVIEW 6-13-16
3 SCDPW ASSESSMENT REVIEW 7-15-16
4 SCDPW REVIEW 7-27-16
5 TOB DEP PERMIT REVIEW 9-12-16
1 REVISED PER TOB - DEP COMMENT 11-09-16
6 TOB BD PERMIT REVIEW 12-08-16
SCDPW ASSESSMENT REVIEW
12-12-16
190.86' S20°31'52"E
50.10' S65°47'47"W
194.07' N 20°31'52"W
243.00'
243.00'
PEPPER
ID
G E W
A
LK
CENTER WALK
ATLANTIC OCEAN
50.00' N69°28'08"E
190.86' S20°31'52"E
50.10' S65°47'47"W
194.07' N 20°31'52"W
243.00'
243.00'
PEPPER
ID
G E W
A
LK
CENTER WALK
ATLANTIC OCEAN
50.00' N69°28'08"E de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
5991-53
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
ND
RC
C-102
12/23/2015
SCALE: AS SHOWN
PROPOSED
PLAN AND
SECTION
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
1 REVISED PER TOB - DEP COMMENT 11-09-16
2 REVISED PER SCDPW COMMENTS 12-12-16
REVISED AS PER PENDING
ZBA PRESENTATION
01-03-17
4 USACE COMMENTS 04-09-18
UP
UP
UP
16.55
11.09
9.91
11.62
13.20
9.89
16.51
12.17
9.40
8.17
7.65
9.58
10.37
8.77
8.64
9.43
10.08
8.46
14.06
11.64
11.36
W O
L K
S '5
E
.8
S65°47'47"W 50.10'
N '5
W
.0
ATLANTIC OCEAN
50.00' N69°28'08"E
NOTES:
1. TOP SLAB - PRECAST 5'x2'x3" REINFORCED CONCRETE WITH 1-1/2" INTERLOCK.
2. ALL BLOCKS TO BE 8"x8"x16" TAPERED CELL CESSPOOL BLOCK.
3. TOP COURSE OF BLOCK TO BE LAID ON SIDE WITH SOLID FACE OUT.
4. SOIL LINE - 4" DIAMETER, SDR35 PVC, SEALED TO TANK.
6. 5' MINIMUM DISTANCE FROM ANY PORTION OF TANK TO PROPERTY LINES AND
ASSOC.
SECTION A-A
1 GRADE
M
IN
GROUNDWATER
5'-0"
2'-0"
PLAN
C
U R
S E
S
EL.=5.90
OF TANK
BOTTOM
5/8"
(2) 2'-0" X 1'-0" FOR 1,500 GAL TANK
SEPTIC TANK CORNER ANCHOR ASSEMBLY
MID TANK TOP BRACE PLATE DETAIL
N.T.S.
N.T.S.
LIQUID LEVEL
4" PVC
PIPE
SERIAL NUMBER EMBOSSED HERE
CAN BE REFERENCED TO THE
DATE OF MANUFACTURE
5'-9"
13'-1"
8'-1"
4'-1/2"
20" 2
FLOW
FLOW
4" PVC
PIPE
NORWESCO/SNYDER IND.
ST. BONIFACIUS, MN
1500 GALLON CAPACITY
MAX. EARTH COVER 3.0 FT
4" RUBBER GASKET
GROUNDWATER
M I N
14'-0"
NORWESCO/SNYDER IND.
