AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is:
1. Bid opening date remains 20 July 2015 at 2:00 P.M. Eastern Standard Time (EST) at 26 Federal Plaza, Room 1841, New York N.Y. 10278
2. By this amendment, the Bid Schedule has been revised to the attached.
3. By this amendment, Sheet 2 of 3 of Plan Sheet has been revised to the attached.
Please see Continuation Page NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by the follow ing method:
in the space provided on the SF 1442, by separate letter by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0011
X 9B. DATED (SEE ITEM 11)
19-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2015
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-15-B-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00 10 00 - SOLICITATION/CONTRACT FORM
AMENDMENT 0003
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
FOB: Destination
MILSTRIP: W16ROE51324337
PURCHASE REQUEST NUMBER: W16ROE51324337
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 220,755 Cubic
Yard
Dredging Area
FFP
Dredging (to -35 feet MLLW + 2 feet allowable overdepth), Transportation and Placement (Sheet 3 of 3 of the contract drawings) Removal of material (220,755 CY) except ledge rock lying above the plane of 35' below mean lower low water, plus a 2 foot allowable overdepth from Sandy Hook Channel, New York Harbor, Federal Navigation Project with placement of dredged material at the Historic Area Remediation Site (HARS). ESTIMATED QUANTITY.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
Black Box Monitoring Unit
FFP
See section 35 20 23.10 18.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 220,755 Cubic
Yard OPTION Option 1
FFP
Transportation and placement of Material from Dredging Area- Item 0002 at the specified Sand Borrow Area shown in the contract drawings. This line item represents the difference (positive or negative) in price between the Basic Work (line item 0002) and Option 1 (line item 0004).
FOB: Destination
NET AMT
TOTALS
TOTAL BASE BID (CLINS 0001 THRU 0003)…..………………...……….. $ ___________________
TOTAL BID PRICE (CLINS 0001 THRU 0004)…..………………...……….. $ ___________________
NOTES
NOTE 1: Bidders must bid on all items. Failure to bid on all items will be cause for rejection of the bid as non-responsive.
NOTE 2: Award of contract will be based on the responsible and responsive bidder with the lowest total price for the total of the CLINS 0001-0004.
NOTE 3: All bidders are hereby advised that the quantities for placement in the price schedule are estimated and based on the survey data collected on 11 March 2015.
NOTE 4: The Government may reject a bid as non–responsive if the prices bid are materially unbalanced between line items and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low bid.
NOTE 5: Option 1 represents the difference in price (positive or negative) between the Basic Work with HARS placement, as specified, and the placement of the material in the Basic Work at the Sand Borrow Area, noted in Option 1.
NOTE 6: Should Option 1 be awarded, it will be awarded at the time the Basic Work is awarded.
NOTE 7: Should Option 1 be awarded, only dredging with placement at the Sand Borrow Area will be required.
NOTE 8: Should no Options be awarded, only dredging with HARS placement will be required.
NOTE 9: It is the contractor’s responsibility to comply with all conditions and requirements of the identified disposal site.
NOTE 10: Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions, or attachments made by the bidder himself may render the bid non-responsive and may be cause for its rejection.
The following have been added by full text:
AMENDMENT 0003
4. Include FAR 52.217-5
52.217-5 -- Evaluation of Options.
As prescribed in 17.208(c), insert a provision substantially the same as the following:
Evaluation of Options (Jul 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)
5. By this amendment 0003 , the fifth paragraph of Section 00 73 00; 1.2 Commencement, Prosecution, & Completion of Work has been revised to:
The maximum quantity available to be dredged and transported to the HARS or Sand Borrow Area is 220,755 CY from the Sandy Hook Channel, based on the Plans and Specs Survey performed in March 2015.
6. By this amendment 0003, the first paragraph of Section 01 11 00.00 40; Summary has been revised to:
The work to be performed under this project consists of providing the labor, equipment, and materials to perform maintenance dredging of the Sandy Hook Channel with disposal of the material at the Historical Area Remediation Site (HARS)or Sand Borrow Area as shown in the Contract Documents prepared by the US Army Corps of Engineers, New York District. The Contractor will be solely responsible for the coordination and compliance with the transportation, offloading and placement site requirements.
