Amendment 0002.pdf
PDF 23 KB Posted
- Solicitation number
- W912DS-09-B-0017
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0001.pdf | ||
| Solicitation W912DS-09-B-0017.pdf | ||
| 00 00 02b-Appendix D - ACM Detail Sheets EP 1110-1-11.pdf | ||
| Plans100.pdf | ||
| Specifications100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPS-ALBANY TROY LOCK
USACE NEW YORK DISTRICT ATTN: CENAN-OP-A
TROY NY 12180
W16ROE91006323
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Revise and reissue the Scope of Work in its entirety.
2. Respond to a contractor's question (FOR INFORMATION PURPOSES ONLY).
The Bid Opening Date of 9 September 2009 at 2:00 p.m. EST remains unchanged.
NOTE: Offerors must acknow ledge receipt of this amendment by the date specif ied in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, by telegram, or by signing Block 15 of SF 30. FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH LATE
BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0017
X 9B. DATED (SEE ITEM 11)
06-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Sep-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E3R0130
FACILITY CODECODE
EMAIL:TEL:
W912DS-09-B-0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The Scope of Work is revised and reissued in its entirety to read as below:
The work includes removal and proper disposal of Asbestos Abatement and Re-Insulation of surfaces abated in 3 buildings along with demolition of the Lockmaster's House located at Troy Lock and Dam, Troy, New York.
For Building No. 6 (Administration Building) and Building No. 7 (Storehouse) -- the Asbestos Abatement and Disposal of all Asbestos-Containing Material (ACM) of insulation of all piping and appurtenances and re-insulation in kind with approved non-asbestos-containing materials.
For Building No. 6 (Administration Building) Boiler Room and Building No. 7 (Storehouse) Boiler Room -- the Asbestos Abatement and Disposal of all Asbestos-Containing Material (ACM) of fire proofing surfaces of ceilings, roof purlins, side walls, and ACM insulation of air handling duct work and re-insulation/ Fireproofing in kind with non-asbestos containing materials and fireproofing equal to the existing fire rating capability and in accordance with current building code requirements.
For Building No. 2 (Lock Operating House) -- the Asbestos Abatement and Disposal of hard board Asbestos-Containing Material (ACM) attached to electrical trays and cabinet and re-insulation/ Fireproofing in kind with non-asbestos containing materials equal to the existing fire rating capability in accordance with current building code requirement.
For the Lockmaster's House -- complete demolition of the building, sidewalk, stairs, and pads along with shrub and tree removal in compliance with federal, NY State, and local laws, rules and regulations for demolition, Asbestos abatement and Lead-Based Paint removal, AND terminating existing utilities AND also including surface restoration with required compacted backfill and grading to meet surrounding existing ground surfaces with 4 inches of topsoil and seeding.
CONTRACTOR’S QUESTION:
Question: The wage rates provided are for a service contract and not all of the rates which are incorporated in the work on this project are listed, please provide information for the rates that apply to this project for each classification to be used.
Answer: Wage rates not specified in the Wage Decision are to be accommodated in accordance with the Conformance language contained within the Wage Decision.
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been deleted:
SCOPE OF WORK
(End of Summary of Changes)