ST. BONIFACIUS, MN
1500 GALLON CAPACITY
MAX. EARTH COVER 3.0 FT
7'-0"
HOLE IN PARTITION
4"Ø PASS-THROUGH
DIVIDER WALL
20" LID
WASHER (2 PLCS)
NUT AND 1/4"X2"
ROD EMBEDDED 9" WITH
5/8"Ø GALV THREADED
WITH 5/8" NUT AND 1/4"X2" WASHER (2 PLCS)
5/8"Ø GALV. THREADED ROD
MID TANK TOP BRACE PLATE (2 PLCS)
WITH NATIVE MATERIAL (2 PLCS)
BACKFILL TANK VOID
4" RUBBER GASKET
CLEARANCE ABOVE TOP OF INLET TEE 1"
COVER WITH 6" DIA. EXTENTION TO GRADE
S A
N
EL.=7.90'
GRADE
EL.=3.90'
WATER
GROUND
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
of the alteration.
alteration, and a specific description followed by his signature, the date of drawing with the notation “altered by” engineer shall affix his seal to the professional engineer, the altering altered under the direction of a drawing in any way. If the drawing is engineer, to alter any item on this direction of a licensed professional person, unless he is acting under the
New York State Education Law for any
It is a violation of Section 7209 of the
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
PS
INLET (FIMI)
TO THE MORICHES
FIRE ISLAND INLET
05/19/2017
SEPTIC SYSTEM
511DP BAYSIDE
NO. REVISIONS DATE
NO. SUBMITTALS DATE
1" = 20'
AP
C-103
SCTM No.:
SANDY REBUILD
SCDHS No.: TBD
0+50 1+00
0+50 1+00
0+00
0+00
SCALE: N.T.S.
TEST HOLE
SCALE: 1" = 20'
SCALE: 1" = 10'-0"
10 0 10 205
SCALE IN FEET
KEY PLAN
SCALE: 1" = 100'
100 0 100 20050
SCALE IN FEET
PROPOSED DUNE
LANDWARD LIMIT OF
PROPOSED DUNE
LANDWARD CREST OF
N
PARCEL
SUBJECT
N
SCALE: 1/2" = 1'-0"
Associates, Inc.
Bayside
RESIDENCE
BAYSIDE
LEACHING TANK DETAIL
SEPTIC TANK DETAIL
PROPOSED GRADE ELEV.
4" DIA. CLEANOUT
FLOW ARROW
ELBOW DOWN
HOUSE TRAP
BELOW GRADE 4" DIA. SDR 35 @ 1/8"/FT (MIN)
ABOVE GRADE 4" DIA. SDR 35 @ 1/8"/FT (MIN)
G9.80'
SITE PLAN LEGEND
B O
U N
D A
R Y
P R
O P
E R
T Y
BOUNDARY
PROPERTY
P R
O P
E R
T Y
B
U N
D A
R Y
±1,084 SF
FRAME HOUSE
2 STY
APPROX. LOCATION
OF TEST HOLE
PERFORMED ON
05/9/2016
ELEVATION 7.90'
EL. 29.52'
2ND FL DECK
EL. 29.52'
2ND FL DECK
.8
.3
S
T W
A L
K
DUNE WALK
P E
P P
E R
ID
G E W
A L
K
JOISTS
HANG PIPE FROM HOUSE
CONNECT TO EXISTING.
COMPLETE FROM THE GROUND
REGULATIONS AND REMOVED
IN ACCORDANCE WITH SCDHS
SYSTEM TO BE DECOMMISSIONED
OF EXISTING SEPTIC
APPROXIMATE LOCATION
V ic t o r ia
R u d t k e
.9
B a y s id e s s o c ia t e s
In c
FF 29.52'
CEHA LINE
SEPTIC TANK
TANK
LEACHING
ELEV 5.90'
BOTTOM OF LEACHING TANK
INV 10.32
G11.74
STA 0+13.4
INV 10.24
G11.70
STA 0+21.6
G11.70
STA 0+37.6
LINE FOR EXISTING HOUSE JOISTS
CONTRACTOR SHALL HANG NEW SANITARY
CONTINUE TO NEW HOUSE CONNECTION.
