NOTES:

1. CONTRACT REQUIRES DEMOLITION OF LOCKMASTER'S HOUSE (BUILDING NO. 3)

IN ITS ENTIRETY INCLUDING ALL ASBESTOS AND LEAD-BASED PAINT.

2. APPENDIX A IN THE SPECIFICATIONS IS THE ASBESTOS CONTAINING MATERIALS

(ACMs) SURVEY REPORT OF THE LOCKMASTER'S HOUSE. THE CONTRACTOR IS

REQUIRED TO COMPLY WITH FEDERAL, NEW YORK STATE AND LOCAL LAWS,

RULES AND REGULATIONS FOR THE REMOVAL AND DISPOSAL OF ACMs.

3. APPENDIX B IN THE SPECIFICATIONS IS THE LEAD-BASED PAINT SURVEY REPORT

OF THE LOCKMASTER'S HOUSE. THE CONTRACTOR IS REQUIRED TO COMPLY

WITH FEDERAL, NEW YORK STATE AND LOCAL LAWS, RULES AND REGULATIONS

FOR THE REMOVAL AND DISPOSAL OF LEAD-BASED PAINT.

4. THE CONTRACTOR SHALL DEVELOP A COMPOSITE PLAN FOR THE DEMOLITION

OF LOCKMASTER'S HOUSE IN ITS ENTIRETY INCLUDING ALL ASBESTOS AND

LEAD-BASED PAINT PLUS SIDEWALK, STEPS AND SLAB REMOVAL AND DISPOSAL

PLUS COMPACTING THE BACKFILL TO BRING THE DEPRESSION OF DEMOLITION

AREAS TO MEET EXISTING PERIMETER SURFACES INCLUDING 4-INCHES OF TOPSOIL

WITH SEEDED RESTORATION OF THE AREA AT THE LOCKMASTER'S HOUSE SITE.

5. THE CONTRACT REQUIRES ASBESTOS ABATEMENT OF ACMs IN BUILDINGS NOS.

2, 6 & 7. THE EXISTING CONDITIONS ARE MOSTLY SHOWN ON ANNOTATED

PHOTOGRAPHS THAT ARE LOCATED IN THE SPECIFICATIONS. THE CONTRACTOR

IS REQUIRED TO REMOVE AND DISPOSE ALL ACM IN BUILDINGS NOS. 2, 6 & 7.

6. THE CONTRACTOR MAY ELECT TO REMOVE ONLY THE ASBESTOS IN ITS

ENTIRETY FROM THE PIPING, DUCT AND OTHER COMPONENTS AND RE-INSTALL

EQUIVALENT NON-ACM INSULATION OR FIREPROOFING. AS AN EQUAL

ALTERNATIVE, THE CONTRACTOR MAY ELECT TO REMOVE AND DISPOSE ASBESTOS

WITH PIPING OR DUCT AND THEN RE-INSTALL INSULATED PIPING AND DUCTS. THE

CONTRACTOR IS REQUIRED TO RE-INSTALL ALL SUPPORTS AND APPURTENANCES

TO RESTORE THE PLUMBING, HEATING AND VENTILATING SYSTEMS IN THEIR

ENTIRETIES. THE UNIT PRICES FOR RESTORING THE WORKS IN BUILDINGS NOS. 2, 6

& 7 SHALL BE THE SAME FOR EITHER ALTERNATIVE.

e3endres Rectangle e3endres Rectangle e3endres Line e3endres Line e3endres Text Box

GENERAL NOTES:

1. SEE SPECIFICATION SECTION 00 01 15 LIST OF DRAWINGS FOR SUPPLEMENTAL

DRAWINGS. THE SUPPLEMENTAL DRAWINGS ARE ANNOTATED PHOTOGRAPHS

SHOWING EXISTING ASBESTOS CONTAINING MATERIALS.

2. APPENDIX C CONTAINS A LIST OF ASBESTOS CONTAINING MATERIAL QUANTITIES.

THE APPENDIX C DATA INDICATES MEASUREMENTS OF OUTSIDE DIAMETERS OF

ASBESTOS CONTAINING MATERIAL INSULATION AROUND EXISTING PIPING. MANY OF

THE ANNOTATED PHOTOGRAPHS INDICATE PIPING SIZES AND THE BID SCHEDULE

CONTAINS RANGES OF PIPING WITH ASBESTOS CONTAINING MATERIAL.

r

NOTE: SEE APPENDIX D OF THE SPECIFICATIONS FOR DETAIL SHEETS IN EP 1110-1-11.