7. By this amendment 0003 , the fifth paragraph of Section 01 57 20.00 10; Protection of Environmental Resources has been revised to:
Site Description/Background: Endangered species observer will report to the Contracting Officer (actual date will depend on the contract arrangements between the District and the Contractor). Approximately 220,755 CY of material total may be dredged from Sandy Hook Channel and placed at the HARS or Sand Borrow Area.
8. By this amendment 0003, the fourth paragraph of Section 35 20 23.10 18; 1.4 Monitoring Equipment has been revised to:
A self-contained "black box" unit must be installed on all container vessels, and must be capable of recording on a 24-hour basis, latitude and longitude positions of the container vessel, through DGPS technology, and container vessel draft, using a water pressure sensor, at variable sampling rates ranging from one position and draft value every 6 seconds to one position and draft value every ten minutes, according to NY District requirements. Container vessels used for transport of fine-grained, muddy dredged material to the HARS or Sand Borrow Area must include fore and aft draft sensors and fore and aft bin level sensors. Container vessels used to transport fine-grained, muddy dredged material to upland placement /treatment sites must include on bin level sensor, and one draft sensor.
9. By this amendment 0003 , the fourth paragraph of Section 35 20 23.10 18; 1.6 Backup Equipment has been revised to:
Laptop computer container vessel monitoring software must also include map displays with selectable scales that allow DMIs to view the dredging site, New York Harbor area and New York Bight, HARS, Sand Borrow Area and designated placement grids and coordinates. The container vessel monitoring software must graphically display placement grids developed for the project and allow viewing of the position of the transport vessel and/or container vessel throughout the placement trip.
10. By this amendment 0003 , the eighth paragraph of Section 35 20 23.10 18; 1.13 Placement of Dredged Material has been revised to:
All of the provisions, guidelines, requirements, and instructions (PGRIs)In this section of the contract specification must be completed/complied with before any dredged material may be placed at a designated ocean placement site.
Many of the PGRIs must be completed/complied with prior to the start of dredging. Any misplaced (e.g. mis-dumped, short-dumped)dredged material deemed to constitute a potential hazard to navigation by the Corps will be the sole liability of the contractor to remove, as directed by the Corps. This would include, for example, placement of dredged material in a navigation channel that results in a mound or causes an area of shallower water within the channel; or any dredged material placed above a permitted depth associated with the HARS or Sand Borrow Area.
The contractor will assume all expenses and liabilities associated with creating mounds of dredged material above a permitted depth at an artificial reef site, HARS or Sand Borrow Area and expenses and liabilities associated with bringing such mounds below permitted depths.
11. By this amendment 0003 , the first paragraph of Section 35 20 23.10 18; 1.14 Ocean Placement Locations for HARS Suitable Material has been revised to:
The Government has identified the Historic Area Remediation Site (HARS) or Sand Borrow Area for placement of dredged material, approved for ocean disposal, removed under this contract. However, barges that contain less than 25% non-rock material (i.e., vessels which contain 75% or more rock material) should not be transported to the HARS or Sand Borrow Area unless approved by NY District, U.S.E.P.A., and any regulating agency (Non-rock material is defined as material that is less than 2.5 inches in diameter.)
12. By this amendment 0003 , the second through the fourth paragraph of Section 35 20 23.10 18; 1.15 Historic Area Remediation Site (HARS) have been revised to:
The contractor shall perform dredged material placement at specific locations within the HARS or Sand Borrow Area. Details of the placement location within the HARS or Sand Borrow Area, for HARS-suitable dredged material, will be provided at the DMTPM. Dredged material placement must not occur anywhere outside of the HARS or Sand Borrow Area, in HARS buffer zones, in shipwreck buffer zones, in the HARS "No Discharge Zone", or in any other area of the HARS or Sand Borrow Area determined by NY District to be off-limits for dredged material placement. Details of HARS or Sand Borrow Area placement will be provided to the contractor at the
DMTPM.