H O
M E
E X
IS
T
G
E
G E O
F
EXISTING GRADE
(TYP)
@ 1/8"/FT MIN
4"Ø SDR 35
0+37.6
STA
ELEV 3.90'
GROUND WATER
(M
ELEV 6.99'
BOTTOM OF SEPTIC TANK
A
A
INV 10.24
INLET
G11.7
ST
G11.5 LT
0+21.6
STA
DUNE
PROPOSED
LIMIT OF
LANDWARD
DUNE
PROPOSED
CREST OF
LANDWARD
ATLANTIC OCEAN
5 6
FOR TEST HOLE DATA
SEE DETAIL 5/C103
ON 05/9/2016.
511DP BAYSIDE PERFORMED
TEST HOLE LOCATED AT
ST
LT
NORWESCO, OR APPROVED
EQUAL.SEE DETAIL 4/C103
SIZE = 20'L X 5'W X 4'-11"D
MIN REQUIRED LEACHING TANK
CAPACITY = 1,500
MINIMUM REQUIRED SEPTIC TANK
NO. BEDROOMS 5
LOT AREA = 9,623SF
200-986.90-02-64
SCTM NO.
INV 10.57
INLET
INV 10.32
OUTLET
CONCRETE
CAST-IN-PLACE
GRADE
PROPOSED
09-20-17SCDHS PERMIT REVIEW1
COMPARTMENT SEPTIC TANK
NEW 1,500 GAL 13.08Lx5.75'Wx4.25'H TWO
MD#: N43504 AS MANUFACTURED BY
ELEV 6.99'
SEPTIC TANK
BOTTOM OF
GRADE
PROPOSED
GRADE
EXISTING
SITE PLAN
SCALE: N.T.S.
NEW IRREGULAR LEACHING TANK
FOR CONSTRUCTION DETAILS
SEE DETAIL 2/C103
INV 10.57
G11.74
STA 0+00
0+13.4
STA
2'-0"
3'-3"
0+00
STA
SEPTIC SYSTEM PROFILE
200-986.90-02-64
ELEVATION 19.1 IN NGVD 29
5.SITE LOCATED IN FLOOD ZONE VE-18 (NAVD 1988) WHICH IS
VERTICAL DATUM = NGVD 1929
HORIZONTAL DATUM = NAD 1983
& YOUNG , DATED 11/26/2014.
4.ALL SURVEY INFORMATION TAKEN FROM SURVEY PREPARED YOUNG
PIPING AND SEWAGE DISPOSAL SYSTEM PRIOR TO BACKFILLING.
SCHEDULE THE INSPECTION OF
3. CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE SCDHS TO
CONNECTED TO PUBLIC WATER.
2. NEIGHBORING PROPERTIES WITHIN 150' OF THE LOT ARE
WELL FIELDS WITHIN 150' OF THE PROPERTY.
1. PURSUANT TO SCWA RECORDS, THERE ARE NO PUBLIC WATER
SITE PLAN NOTES:
5. BOTTOM OF TANK TO BE OPEN.
4. SOIL LINE - 4" DIAMETER, SDR35 PVC, SEALED TO TANK.
3. TOP COURSE OF BLOCK TO BE LAID ON SIDE WITH SOLID FACE OUT.
2. ALL BLOCKS TO BE 8"x8"x16" TAPERED CELL CESSPOOL BLOCK.
INTERLOCK.
1. TOP SLAB - PRECAST 5'x2'x3" REINFORCED CONCRETE WITH 1-1/2"
LEACHING TANK NOTES:
FURNISH AND INSTALL A PVC SLEEVE FOR THE PIPE.
SERVICE IS ENCOUNTERED, THE CONTRACTOR SHALL
DISTANCE FROM PROPOSED SEPTIC SYSTEM. IF WATER
LOCATION AND MAINTAINING REQUIRED 10' SEPERATION
CONTRACTOR IS RESPONSIBLE FOR VERIFIYING EXACT
APPROXIMATE LOCATION OF EXISTING WATER SERVICE.
