W912DS-12-R-0003_-_Amendment_0005.pdf

PDF 187 KB Posted

Attached to
Job Order Contract (JOC) for construction and maintenance projects at the Seneca Army Depot Activity, Romulus, NY
Solicitation number
W912DS-12-R-0003
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
Table_C3.pdf PDF
W912DS-12-R-0003_-_Amendment_0004.pdf PDF
W912DS-12-R-0003_-_Amendment_0003.pdf PDF
W912DS-12-R-0003_-_Amendment_0002.pdf PDF
W912DS-12-R-0003_Amendment_0001.pdf PDF
W912DS-12-R-0003.pdf PDF
specs_Seneca_JOC_Feb_2012.pdf PDF
CTC_Seneca_JOC_Feb_2012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Amend Specifications to clarify requirement for eGordian softw are.

2. Amend Solicitation Provision 52.228-1 and Contract Clause 52.228-15.

3. Provide answ ers to questions, for informational purposes only.

4. Incorporate revised w age determination.

5. Extend the proposal due date to from 13 December 2012 to 18 December 2012 at 2:00PM EST.

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 32

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Dec-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-12-R-0003

X 9B. DATED (SEE ITEM 11)

27-Sep-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Dec-2012

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-12-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

Job Order Contract Seneca Army Depot Activity

AMENDMENT 0005

1. The following changes shall be made to the Solicitation/RFP:

The following is added to RFP Section 00110 – II. Price Proposal:

A. Specification for Gordian Group software The Contractor shall be required to purchase licenses to The Gordian Group's Internet based JOC management system, eGordian(r), for use by Seneca Army Depot and the Contractor(subsequently referred to here as “Gordian software”). The contractor shall use the software for preparing and submitting proposals. The Government may use the software to prepare estimates, receive electronic proposals from the Contractor and manage the JOC process. The Contractor will need a broadband Internet connection to access eGordian(r).

eGordian(r) requires a yearly subscription for each user. The cost of subscriptions for the Contractor shall be paid for by the Contractor on the anniversary of the contract. The estimated cost of the first year is $15,885.00, which includes all set‐up fees, one (1) government user license, a minimum of one

(1) user license for the contractor, Construction Task Catalog(r) and Technical Specifications. Additional user subscriptions may be added for an estimated cost of $1,390.00 each with annual renewals estimated at $895.00 each. These prices include the Proposal Preparation and Submittal Modules.

Software Training

The Contractor shall be required to purchase The Gordian Group's eGordian(r) software training for the Government and Contractor staff at an estimated cost of $5,500.

The Contractor may submit an invoice for payment of the initial cost of $21,385 upon award of the contract. Future renewal costs and any additional licensed required by the contractor will then be included as part of the owner’s coefficient and not invoiced for separately.

2. Q&A – W912DS‐12‐R‐0003

Q1. Is there a scheduled site visit or pre‐proposal conference scheduled for this

SOL?

A1. No Site Visit or Pre‐proposal Conference was scheduled.

Q2. Is Progen going to be used as the proposal processing software from the Gordian Group?

A2. Yes, Gordian Group’s Progen software is to be used for this Job Order Contract.

Q3. The contractor is to submit their price proposal on the solicitation page 3 of 93, along with other items. The tem “Contractors Coefficient %” is used. Is this term “Contractors Coefficient %” what is described as “The Adjustment Factors” as used in the “Construction Task Catalog” specification 00 – 2.

A3. The “Contractors Coefficient %” and the “Adjustment Factor” referred to in the Construction Task Catalog are the same.

Q4. Is there an existing JOC in place at Seneca Army Depot Activity? If so, is the current JOC contractor a verified SDVOSB?

If there is a current JOC in place, can the USACE provide the current‐year coefficients.

How often are the Construction Task Catalogs updated? The version included in the Solicitation is dated February 2012.

Can Past Performance Questionnaires be electronically mailed to you, or do you prefer original + four copies mailed via USPS, as required for the Proposal?

