Amendment 0004

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE51324337

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

1. Bid opening date remains 20 July 2015 at 2:00 P.M. Eastern Standard Time (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278

2. Answ er Questions to prospective bidders for informational purposes.

Please see Continuation Page

NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by the follow ing method:

in the space provided on the SF 1442, by separate letter by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0011

X 9B. DATED (SEE ITEM 11)

19-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jul-2015

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-15-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

3. By this amendment paragraph three of Section 01 11 00.00 40; 1.1 Summary has been revised to the following:

Thirty-seven (37) calendar days have been allowed to complete the required dredging. The time for contract completion of each option will be determined by allowing a rate of one (1) calendar day for each 8,000 cubic yards removed. The work is anticipated to be performed within the approximate time period of September 2015 to 14 November 2015.

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

Answer Bidders Questions. Responses to bidder inquiries are provided "for information purposes only" and does not revise solicitation, plans and specifications.

QUESTION # 1: In Amendment 2, a question was answered regarding the wage rates for security guards and bid item No 0004 “Security Guards” was deleted. Does this deletion indicate that there is no longer a requirement for the beach security guard described in Section 00 73 00 - 1.2 COMMENCEMENT, PROSECUTION, &

COMPLETION OF WORK?

ANSWER # 1: There is still a requirement to provide an unarmed Site Control Services including a 4x4 vehicle to patrol the dredging site from the beach for 24 hours per day, 7 days per week. Site Control Service personnel cannot be the SSHO and cannot have other duties. Ensuring that the beach remains closed off to the public in the location of the dredging work will be their sole responsibility and they will conform with the requirements of the National Park Service, as explained in Amendment 0002 and section 00 73 00 of the Solicitation.

QUESTION # 2: Section 01 11 00.00 40 – Summary of Work of the specifications states that “The work is anticipated to be performed within the approximate time period of September 2015 to December 2015.” Further, the NJ DEP permit dated May 22, 2015 states that “1. Dredging is prohibited from November 15 through April 15 in any given year to protect overwintering blue crab (12/1 to 4/15) and to incoming adult winter flounder.” The two provided time periods conflict with each other. Can the Government provide clarification on when dredging is prohibited and when dredging is allowed to take place?

ANSWER # 2: By this amendment the specification language in Section 01 11 00.00 40; 1.1 Summary of Work has been changed to meet the requirements set forth in the NJDEP Water Quality Certificate. As per the issued NJDEP Water Quality Certificate, dredging is prohibited 15 November 2015 through 15 April 2016.

QUESTION # 3: Can the Government confirm that award of the contract will be based solely on items 1 through 3 of the revised Bid Schedule found on pages 2 and 3 of Amendment 0002, and that pages 2 and 3 of Amendment 0002 replace pages 3 through 5 of the original solicitation?

ANSWER # 3: Based on the changes in this Amendment and the previous three Amendments, the award of this contract will be based on Bid Items 0001 through 0004 (which includes one option bid item). Pages 2 through 4 of Amendment 0003 display the bid schedule to be used.

QUESTION # 4: Section 35 20 23 – Dredging of the specifications state that “Based upon analysis of two sediment testing results with a total of five (5) core samples from Sandy Hook Channel, the grain size characteristics of the proposed dredge material are: 18.6% gravel, 80.9% sand, 0.5% silt/clay.” Individual testing results and core

W912DS-15-B-0011

sample locations are not provided in the specifications. Will the Government provide the location of the five (5) core samples taken, tide-corrected boring logs relative to MLLW and associated geotechnical results, including grain size distributions for each sample taken?

ANSWER # 4: See attached.

QUESTION # 5: The entire HARS disposal given on the contract drawings is a very large area. Depending on where dredged material is to be placed, overall towing cycle times will vary greatly. To accurately measure towing distances to the provided disposal area(s), can the Government please give coordinates of the desired HARS disposal section(s) and identify on the HARS drawing which section(s) that material is to be disposed in? If the location is unknown to the Government at this time, then please identify the section of HARS that should be used for estimating purposes (Government and Contractors).

ANSWER # 5:

PRA #5:

NW corner - 40 degrees 23.216 minutes N Latitude 73 degrees 50.718 minutes W Longitude

SE corner - 40 degrees 22.135 minutes N Latitude 73 degrees 49.319 minutes W Longitude

A placement grid, or grids, will be within the area bounded by those coordinates.

Also, See attached map.

QUESTION # 6: Can USACE please provide the after-dredge survey xyz file from the W912DS-13-B-0022 project completed in December 2013?

ANSWER # 6: See attached.

(End of Summary of Changes)