DECK PILE LOCATIONS
INSTALLATION WITH
COORDINATE TANK
DECK. CONTRACTOR TO
INSTALLED BELOW
SEPTIC TANK SHALL BE
09-21-172 USACE CD REVIEW
10-18-173 SCDHS PERMIT REVIEW
10-18-171 REVISED PER SCDHS COMMENTS
R02-17-0225
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
D-101
4/7/2017
SCALE: AS SHOWN
PILE/SUBSTRUCTURE
DEMOLITION
PLANS
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
D-102
4/7/2017
SCALE: AS SHOWN
DECK
DEMOLITION
PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
D-103
4/7/2017
SCALE: AS SHOWN
DECK
DEMOLITION
PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
D-104
4/7/2017
SCALE: AS SHOWN
DECK
DEMOLITION
ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-101
4/7/2017
SCALE: AS SHOWN
PILE/SUBSTRUCTURE
PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-102
4/7/2017
SCALE: AS SHOWN
UPPER LEVEL
FRAMING PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-103
4/7/2017
SCALE: AS SHOWN
FIRST FLOOR
DECK PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-104
4/7/2017
SCALE: AS SHOWN
SECOND FLOOR
DECK PLAN
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-105
4/7/2017
SCALE: AS SHOWN
NORTH ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-106
4/7/2017
SCALE: AS SHOWN
EAST ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-107
4/7/2017
SCALE: AS SHOWN
SOUTH
ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-108
4/7/2017
SCALE: AS SHOWN
WEST ELEVATION
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
de Bruin
PROJECT NO. DRAWING NO.
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
RM
RC
A-109
4/7/2017
SCALE: AS SHOWN
SECTION A-A
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-110
SCALE: AS SHOWN
DECK DETAILS I
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
RM
RC
4/7/2017
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
SCALE:
PROJECT:
NO. REVISIONS DATE
PROJECT ENGINEER:
DRAWING TITLE:
FILE NO.
DATE:
DRAWN BY:
CHECKED BY:
It is a violation of Section 7209 of the
New York State Education Law for any person, unless he is acting under the direction of a licensed professional engineer, to alter any item on this drawing in any way. If the drawing is altered under the direction of a professional engineer, the altering engineer shall affix his seal to the drawing with the notation “altered by” followed by his signature, the date of alteration, and a specific description of the alteration.
Civil Engineering & Construction Management
11 Union Avenue Bethpage New York 11714
516.513.1313 516.579.2574 Fax de Bruin Engineering, P.C.
A-111
SCALE: AS SHOWN
DECK DETAILS II
NO. SUBMITTALS DATE
FIRE ISLAND INLET
TO THE MORICHES
INLET (FIMI)
RM
RC
4/7/2017
1 DPW REVIEW 3-23-16
2 NYSDEC & SCDPW REVIEW 06-14-16
PEPPERIDGE WALK
BAYSHORE, NY 11706
511 DP
BAYSIDE ASSOCIATES
5991-53
3 USACE CD REVIEW 05-09-17
4 TOB BD CD PERMIT REVIEW 05-09-17
5 USACE CD REVIEW 09-21-17
1 USACE COMMENTS 04-09-18
CONSTRUCTION NOTES:
1. NO WORK TO START UNTIL APPROVED PLANS ARE OBTAINED FROM THE BUILDING DEPARTMENT.
2. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. LARGER SCALE DETAILS SHALL
HAVE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
3. IT IS THE INTENTION OF THE DRAWINGS TO PROVIDE FOR A COMPLETE JOB IN ALL RESPECTS AND NO EXTRAS WILL BE ALLOWED FOR MATERIALS AND/OR LABOR REQUIRED TO COMPLETE THE WORK AS INDICATED.
4. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE AND THE CONTRACTING OFFICER'S OFFICE MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS
SHOWN ON THE DRAWINGS.
5. THESE PLANS ESSENTIALLY CONFORM TO THE FOLLOWING CODES, NEVERTHELESS, WHETHER SPECIFIED OR NOT, ALL CONSTRUCTION MUST CONFORM TO THE NEW YORK STATE UNIFORM FIRE PREVENTION AND BUILDING CODE; NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION CODE; NEW YORK STATE
ELECTRICAL AND PLUMBING CODE AND/OR LOCAL CODES WITH JURISDICTION AND VARIANCES.
