W912DS-10-B-0006 Amendment 0001.pdf

PDF 22 KB Posted

Attached to
Maintenance Dredging of Arthur Kill Reach of the NY & NJ Channels Federal Navigation Project
Solicitation number
W912DS-10-B-0006
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
W912DS-10-B-0006-0002.pdf PDF
AK10 Specs.pdf PDF
AK10 Plans.pdf PDF
W912DS-10-B-0006 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE00335389

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to :

a. Provide revised specif ications in Sections 00800 and 012200

b. Provide the follow ing Questions and Answ ers for Information Purpose Only.

c. Bid Opening date w ill remain 23 April 2010 at 2:00 P.M.

Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods. In the space provided on the SF1442, by separate letter, or by telegram, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE

LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Apr-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-10-B-0006

X 9B. DATED (SEE ITEM 11)

24-Mar-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Apr-2010

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-10-B-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Amendment 0001

Maintenance Dredging of Arthur Kill Reach

New York and New Jersey Channels

1. The purpose of this amendment is to revise the 2nd paragraph of Paragraph 1.2, Section 00800, revise the last paragraph of Paragraph 1.3.1.2, Section 012200, and too address the questions submitted below:

a. In Section 00800, Paragraph 1.2 delete the words “Any options will be exercised, at the

Government’s discretion, within five (5) calendar days of receipt by the Contractor of the Notice to Proceed…” and change to read “Any options will be exercised, at the Government’s discretion, within fifteen (15) calendar days of receipt by the contractor of the Notice to Proceed…”

b. In Section 012200, Paragraph 1.3.1.2 delete the words “The total quantity of excavated material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope of the theoretical cross sections indicated. No allowance will be made for overdepth excavation or for the removal of any material outside the required slope lines unless authorized” and change to read “The total quantity of dredged material for which payment will be made, will be by computing the volume between the bottom surface shown by soundings of the last survey made before dredging and the bottom surface shown by soundings of a survey made as soon as practicable after the entire work specified has been completed. No allowance will be made for the removal of any material outside the required slope lines unless authorized.”

2. Questions and Answers submitted below:

a. Reference: Bid Schedule Note 3 and Section 00800, paragraph 1.2 Note 3 states “Any options will be exercised 15 calendar days after receipt of the Notice to Proceed” and paragraph 1.2 states “Any options will be exercised within 5 calendar days of the Notice to Proceed”.

Question: Bid Note 3 and paragraph 1.2 contradict one another. How many days after the Notice to Proceed will options be exercised?

Answer: Options will be exercised 15 calendar days after receipt of the Notice to Proceed, if they are exercised at all.

b. Reference: Section 00902, Attachment A-2 and Section 352023, paragraph 1.5 Section 00902 Attachment A-2 states “The maximum volume of material to be removed (including overdredge) as part of this dredging cycle is approximately 75,000 cubic yards” and paragraph 1.5 states “The total amount of material to be removed shall be 83,780 cubic yards”.

Question: Attachment A-2 is the Water Quality Certification letter which limits the amount of material to 75,000 cubic yards; however, the total estimated quantity exceeds the limit. If all options are awarded will the Contractor be allowed to dredge more than 75,000 cubic yards?

Answer: Yes.

c. Reference: Section 012200, paragraph 1.3.1.2 Paragraph 1.3.1.2 states on page 2 “The total amount of material removed and paid for under the contract (bid Item Nos. 0002, 0003, 0004 and 0005) will be measured by the cubic yard dredged. Measurement of the number of cubic yards in place will be made by computing the volume between the bottom surface shown by soundings of the last survey made before dredging and the bottom surface shown by soundings of a survey made as soon as practicable after the entire work specified has been completed.” and later states on page 3 “The total quantity of excavated material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope of the theoretical cross section indicated.”

Question: The sentences above contradict one another. Please clarify.

Answer: The last paragraph of Paragraph 1.3.1.2, Section 012200 has been revised (see paragraph 2 above) to be consistent with measurement portion of this section. .

3. Bid opening date will remain 23 April 2010 at 2:00 P.M. EST.

(End of Summary of Changes)