OPERATIONS DIVISION
26 FEDERAL PLAZA ROOM 1937
NEW YORK NY 10278
W16ROE90505272
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide the New York State Department of Environmental Conservation (NYSDEC) Water Quality Certif ication as Part of Section 00 90 02 para. 3.1.1, add Specif ication Sections 1.3.1.1. thru 1.3.1.3 under Section 01 22 00.00.10, revise Sheets 3 and 4 of the Plans, and to provide an answ er the question raised during the teleconference held 17 APR 2009.
The Bid Opening Date for 07 May 2009 at 2PM EST has not changed.
NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: in the space provided on the SF 30, by seperate letter, by telegram or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Apr-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-B-0008
X 9B. DATED (SEE ITEM 11)
07-Apr-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Apr-2009
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E3R0000
FACILITY CODECODE
EMAIL:TEL:
W912DS-09-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
AMENDMENT 0002
Maintenance Dredging – Shinnecock Inlet, New York.
IBF NO. W912DS-09-B-0008
1. The purpose of this amendment is to provide the New York State Department of Environmental Conservation (NYSDEC) Water Quality Certification as Part of Section 00 90 02 para. 3.1.1, revise Sheets 3 and 4 of the Plans. As a result of these changes, the Bid Opening scheduled for 7 May 2009 at 2:00P.M.has not changed.
2. The NYSDEC Water Quality Certification is attached.
3. The revised Sheets 3 and 4 are attached.
4. In addition, as a result of the teleconference on 17 April 2009, the following comment and question is responded to:
Reference: Section 01 22 00.00, paragraph 1.3.1.1, Measurement
Comment: Paragraph 1.3.1.1 states “No payment will be made for material placed: 1. Which violates Section 35 20 23, Placement of Dredged Material”.
Question:
Where is the paragraph “Placement of Dredged Material” in Section 35 20 23? Section 35 20 23 does not contain the paragraph “Placement of Dredged Material”. Please provide the paragraph in Section 35 20 23 which explains when payment will not be made for the placement of dredge material.
Answer: Section 01 22 00.00.10, paragraph 1.3.1 Dredging will be included through the Amendment:
1.3.1 Dredging
1.3.1.1 Payment
Payment will be made for costs associated with dredging of the channel, which includes performing required dredging and other operations incidental thereto, Contractor-furnished disposal area(s) and disposition of dredged material.
1.3.1.2 Measurement
The total amount of material removed and paid for under the contract (Bid Item No. 0002 will be measured by the cubic yard dredged. Measurement of the number of cubic yards in place will be made by computing the volume between the bottom surface shown by soundings of the last survey made before dredging and the bottom surface shown by soundings of a survey made as soon as practicable after the entire work specified has been completed.
The volume for measurement shall include the material within the limits of the overdepth, side slopes described in SECTION 35 20 23, para. 3.2.6 Disposal of Excavated Material.
The map and or drawings accurately represent conditions existing on 10 and 12 March 2009. The soundings shown on the contract drawings were taken with a portable electronic depth recorder with a transducer frequency of 200 kHz. New soundings will be taken generally two weeks prior to dredging. Soundings after dredging will be made by an electronic depth recorder with a transducer frequency of 200 kHz or may be made using a multi-beam surveying system. After-dredging surveys will be completed generally within five days of completion of a section or the project. Determination of quantities removed to determine in-place quantities to be paid in the area specified, after having once made, will not be reopened, except on evidence of collusion, fraud, or obvious error.
Computations for payment purposes will generally be made by the Corps of Engineers and utilizing the Triangulated Irregular Network (TIN) method or Average End Area method.
Shoaling in the areas to be dredged is not at a rapid rate from existing depths. The unit price for dredging based on the above method of computation of the quantity for which payment is to be made shall include the Contractor's evaluation of shoaling, changes in the regimen of the waterway, or changes caused by the Contractor's operations that may occur during the period between the survey before dredging and the survey for acceptance of the work.
Scows and Hopper Dredges: Where scows or hopper dredges are used in performance of work and where the Contractor maintains load or measuring devices on such scows or hopper dredges, copies of all recorded measurements made in connection with the work shall be furnished to the Contracting Officer and/or his Representative. If as the work progresses the Contractor determines that a significant difference exists between the recorded bin or scow quantities and the survey quantities computed from the check surveys described above, he shall immediately notify the Contracting Officer and/or his Representative of any such discrepancies. Such notification shall include a description of the Contractor's methods of measuring scow or bin quantities, certification of measuring techniques, documentation of material sampling and methods used to convert bin or scow measurements to in-place density.
It is emphasized that bin or scow measurements shall not be used as a basis for partial or final payment.
14-day Partial payments will be based on approximate quantities determined by soundings or sweepings taken behind the dredge by the Contractor. The contractor's soundings are to be used for partial payments only and will not form a basis for the acceptance of the work.
The Contractor must inform the Government, in writing, within three calendar days of completing the work.
The total quantity of excavated material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope of the theoretical cross sections indicated.
No allowance will be made for overdepth excavation or for the removal of any material outside the required slope lines unless authorized.
1.3.1.3 Unit of Measure
Unit of measure: cubic yard.
(End of Summary of Changes)