CP14_Plans_100_.pdf

PDF 1 MB Posted

Attached to
Emergency Bulkhead Rehabilitation, Caven Pt. Marine Terminal, Jersey City, NJ
Solicitation number
W912DS-13-B-0029
Issued by

About this file

Plans

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. ALL SOIL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE INSTALLED IN ACCORDANCE WITH THE STANDARDS FOR

TURBIDITY CONTROL, SOIL EROSION AND SEDIMENT CONTROL IN NEW JERSEY AND HUDSON COUNTY, AND WILL BE IN PLACE

PRIOR TO ANY DISTURBANCE OF EXISTING CONDITIONS, AND MAINTAINED UNTIL THE PERMANENT WORKS ARE COMPLETE

AND ACCEPTED.

2. ANY DISTURBED AREA SHALL IMMEDIATELY RECEIVE TEMPORARY TURBIDITY CONTROL, SOIL EROSION AND SEDIMENT

CONTROL WORKS. THE PRIMARY CONTROL WORKS ARE HAY BALES TIED TOGETHER SUBJECT REGULATORY APPROVALS.

3. THE SITE SHALL AT ALL TIMES BE MAINTAINED SO THAT ALL STORM WATER RUNOFF IS DIVERTED TO SOIL EROSION AND

SEDIMENT CONTROL FACILITIES. ALL CONSTRUCTION ACTIVITIES IN WATERWAYS SHALL BE PROTECTED WITH MINIMUM

FLOATING TURBIDITY BARRIER INSTALLATIONS AND WATER SURFACE SKIMMING EQUIPMENT TO REMOVE SURFACE WASTES.

4. ALL SEDIMENTATION STRUCTURES (INLET FILTERS AND SEDIMENT BASINS) WILL BE INSPECTED AND MAINTAINED DAILY.

5. STOCKPILES SHALL NOT BE PERMITTED.

6. A STABILIZED CONSTRUCTION ACCESS SURFACE WILL NOT BE REQUIRED. HOWEVER, THE CONTRACTOR SHALL BE

REQUIRED TO MAINTAIN VEHICLES WHEELS CLEAR OF MUD AND DIRT.

7. BEFORE DISCHARGE POINTS BECOME OPERATIONAL, ALL STORM DRAINAGE OUTLETS WILL BE STABILIZED AS REQUIRED.

8. PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES.

9. ALL DEWATERING OPERATIONS MUST BE DISCHARGED DIRECTLY INTO A SEDIMENT FILTER AREA. THE FILTER SHOULD BE

COMPOSED OF A FABRIC OR APPROVED MATERIAL.

10. ALL CONTROL EQUIPMENT AND/OR SEDIMENT BASINS WILL BE CLEANED WHEN THE CAPACITY HAS BEEN REDUCED BY 50%.

A CLEAN OUT DETAIL WILL BE PREPARED, SUBMITTED FOR APPROVAL.

11. PRIOR TO PERFORMING ANY ACTIVITIES IN WATERWAYS, THE CONTRACTOR SHALL INSTALL TURBIDITY AND SEDIMENT

CONTROL WORKS. THE CONTRACTOR SHALL HAVE SKIMMING EQUIPMENT ON SITE AT ALL TIMES. THE COUNTY SOIL

CONSERVATION DISTRICT MAY REQUEST ADDITIONAL MEASURES TO PROTECT THE WATERWAYS.

12. DURING AND AFTER CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE MAINTENANCE OF TURBIDITY

CONTROL, SOIL EROSION AND SEDIMENT CONTROL WORKS.

13. THE COUNTY SOIL CONSERVATION DISTRICT MAY REQUEST ADDITIONAL MEASURES TO MINIMIZE ON-SITE OR OFF-SITE

TURBIDITY, SOIL EROSION AND SEDIMENT CONTROL PROBLEMS DURING CONSTRUCTION.

14. PRIOR TO ANY LAND DISTURBANCE, THE CONTRACTOR SHALL ATTEND A PRE-CONSTRUCTION MEETING.

15. THE COUNTY SOIL CONSERVATION DISTRICT MUST BE NOTIFIED, IN WRITING, AT LEAST 72 HOURS PRIOR TO ANY LAND OR

WATER DISTURBANCE, AND THE SCHEDULING OF A PRE-CONSTRUCTION MEETING.

16. APPLY TEMPORARY STABILIZATION MEASURES AS REQUIRED.

17. APPLY PERMANENT STABILIZATION MEASURES AS REQUIRED.

EROSION AND SEDIMENT CONTROL NOTES