Plans(Replace 60 psi Line) - Edited 12-15-10.pdf

PDF 20 MB Posted

Attached to
Steam Line and Plumbing Upgrades at Stratton VA Medical Center, Albany, N. Y.
Solicitation number
W912DS-11-B-0002
Issued by

About this file

Plans and Specs 2

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

e3enmrt3 Polygon e3enmrt3 Callout Option 1 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3

Text Box

GENERAL NOTES:

1. At all locations where piping passes through a floor or a rated shaft, provide a 2 hour UL listed fire stopping system

2010-02-12 ASB2-ASB10 Certified.pdf
FILE000008.pdf
FILE000007.pdf
FILE000006.pdf
FILE000005.pdf
FILE000004.pdf
FILE000003.pdf
FILE000002.pdf
FILE000001.pdf
FILE000000.pdf
2010-02-12 M1-M20 Certified.pdf
FILE000019.pdf
FILE000018.pdf
FILE000017.pdf
FILE000016.pdf
FILE000015.pdf
FILE000014.pdf
FILE000013.pdf
FILE000012.pdf
FILE000011.pdf
FILE000010.pdf
FILE000009.pdf
FILE000008.pdf
FILE000007.pdf
FILE000006.pdf
FILE000005.pdf
FILE000004.pdf
FILE000003.pdf
FILE000002.pdf
FILE000001.pdf
FILE000000.pdf

File details come from the government source that posted it. Updated .