A4. No, there is not currently an existing JOC in place at SEDA. PPQs can be sent by the offeror in their proposal or by the client, emailed to the Contract Specialist at matthew.lubiak@usace.army.mil.

Q5. Page. 65‐66 ‐ 1.4.3.1. refers to Table C‐2. This Table does not appear in the Solicitation.

Page. 65‐66 ‐ 1.4.3.1. refers to pages C‐7 through C‐9. These pages do not appear in the Solicitation.

Page 66 ‐ 1.4.3.2 states a list of abbreviations for UPB is included as attachment to Solicitation. Other than Wage Determination, there are no attachments to Solicitation.

Page 66 ‐ 1.4.7 refers to Table C‐3. This Table does not appear in the Solicitation.

A5. Table C‐2 is provided as an attachment to this Amendment. The Unit Price Book (UPB) is the “Construction Task Catalog”.

Q6. On Pg 7, Item 1.)a. states: “ Explain plan for interaction between the Government and Contractor staff. Provide an organizational chart to clearly delineate the lines of authority and leadership of key personnel and project managers. Outline the proposed corporate and on‐site staff, their resumes, responsibilities and authorities with regard to this contract and how they will interface with each other.”

Can you please clarify what is meant by: “Outline the proposed corporate and on‐ site staff, their resumes, responsibilities and authorities with regard to this contract and how they will interface with each other.” How do we outline a resume? What are you looking for exactly?

A6. Offerors must specify how are they planning on running the contract, and who their key personnel are, such as who runs the company, who will run the contract and work efforts in the field if different for the work and for the contract, and their qualifications/resumes as specified.

This factor evaluates their qualifications; this needs a description of how they are planning to do the work and how experienced and knowledgeable their personnel are to evaluate the technical qualifications of bidding contractors to perform the work.

For example, does the president of the company manage all work, or will there be a project manager, and/or site supervisor, multiple supervisors/managers for different work such as utilities or construction or the same supervisor/manager for all, sub‐contractors for some or all of the work, and what kind of experience all have to perform the work.

Q7. The RFP states that a complete QC Plan must be included with the proposal.

The page limit for the proposal is 75 pages. Our QC Plan, itself, is 74 pages.

Do you really want us to include an entire QC Plan and, if so, can it be exempt from page count?

A7. The QC Plan does not count toward the page limit.

Q8. In preparing the proposal we see that you have asked for a payment and performance bond, which we can provide upon award of particular projects.

We also noticed you are asking for a "Bid guarantee". It is not clear to us what you are asking for here as there is not a specific project we are bidding on.

Would you please clarify this for us?

A8. Payment and Performance Bonds will be required of the awardee for the minimum guaranteed amount, which is $20,000. Additional Payment and performance bonds may be required for individual Job/Task Orders. See amended clause 52.228‐15 included in this amendment.

Bid guarantee is required for the minimum guaranteed amount of the basic contract, which is $20,000. See amended provision 52.228‐1 included in this amendment.

3. Revised Wage Determination:

NOTE: The following three DOL Wage Determinations are applicable to the basic Job Order Contract (JOC) and Task Orders issued under the JOC. For individual task orders, the applicable determination shall be the one, either Highway, Heavy or Building, that represents a preponderance of the work for that task order.

NY120040 08/17/2012 NY40 Highway NY120051 06/29/2012 NY51 Heavy NY120089 08/17/2012 NY89 Building

Affirmative Action GOALS:

For Minorities: 5.9% For Women: 6.9%

General Decision Number: NY120040 10/26/2012 NY40

Superseded General Decision Number: NY20100042

State: New York

Construction Type: Highway

County: Seneca County in New York.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 02/10/2012 2 02/17/2012 3 04/13/2012 4 04/27/2012 5 05/04/2012 6 05/25/2012 7 06/22/2012 8 07/06/2012 9 08/17/2012 10 10/26/2012

CARP0277-019 07/01/2011

Rates Fringes

CARPENTER........................$ 26.90 16.88

FOOTNOTE:

a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas.