6. CONSTRUCTION SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES, ORDINANCES, RULES AND REGULATIONS. CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS AND OBTAIN THE CERTIFICATE OF
OCCUPANCY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, DISTORTION AND MISALIGNMENT ACCORDING
TO CODES, STANDARDS AND GOOD PRACTICE.
8. THE INSTALLATION OF ALL MATERIALS AND PRODUCTS SHALL MEET ALL LOCAL FIRE DEPARTMENT'S REQUIREMENTS AND REGULATIONS, PROOF OF WHICH SHALL BE FURNISHED TO THE FIRE MARSHAL PRIOR
TO THE INSTALLATION OF SUCH MATERIALS AND PRODUCTS.
9. THE CONTRACTING OFFICER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, DEVIATIONS, TECHNIQUES, SEQUENCES, PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, NOR FOR ANY SUBCONTRACTORS OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY
OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
10.THE ENTIRE PREMISES SHALL BE CLEANED OF ALL DEBRIS AND EXCESS MATERIALS TO THE SATISFACTION OF THE CONTRACTING OFFICER, INCLUDING LABELS AND PROTECTIVE COATINGS ON ALL MATERIALS.
11.REQUEST FOR FINAL PAYMENT MUST BE ACCOMPANIED WITH A WAIVER OF LIENS SIGNED BY ALL
SUBCONTRACTORS AND MATERIAL SUPPLIERS IN ADDITION TO THE GENERAL CONTRACTOR.
12.GENERAL CONTRACTOR TO COORDINATE WORK BETWEEN ALL TRADES.
13.THE TERM “CONTRACTOR” IN THESE DRAWINGS AND SPECIFICATIONS SHALL MEAN THE GENERAL
CONTRACTOR, WHO SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF THE WORK OF ALL THE
SUBCONTRACTORS EMPLOYED BY HIM.
14.NO CONTRACTOR SHALL BE BROUGHT ONTO THE SITE WITHOUT FIRST PROVIDING ALL LIABILITY AND COMPENSATION INSURANCE AS MANDATED BY THE LAW AND/OR CONTRACTING OFFICER'S REQUIREMENTS.
IT SHALL BE THE DUTY OF THE CONTRACTOR TO SEE THAT ALL SUBCONTRACTORS ARE COVERED BY THE
REQUIRED INSURANCE AND HE SHALL BE RESPONSIBLE FOR THE SAME.
15.ALL MATERIALS SHALL BE FIRST CLASS AS HEREIN SPECIFIED, AND ALL LABOR SHALL BE DONE IN A
THOROUGH AND WORKMANLIKE MANNER.
16.THE CONTRACTOR SHALL REPLACE WITHIN ONE YEAR, WITHOUT ADDITIONAL CHARGE, ANY WORK
WHICH DEVELOPS DEFECTS DUE TO POOR WORKMANSHIP OR INFERIOR MATERIALS.
17.THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT REQUIRED FOR THE PERFORMANCE OF THE WORK. ALL MATERIALS SHALL BE BROUGHT TO THE SITE BY WATER ACCESS ONLY AND DELIVERED TO APPROVED PIERS/MARAINAS/DOCKS UTILIZING APPROVED HAUL ROUTES. CONTRACTOR SHALL COORDINATE AND SUBMIT DELIVERY PLANS WITH THE CONTRACTING OFFICER FOR REVIEW AN D
APPROVAL PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
18.THE CONTRACTOR SHALL BE LIABLE FOR ANY VIOLATIONS OF THE LAW AND ANY DAMAGE TO
ADJOINING PROPERTY CAUSED BY THE CONTRACTOR AND HIS EMPLOYEES.
