W912DS-16-B-0016-AMENDMENT_0009.pdf

PDF 23 KB Posted

Attached to
Eisenhower Hall Phase 3 Federal contract opportunity
Solicitation number
W912DS-16-B-0016
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

W912DS-16-B-0016 - Amendment 0009

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Purpose of this Amendment is to:

a. Answ er bidders questions for information only.

b. Incorporate Revised Draw ings

c. Change the bid due date

The bid opening due date has changed to 23 September at 2PM ESTs.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0016

X 9B. DATED (SEE ITEM 11)

23-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Sep-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 22-Sep-2016 03:00 PM to 23-Sep-2016 02:00 PM.

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

AMENDMENT 0009

FY16 Eisenhower Hall Phase III US Military Academy, West Point NY

W921DS-16-B-0016

Amendment 0009

AMENDMENT 0009 to DRAWINGS and SPECIFICATIONS for Eisenhower Hall Phase III, W912DS-16-B-0016.

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- None

3. The following DRAWINGS have been ADDED:

- A-601

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

BIDDERS RFI’s

NOTE: Bidders must acknowledge receipt of this amendment by the date specified in the bid (or as amended) by one of the following methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below. FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND

TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. Q. - See Spec 08-8000 Paragraphs 1.04. a thru d: Verify this design criteria is for wind loads only.

A. - Yes, these criteria are for wind loads only. Refer to blast schedule on revised drawing A-611 issued with Amendment 6 for the Blast Design Loads on the blast doors Doors must also comply with wind load criteria indicate in paragraph 1.04

2. Q. - Can 'Wingard' be used to design glass for blast pressures specified? If so, please provide the design parameters for blast resistant glass design to be used with the 'Wingard' computer program.

A.- With regard to the design parameters:

Refer to the blast schedule on drawing A-611 and the following:

The glazing shall be design for Low Level of Protection (LLOP) where

2.1 Glazing will fracture, potentially come out of the frame, but at reduced velocity, does not present a significant injury hazard. (Very low hazard rating).

2.2 Doors will experience non-catastrophic failure, but will have permanent deformation and may be inoperable as per Category III.

3. Q. - WINGARD is a software for glazing assessment per GSA/ISC criteria. DOD projects typically use SBEDS-W. Both software employ SDOF methodology. Which should we use?

A. - Contractor may use WINGARD software but must demonstrate that he meets the criteria on blast schedule.

4. Q. - See Spec 08-8000 Paragraph 1.04.d: Full vision blast doors require the use of laminated tempered glass. This paragraph states annealed or heat treated. Please delete or explain further.

A. - Blast resistant glass shall meet the design criteria as scheduled on drawings. Heat treated, tempered or annealed is up to the contractor

5. Q. - Do full vision doors require insulated glass units?

A. - Yes.

6. Q. - Door arrangements 901 and 932 are listed as D3 flush on door schedule, but elevation on Dwg. A-611 notes these as full glass. Which is correct?

A. - 901 and 932 are flush as noted on the schedule. Detail 1 on drawing A-611 is reissued herein to show these doors as flush as opposed to full glass

(End of Summary of Changes)