* ELEC0840-006 06/01/2012

REMAINDER OF COUNTY

Rates Fringes

ELECTRICIAN......................$ 29.30 18.25

ELEC1249-003 05/02/2011

Rates Fringes

LINE CONSTRUCTION: Lineman

(LIGHTING AND TRAFFIC SIGNAL

Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 25.21 7.5%+25.5 Groundman Truck Driver (tractor trailer unit)......$ 35.72 7.5%+25.5 Groundman Truck Driver......$ 33.62 7.5%+25.5 Lineman & Technician........$ 42.02 7.5%+25.5 Mechanic....................$ 33.62 7.5%+25.5

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 01/01/2012

Rates Fringes

Line Construction:

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):

Flagman....................$ 24.79 15.00+6.5%+a Groundman digging machine operator...................$ 37.19 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 35.12 15.00+6.5%+a Groundman Truck driver.....$ 33.06 15.00+6.5%+a Lineman and Technician.....$ 41.32 15.00+6.5%+a Mechanic...................$ 33.06 15.00+6.5%+a Overhead transmission line work (where other trades are or have been involved):

Flagman....................$ 26.29 15.00+6.5%+a Groundman digging machine operator...................$ 39.44 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 37.25 15.00+6.5%+a Groundman truck driver.....$ 35.06 15.00+6.5%+a Lineman and Technician.....$ 43.82 15.00+6.5%+a Mechanic...................$ 35.06 15.00+6.5%+a Substation:

Cable Splicer..............$ 45.45 15.00+6.5%+a Flagman....................$ 24.79 15.00+6.5%+a Ground man truck driver....$ 33.06 15.00+6.5%+a Groundman digging machine operator...................$ 37.19 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 35.12 15.00+6.5%+a Lineman & Technician.......$ 41.32 15.00+6.5%+a Mechanic...................$ 33.06 15.00+6.5%+a Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 46.87 15.00+6.5%+a Flagman....................$ 25.57 15.00+6.5%+a Groundman Digging Machine

Operator...................$ 38.35 15.00+6.5%+a Groundman Truck Driver (tractor-trailer unit).....$ 36.22 15.00+6.5%+a Groundman Truck Driver.....$ 34.09 15.00+6.5%+a Lineman & Technician.......$ 42.61 15.00+6.5%+a Mechanic...................$ 34.09 15.00+6.5%+a

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 27.99 4.43 + 3% Groundman..................$ 12.48 4.43 + 3% Installer Repairman- Teledata Lineman/Tecnician- Equipment Operator.........$ 26.57 4.43 + 3% Tree Trimmer................$ 21.64 7.36+3%

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day.

* ENGI0545-002 07/01/2012

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 33.10 21.60+a GROUP 2.....................$ 32.22 21.60+a GROUP 3.....................$ 28.94 21.60+a GROUP 4.....................$ 37.10 21.60+a GROUP 5.....................$ 36.10 21.60+a GROUP 6.....................$ 35.10 21.60+a GROUP 7.....................$ 34.45 21.60+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday.

IRON0060-009 05/01/2012

Rates Fringes

Ironworkers:

Structural, Ornamental, Reinforcing, Pre-cast Concrete Erector, Machinery Mover & Rigger, Fence Erector, Stone Derrickman, Welder, Sheeter, Sheeter Bucker-up..$ 27.00 21.15

LABO0435-007 07/01/2012

Rates Fringes

Laborers:

HEAVY AND HIGHWAY:

GROUP 1....................$ 25.96 15.55

GROUP 2....................$ 26.66 15.55

GROUP 3....................$ 26.86 15.55

GROUP 4....................$ 27.69 15.55

GROUP 5....................$ 27.66 15.55

FOOTNOTES:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has worked the working day before and the working day after the holiday.