19.THE CONTRACTOR TO FOLLOW ALL MANUFACTURER'S SPECIFICATIONS FOR THE INSTALLATION OF ALL
EQUIPMENT, PRODUCTS AND SYSTEMS.
20.THE CONTRACTOR SHALL FURNISH TO THE CONTRACTING OFFICER, A WRITTEN STATEMENT CERTIFYING THAT HIS WORK MEETS THE SPECIFICATIONS AS WELL AS CONFORMING TO THE GOVERNING CODES APPLICABLE AT THE TIME THE WORK WAS PERFORMED, AND CONFORMS TO THE PREVAILING STANDARDS
OF PRACTICE IN THE INDUSTRY.
21. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL TEMPORARY STRUCTURE (I.E:-
STEPS, RAILINGS, RAMPS, ETC.) AS PART OF THE INSTALLATION OF NEW STRUCTURE.
22. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING CERTIFICATE OF OCCUPANCY UPON COMPLETION
OF PROJECT
23. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE DUNE
24. CONTRACTOR SHALL HIRE A LICENSED LAND SURVEYOR TO PREPARE FINAL SURVEYS MEETING THE REQUIREMENTS OF THE SUFFOLK COUNTY SCDHS AND THE BUILDING DEPARTMENT. SURVEYS SHALL BE
SUBMITTED TO AGENCIES AND CONTRACTING OFFICER.
25. UTILITIES
A. THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING ALL UTILITY DISCONNECTS AND RECONNECTIONS WITH THE UTILITY COMPANIES, PAYING ALL RELATED FEES AND PROVIDING EVIDENCE OF THE SAME TO
THE TOWN OF BROOKHAVEN AND CONTRACTING OFFICER. THIS INCLUDES POWER, WATER,
TELECOMMUNICATIONS AND GAS. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL UTILITY
PIPING AND/OR WIRES AFTER THEY HAVE BEEN DISCONNECTED AND SAFED OFF BY THE
OWNING UTILITY COMPANY.
B. NOTIFY CONTRACTING OFFICER AND SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES (SCDHS) OF INTENT TO ABANDON SEPTIC SYSTEM. FILE ALL PAPER WORK PAY ALL FEES AND ARRANGE ALL INSPECTIONS REQUIRED BY THE DEPARTMENT. EXPOSE ALL ELEMENTS OF THE SANITARY SYSTEM. PUMP SYSTEM OUT IN A MANNER APPROVED BY SCDHS. SYSTEM PUMP OUT SHALL BE CONDUCTED BY A CONTRACTOR LICENSED TO DO SO. COMPLETELY REMOVE ALL ELEMENTS OF THE SEPTIC SANITARY SYSTEM - PIPING, TANKS AND LEACHING STRUCTURES. PROVIDE CERTIFICATION OF ABANDONMENT TO
THE SCDHS AND THE CONTRACTING OFFICER AT THE COMPLETION OF THE WORK.
DECK FRAMING NOTES:
1. WOOD DESIGN AND MATERIAL SELECTION BASED ON THE FOLLOWING CODES:
a. NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION (NDS 2005)
b. ASCE 7-10 - MINIMUM LOADS FOR BUILDINGS AND OTHER STRUCTURES
c. INTERNATIONAL RESIDENTIAL CODE (IRC)
d. DCA-6 - PRESCRIPTIVE RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE.
2. ALL FRAMING LUMBER SHALL BE SOUTHERN PINE OR DFI OR HFI - SELECT STRUCTURAL OR APPROVED
EQUAL.
3. ALL LUMBER SHALL BE IDENTIFIED BY THE GRADE MARK OF, OR CERTIFICATE OF INSPECTION ISSUED BY, AN
APPROVED LUMBER GRADING OR INSPECTION BUREAU OR AGENCY.
4. ALL LUMBER SHALL BE PRESERVATIVELY TREATED WITH AN APPROVED PROCESS IN ACCORDANCE WITH
AMERICAN WOOD PROTECTION ASSOCIATION STANDARDS.
