Plans(Replace 60 psi Line) - Edited 12-15-10.pdf
PDF 20 MB Posted
- Solicitation number
- W912DS-11-B-0002
About this file
Plans and Specs 2
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
e3enmrt3 Polygon e3enmrt3 Callout Option 1 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3 e3enmrt3
Text Box
GENERAL NOTES:
1. At all locations where piping passes through a floor or a rated shaft, provide a 2 hour UL listed fire stopping system
| 2010-02-12 ASB2-ASB10 Certified.pdf |
| FILE000008.pdf |
| FILE000007.pdf |
| FILE000006.pdf |
| FILE000005.pdf |
| FILE000004.pdf |
| FILE000003.pdf |
| FILE000002.pdf |
| FILE000001.pdf |
| FILE000000.pdf |
| 2010-02-12 M1-M20 Certified.pdf |
| FILE000019.pdf |
| FILE000018.pdf |
| FILE000017.pdf |
| FILE000016.pdf |
| FILE000015.pdf |
| FILE000014.pdf |
| FILE000013.pdf |
| FILE000012.pdf |
| FILE000011.pdf |
| FILE000010.pdf |
| FILE000009.pdf |
| FILE000008.pdf |
| FILE000007.pdf |
| FILE000006.pdf |
| FILE000005.pdf |
| FILE000004.pdf |
| FILE000003.pdf |
| FILE000002.pdf |
| FILE000001.pdf |
| FILE000000.pdf |
File details come from the government source that posted it. Updated .