HEAVY AND HIGHWAY LABORER CLASSIFICATIONS

GROUP 1: Flaggers GROUP 2: Laborers GROUP 3: Rakers, drillers, pipelayers and torch operators GROUP 4: Blasters GROUP 5: Hazardous waste removal.

PAIN0004-020 05/01/2012

Rates Fringes

Painters:

BUILDING CONSTRUCTION

Brush & Roll, Drywall Taping/Finishing...........$ 23.00 16.09 Spray, Sandblasting, Structural Steel...........$ 23.50 16.09

HEAVY & HIGHWAY

CONSTRUCTION

Bridges....................$ 31.00 16.10

PLUM0013-005 05/01/2012

FAYETTE, JUNIUS, ROMULUS, SENECA FALLS, TYRE, VARICK AND

WATERLOO TOWNSHIPS

Rates Fringes

Plumber and Steamfitter..........$ 31.08 18.58

PLUM0267-008 05/01/2012

REMAINDER OF COUNTY

Rates Fringes

Plumber, Pipefitter, Steamfitter (Including HVAC work)............................$ 30.36 20.67

TEAM0317-008 06/01/2012

Rates Fringes

Truck drivers:

GROUP 1.....................$ 21.89 18.81+a GROUP 2.....................$ 21.69 18.81+a

FOOTNOTE: a. Paid Holidays: New Years Day; Memorial Day;

Independence Day; Laobr Day; Thanksgiving Day; Christmas Day

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Pick-ups; panel trucks; flatboy materials trucks (straight jobs); single axle dump trucks; dumpsters;

receivers; greasers; truck tireman, tandems; batch truck;

mechanics; semi-trailers; low-boy trucks; asphalt distributor trucks; agitator; mixer trucks and dumpcrete type vehicles; truck mechanic, fuel truck

GROUP 2: Specialized earth moving equipment- euclid type or similar off-highway equipment, where not self-loaded;

straffle (Ross) carrier; self-contained concrete unit, Off-highway tandem back dump; twin engine equipment; double hitched equipment shere not self loaded.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: NY120051 10/26/2012 NY51

Superseded General Decision Number: NY20100057

State: New York

Construction Type: Heavy

Counties: Allegany, Cattaraugus, Cortland, Schuyler, Seneca, Steuben, Tompkins, Wyoming and Yates Counties in New York.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/06/2012 1 02/10/2012 2 04/13/2012 3 04/27/2012 4 06/08/2012 5 06/22/2012 6 06/29/2012 7 09/28/2012 8 10/26/2012

ELEC0041-005 05/28/2012

CATTARAUGUS (Townships of Ashford, East Otto, Ellicottville, Farmersville Freedom, Franklinville, Lyndon, Machias, Mansfield, New Albion, Otto, Perrysburg, Persia and Yorkshire)

WYOMING (Townships of Arcade, Attica, Bennington, Eagle, Java, Orangeville, Sheldon and Wetherfield)

CABLE SPLICER....................$ 33.64 3%+20.25

ELECTRICIAN......................$ 32.14 3%+20.25

ELEC0041-006 05/28/2012

CATTARAUGUS (Townships of Ashford, East Otto, Ellicottville, Farmersville Freedom, Franklinville, Lyndon, Machias, Masnfield, New Albion, Otto, Perrsburg, Persia and Yorkshire) WYOMING (Townships of Arcade, Attica, Bennington, Eagle, Java, Orangeville, Sheldon and Wetherfield

Communications System

CABLER......................$ 9.00 14.05+3%

INSTALLER...................$ 15.55 14.05+3%

MASTER TECHNICIAN...........$ 23.76 14.05+3%

SOUND WIREMAN...............$ 21.60 14.05+3%

Work covers low voltage construction, installation, maintenance, and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX fiber optic cable and equipment, railroad communications, micro waves, V-Sat, bypass, CATV, WAN (wide area networks); LAN (local area networks) and ISDN (integrated systems digital network). Also, installation of sound systems, nurses call systems, intercom systems, staff registry/locating/signaling systems, antenna systems and associated devices; installation of security systems and apparatus, and cabling from VDT's to computers. This work does not apply to new construction, or to the installation of raceway systems and boxes for the above work.