The contractor will also use exact placement criteria set by the New York District Corps of Engineers. All placement of dredged material within the HARS or Sand Borrow Area will occur in strict accordance with the placement requirements and locations given at the DMTPM, and any future updates when provided by USACE.
All non-rock material approved for ocean disposal, excluding floating debris and trash, shall be transported to the HARS or Sand Borrow Area, unless otherwise directed.
13. By this amendment 0003, the fourth paragraph of Section 35 20 23.10 18; 1.16 General Requirements; ALL
PLACEMENT ACTIVITIES MUST BE RECORDED, AND REQUIREMENTS ADHERED TO, AS SPECIFIED
BELOW has been revised to:
DMI must submit reports of all placement activities authorized by this contract on the basis of one report for each container vessel of dredged material within two (2) hours after each placement event at the HARS or Sand Borrow Area.
14. By this amendment 0003 , the first paragraph of Section 35 20 23.10 18; 1.17 Placement of Dredged Material Suitable for Ocean Disposal, General has been revised to:
The transport vessel captain and the DMI must jointly determine and agree, prior to the departure of the transport vessel from the dredging site, that the forecasted weather and sea conditions at the expected time of placement of dredged material within the HARS or Sand Borrow Area will:
15. By this amendment 0003, paragraph d. of Section 35 20 23.10 18; 1.18 Protocol for Placement of Dredged Material at Open Water Sites has been revised to:
d. After ensuring that all inspections have been performed at the dredging site, and compliance with all provisions and requirements associated with container vessel loading and use has been met, container vessels must be brought to the designated grid cell, or coordinates, of the HARS, or other designated placement location, using the DGPS navigation systems of the transport vessel and the container vessel monitoring software onboard the transport vessel.
Placement in the appropriate location and container vessel draft immediately prior to container vessel door opening, must be documented by the DMI using the container vessel monitoring software while the container vessel position and draft information are monitored automatically by the container vessel monitoring system. Container vessels should be towed no faster than 2 knots, unless weather/sea conditions require higher speed to maintain safe and reliable navigation. Lengths of towlines should be no longer than 200 feet, unless weather/sea conditions require longer tow lengths to maintain safe and reliable navigation. Regardless of the conditions at the time of placement, tow lines must not be longer than 500 feet at the time of placement. DMI must measure the distance from the transport vessel to the container vessel at the time of placement using the hand-held laser range finder and record the value on the TPL form. During each trip to the HARS or Sand Borrow Area, the dredged material contained in a container vessel must be able to be placed (initiation of placement) within individual grid cells as small as 100 feet wide and 100 feet long. Dredged material must never be placed outside of designated grid areas of the HARS or Sand Borrow Area.
16. By this amendment 0003, first paragraph within paragraph l. of Section 35 20 23.10 18; 1.18 Protocol for Placement of Dredged Material at Open Water Sites has been revised to:
l. To help ensure that dredged material is transported and placed at the HARS or Sand Borrow Area in accordance with the requirements described above, the following checklist has been prepared. Items in the checklist must be reviewed by the DMI at the dredging site, while underway, and at the HARS or Sand Borrow Area. Any item on the checklist that receives a "NO" answer must be reported immediately to the Notification List. If the "NO" answer is related to the container vessel monitoring equipment and/or software, the DMMESC must also be notified immediately. These discrepancies must be noted on the TPLF associated with the trip using the letter-number code associated with each item. Each placement trip to the HARS or Sand Borrow Area must use a checklist, to be completed by the DMI working aboard the transport vessel, using the container vessel monitoring software or by hand. A supplemental report must be filed and faxed to NY District at (212) 264-1463 if space on the TPLF is not sufficient to explain the discrepancy. Checklist copies must be signed and dated by the DMI and placed in a file. All original, signed checklists associated with this project must be submitted to the NY District on a weekly basis for the duration of the project. Checklists must be hand delivered or mailed to:
(End of Summary of Changes)