This is an Industry Day presentation for the Kimbrough Ambulatory Care Center (KACC) project at Fort George G. Meade, Maryland, hosted by the U.S. Army Corps of Engineers (USACE) Baltimore District on April 27-28, 2026. The Defense Health Agency (DHA) is seeking a new ambulatory care center to consolidate outpatient and dental services in a modern, properly sized facility. The new facility will support primary care, dental care, behavioral health, optometry, musculoskeletal services, audiology and hearing conservation, specialty services, preventative medicine, laboratory, radiology, pharmacy, and support services.
The project scope includes constructing a new ambulatory care center of approximately 150,000 square feet, a new central utility plant, and surface parking, along with demolition of Buildings 2473, 2474, 2475, 2476, 2481, and 2480, while maintaining existing KACC (Building 2480) functionality throughout the project. The government intends to use a Design-Build acquisition method with construction award targeted for Q2 FY29 and is actively seeking industry innovative solutions. The RFP will include programmatic requirements such as Program for Design (PFD) and Facility Planning Functional Program (FPFP), with the design team responsible for confirming program requirements and developing layouts during execution. Supplemental projects include relocating Building 2474 tenants to renovated space in Building 4418 W, providing temporary locations for Buildings 2476 and 2481 tenants, installing a dedicated chiller plant at Building 2490, and providing independent utilities to Building 2484.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| KACC Industry Day Attendance List .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRY DAY
KIMBROUGH
AMBULATORY CARE CENTER
FT. GEORGE G. MEADE, MD
BALTIMORE DISTRICT, USACE
27-28 APR 2026
AGENDA
01 INTRODUCTIONS / OPENING REMARKS
02 BACKGROUND / PROJECT SCOPE
03 QUESTIONS
INTRODUCTIONS (USACE)
DIVISION NAME POSITION
Executive Office
COL. Francis B. Pera Commander and District Engineer
Programs & Project Management
Daria Vanliew Deputy District Engineer, Programs & Project Management
Maria Orosz Chief, Military Programs & Project Management
Margaret Sharkey Program Manager, Military Programs & Project Management
Matt Breitenother Project Manager, Military Programs & Project Management
Engineering
Mary Foutz Chief, Engineering Division
Mugurel Giurgiu Chief, Military Design Branch
Shawn Crossfield Deputy, Military Design Branch
Kevin Murray Design Manager, Military Design Branch
Contracting
Paula Beck Chief, Contracting Division
Tamara Bonomolo Chief, Contracting Alpha Branch; Contracting Officer
Robert Ferebee Contract Specialist
Construction Christy Pispitsos Deputy Chief of Construction
Matt Beck Chief, Quality Management Section
INTRODUCTIONS (DHA)
NAME POSITION
LCDR Brendan Good Geographic Chief
IMPROVE CONSTRUCTION
MOVE THE NEEDLE
“Use this opportunity to show that Army Construction can be just as nimble and efficient as private sector construction….. unleash the innovation of the designer and construction contractor”.
BACKGROUND
DHA requires a new Kimbrough Ambulatory Care Center (ACC) in Fort Meade, MD. The new ACC will:
• Consolidate outpatient and dental services to support the healthcare and readiness missions in a modern, properly sized facility.
• Support primary care, dental care, behavioral health, optometry, musculoskeletal, audiology and hearing conservation, specialty services, preventative medicine, laboratory, radiology, pharmacy, and support services.
PROJECT SCOPE
• Construct a new ambulatory care center approximately ~150,000 SF
• Construct a new central utility plant and surface parking
• Demolition of Buildings 2473, 2474, 2475, 2476, 2481 and 2480. Maintain existing KACC (2480) functionality throughout duration of the project
• The RFP will include programmatic requirements, such as PFD (Program for Design) and FPFP
(Facility Planning Functional Program)
• During Design-Build execution, the Design Team will be responsible for confirming program and developing layouts
• Govt intends to use Design-Build acquisition for Q2 FY29 Construction Award. Government looking for industry innovative solutions
PROJECT SCOPEEXISTING SITE PLAN
Supplemental Projects/Actions (PURPLE)
1. 2474 tenants to move to renovated space in Building 4418 W on Llewellyn Ave.
2. 2476 tenants to receive temporary location (final location new KACC or tbd)
3. 2490 to receive new dedicated chiller plant
4. 2481 to receive temporary location (final location new
KACC)
5. 2484 to receive independent utilities
PROJECT SCOPECONCEPTUAL SITE PLAN
QUESTIONS?
| INDUSTRY DAY�KIMBROUGH �AMBULATORY CARE CENTER�Ft. George G. meade, md���Baltimore District, USACE |
| AGENDA |
| INTRODUCTIONS (USACE) |
| INTRODUCTIONS (DHA) |
| �IMPROVE CONSTRUCTION�MOVE THE NEEDLE |
| BACKGROUND |
| PROJECT SCOPE |
| Project scope |
| Project scope |
| QUESTIONS? |
File details come from the government source that posted it. Updated .