FOOTNOTE:

a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the day after Thanksgiving, Christmas Day.

ELEC0043-006 06/01/2012

CORTLAND AND TOMPKINS COUNTIES

Rates Fringes

ELECTRICIAN......................$ 32.05 3%+19.67

ELEC0086-003 05/28/2012

WYOMING (Remainder of County)

Rates Fringes

ELECTRICIAN......................$ 30.60 5%+18.72

ELEC0106-001 01/01/2011

ALLEGANY (Townships of Alma, Belfast, Belmont, Bolivar, Coneadea, Centerville, Clarksville, Cuba, Friendship, Genesee, New Hudson, Rushford, Scio and Wirt CATTARAUGUS (Remainder of County)

CABLE SPLICER....................$ 29.50 16.18

ELECTRICIAN......................$ 29.75 17.20 + 6%

ELEC0139-002 06/04/2012

ALLEGANY (Remainder of County), SCHUYLER (Remainder of County)

AND STEUBEN COUNTIES

ELECTRICIAN......................$ 32.00 20.21

ELEC0241-002 06/01/2011

SENECA (Townships of Covert and Lodi) AND SCHUYLER (Townships of Catharine, Cayuta, Hector)

ELECTRICIAN......................$ 31.50 21.15+3%

* ELEC0840-003 06/01/2012

SENECA (Remainder of County) AND YATES COUNTY

Rates Fringes

ELECTRICIAN......................$ 29.30 18.25

ELEC1249-003 05/02/2011

Rates Fringes

LINE CONSTRUCTION: Lineman

(LIGHTING AND TRAFFIC SIGNAL

Including any and all Fiber

Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 25.21 7.5%+25.5 Groundman Truck Driver (tractor trailer unit)......$ 35.72 7.5%+25.5 Groundman Truck Driver......$ 33.62 7.5%+25.5 Lineman & Technician........$ 42.02 7.5%+25.5 Mechanic....................$ 33.62 7.5%+25.5

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 01/01/2012

Rates Fringes

Line Construction:

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):

Flagman....................$ 24.79 15.00+6.5%+a Groundman digging machine operator...................$ 37.19 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 35.12 15.00+6.5%+a Groundman Truck driver.....$ 33.06 15.00+6.5%+a Lineman and Technician.....$ 41.32 15.00+6.5%+a Mechanic...................$ 33.06 15.00+6.5%+a Overhead transmission line work (where other trades are or have been involved):

Flagman....................$ 26.29 15.00+6.5%+a Groundman digging machine operator...................$ 39.44 15.00+6.5%+a

Groundman truck driver (tractor trailer unit).....$ 37.25 15.00+6.5%+a Groundman truck driver.....$ 35.06 15.00+6.5%+a Lineman and Technician.....$ 43.82 15.00+6.5%+a Mechanic...................$ 35.06 15.00+6.5%+a Substation:

Cable Splicer..............$ 45.45 15.00+6.5%+a Flagman....................$ 24.79 15.00+6.5%+a Ground man truck driver....$ 33.06 15.00+6.5%+a Groundman digging machine operator...................$ 37.19 15.00+6.5%+a Groundman truck driver (tractor trailer unit).....$ 35.12 15.00+6.5%+a Lineman & Technician.......$ 41.32 15.00+6.5%+a Mechanic...................$ 33.06 15.00+6.5%+a Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 46.87 15.00+6.5%+a Flagman....................$ 25.57 15.00+6.5%+a Groundman Digging Machine Operator...................$ 38.35 15.00+6.5%+a Groundman Truck Driver (tractor-trailer unit).....$ 36.22 15.00+6.5%+a Groundman Truck Driver.....$ 34.09 15.00+6.5%+a Lineman & Technician.......$ 42.61 15.00+6.5%+a Mechanic...................$ 34.09 15.00+6.5%+a

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 27.99 4.43 + 3% Groundman..................$ 12.48 4.43 + 3% Installer Repairman- Teledata Lineman/Tecnician- Equipment Operator.........$ 26.57 4.43 + 3% Tree Trimmer................$ 21.64 7.36+3%

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day.