5. ALL LUMBER IN CONTACT WITH THE GROUND SHALL BE APPROVED PRESERVATIVE TREATED WOOD
SUITABLE FOR GROUND CONTACT.
6. ALL CUTS SHALL BE FIELD-TREATED WITH AN APPROVED PRESERVATIVE, SUCH AS COPPER NAPHTHENATE.
7. ALL NAILS SHALL MEET THE REQUIREMENTS OF ASTM F1667. THREADED NAILS INCLUDE HELICAL (SPIRAL) AND ANNULAR (RING-SHANK) NAILS. WOOD SCREWS SHALL MEET THE REQUIREMENTS OF ANSI/ASME B18.6.1. BOLTS AND LAG SCREWS SHALL MEET THE REQUIREMENTS OF ANSI/ASME B18.2.1. ALL NAILS, SCREWS AND BOLTS SHALL BE HOT DIPPED GALVANIZED PER ASTM SPECIFICATION SECTION ASTM A153/A153M.
8. ALL CONNECTORS (JOIST HANGERS, POST ANCHORS, ETC., SHALL BE AS MANUFACTURED BY SIMPSON ZMAX
COATING OR APPROVED EQUAL).
9. TOE-NAILING OF JOISTS IS PROHIBITED. USE MINIMUM 16 GAUGE JOIST HANGERS TO FRAME TO STRINGERS.
10.ALL CONNECTORS SHALL BE SIMPSON STRONG-TIE CONNECTORS OR APPROVED EQUAL. CONTRACTOR TO REFER TO “SIMPSON STRONG-TIE” C-HW09 HIGH WIND RESISTANT CONSTRUCTION PRODUT MANUAL FOR INFORMATION REGARDING ANCHORS NECESSARY FOR ALL CONNECTIONS (EVEN IF NOT SPECIFIED IN
THE DRAWINGS).
11.ALL FLASHING SHALL BE CORROSION-RESISTANT STAINLESS STEEL, GRADE 304 OR 316 OF MINIMUM NOMINAL 0.019-INCH THICKNESS OR APPROVED NON-METALLIC MATERIAL. ALUMINUM SHOULD NOT BE USED IN DIRECT CONTACT WITH LUMBER TREATED WITH PRESERVATIVES THAT CONTAIN COPPER, SUCH AS
ACQ, COPPER AZOLE OR ACZA.
12.DECK SHALL NOT BE USED OR OCCUPIED UNTIL FINAL INSPECTION AND APPROVAL IS OBTAINED.
13.ABOVE-GROUND PRESERVATION TREATMENT SHALL BE UC3B OR EQUAL.
14.GROUND CONTACT PRESERVATION TREATMENT SHALL BE UC4A OR EQUAL.
15.WHERE PARTIAL REMOVAL OF DECK PLANKS ARE PERMITTED, NEW DECK PLANKING SHALL MATCH
EXISTING IN MATERIAL TYPE AND COLOR.
16.THE CONTRACTOR IS TO VERIFY ALL MEASUREMENTS IN THE FIELD AND ANY DISCREPANCIES ARE TO BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION.
17.THE CONTRACTOR SHALL PROTECT AND BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO EXISTING
FACILITIES WITHIN OR ADJACENT TO THE PROJECT SITE.
18.ALL POSTS SHALL BE SPF OR DF#1, EITHER 6X6 OR 8X8, AS NOTED ON PLANS. PRESSURE TREATED IN
ACCORDANCE WITH THE APWA UC5A.
19.ALL PILES SHALL BE SPF OR DF#1, NOMINAL 12' TAPPERED BUTT PILE, AS NOTED ON PLANS. PRESSURE
TREATED IN ACCORDANCE WITH AWPA UC5A.
20.ALL PILES SHALL HAVE A 20-TON MINIMUM ULTIMATE BEARING CAPACITY.