ENGI0017-003 07/01/2012

CATTARAUGUS AND WYOMING COUNTIES

Rates Fringes

Power equipment operators:

Pavers......................$ 31.86 19.49+a

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has worked the day before and the day after the holiday.

* ENGI0545-009 07/01/2012

CORTLAND, SENECA AND TOMPKINS COUNTIES

Rates Fringes

Power Equipment Operator Pavers......................$ 32.22 21.60+a

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day provided the employee has worked the working day before and the working day after the holiday.

* ENGI0832-003 07/01/2012

ALLEGANY, SCHUYLER, STEUBEN AND YATES COUNTIES

Rates Fringes

Power equipment operators:

Paver.......................$ 34.40 21.60+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day provided the employee works the woring day before and the working day after the holiday.

SUNY2000-002 01/11/2000

Rates Fringes

CARPENTER........................$ 20.61 7.49

CEMENT MASON/CONCRETE FINISHER...$ 17.45 7.90

Laborers:

Pipelayers..................$ 17.79 6.70 Rakers......................$ 17.04 6.30 Unskilled...................$ 17.20 6.63

Power equipment operators:

Backhoes....................$ 22.08 11.31 Bulldozers..................$ 22.28 11.79 Excavators..................$ 22.63 12.14 Loaders.....................$ 22.10 11.44 Rollers.....................$ 21.08 11.73 Tractors....................$ 20.57 10.95

TRUCK DRIVER (DUMP)..............$ 16.94 7.11

WELDERS - Receive rate prescribed for craft performing cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: NY120089 10/26/2012 NY89

Superseded General Decision Number: NY20100104

State: New York

Construction Type: Building

County: Seneca County in New York.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/06/2012 1 01/27/2012 2 04/06/2012 3 04/13/2012 4 05/04/2012 5 05/25/2012 6 06/22/2012 7 07/20/2012 8 08/17/2012 9 10/26/2012

BOIL0175-002 01/01/2012

Rates Fringes

BOILERMAKER......................$ 28.84 22.15

BRNY0003-026 07/01/2011

ROCHESTER CHAPTER

Rates Fringes

BRICKLAYER.......................$ 27.07 16.28

TILE FINISHER....................$ 23.22 12.85

CARP0277-022 07/01/2011

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 26.90 16.88

ELEC0241-006 06/01/2011

Twps of Covert and Lodi

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring for Phones, Alarms and HVAC Temperature Controls & Installation of Alarms, Phones and Computers)............$ 31.50 21.15+3%

* ELEC0840-009 06/01/2012

Remainder of County

ELECTRICIAN (Including Low

Voltage Wiring for Phones, Alarms and HVAC Temperature Controls & Installation of Alarms, Phones and Computers)............$ 29.30 18.25

ELEV0027-005 01/01/2012

Rates Fringes

ELEVATOR MECHANIC................$ 42.57 23.535+a+b

FOOTNOTE:

a. 8 PAID HOLIDAYS: New Year's Day, Memorial day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

b. Employer contributes 8% basic hourly rate for employees with 5 or more years of service or 6% basic hourly rate for employees with 6 months to 5 years of service as vacation pay credit .

* ENGI0545-016 06/01/2012

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe; Concrete Pump, Truck Mounted; Forklift, Loed & Lull & Other Rough Terrain Type; Excavator;

Blast or Rotary Drill (Truck or Cat Mounted);

Front End Loader (4 cy & over).......................$ 24.54 21.52+a Bobcat/Skid Loader;

Bulldozer; Forklift, With or Without Attachments Over 10 Ton; Drill Rigs, Tractor Mounted; Self Contained Hydraulic Bench Drill; Front End Loader (Under 4 cy)................$ 28.30 21.52+a Crane.......................$ 30.68 21.52+a Forklift, With or Without Attachments 10 Ton & Under; Crane Oiler..........$ 30.18 21.52+a

CRANE OPERATOR RATES

All Cranes from 30 - 64 ton - add $.50 to base crane rate Lattice Boom Cranes 65 ton (capacity) & over - add $1.75 Hydraulic Cranes 100 ton (capacity) & over - add $1.75 Hydraulic Cranes 80 ton (capacity) to 99 ton (capacity) - add $1.25

Hydraulic Cranes 65 ton (capacity) to 79 ton (capacity) - add $1.10

Boom Length Premium (In addition to above - including jib)

150 Feet & Over - add $1.75 200 Feet & Over - add $2.75 300 Feet & Over - add $3.75 Tower Crane - add $1.50 Pile Driver With Boom or Leads 100 Feet & Over - add $1.75

FOOTNOTE:

a. PAID HOLIDAYS: New Year's day, Memorial day, Independence Day, Labor day, Thanksgiving Day and Christmas Day, provided the employee has worked five consecutive working days before the holiday and the working day after the holiday

IRON0060-015 05/01/2012

Rates Fringes

IRONWORKER (Fence Erection)......$ 27.00 21.15

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 27.00 21.15

LABO0435-012 05/01/2012

Rates Fringes

LABORER

Grade Checker; Brick Mason Tender; Cement/Concrete Mason Tender; Mortar Mixer; Roof Tearoff.........$ 24.30 14.28 Landscape...................$ 21.15 14.28

PAIN0004-047 05/01/2007

Rates Fringes

PAINTER

Airless Spray & Conventional................$ 20.49 10.79 Brush.......................$ 19.98 10.79 Drywall Finishing/Taping....$ 20.24 10.79 Steel Spray (New or Old Construction, Non-weather Protected)..................$ 21.19 10.79

PAIN0677-001 05/01/2012

GLAZIER..........................$ 23.80 16.70

PLUM0013-006 05/01/2012

Twps of Fayette, Junius, Romulus, Seneca Falls, Tyre, Varick & Waterloo

PIPEFITTER.......................$ 31.08 18.58

PLUM0267-010 05/01/2012

Towns of Covert & Lodi

Rates Fringes

PIPEFITTER.......................$ 30.36 20.67

ROOF0195-003 06/01/2012

Rates Fringes

ROOFER

Including Modified Bitumen, Rubber and Shake & Shingle...................$ 25.30 16.27

SFNY0669-006 04/01/2012

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 29.83 20.37

SHEE0046-002 04/30/2012

Rates Fringes

SHEET METAL WORKER...............$ 30.02 20.43

* SUNY2009-028 09/30/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 20.32 8.84

INSULATOR - PIPE & PIPEWRAPPER...$ 27.72 9.00

LABORER: Asbestos Abatement (Removal from Ceilings, Floors, and Walls)...............$ 18.70 8.28

LABORER: Asphalt Shoveler.......$ 20.89 8.95

LABORER: Common or General......$ 20.25 7.50

LABORER: Pipelayer..............$ 21.06 14.30

OPERATOR: Auger.................$ 21.19 15.85

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 23.59 9.95

OPERATOR: Roller................$ 24.15 17.01

PAINTER: Roller.................$ 18.30 9.57

PLUMBER..........................$ 27.15 12.47

ROOFER...........................$ 21.00 11.32

TILE SETTER......................$ 24.02 0.00

TRUCK DRIVER: Dump Truck........$ 16.00 2.62

WELDERS - Receive rate prescribed for craft performing cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 13-Dec-2012 02:00 PM to 18-Dec-2012 02:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be $20,000.00 .

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

52.228-15

52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

(a) Definitions. As used in this clause--

Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .