Abstract of Bids_ Alvin R Bush Dam Rock Wall Stabalization Signed.pdf

PDF 234 KB Posted

Attached to
Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, PA
Solicitation number
W912DR26BA002
Issued by

About this file

This is an Abstract of Offers - Construction document for solicitation W912DR26BA002 issued by USACE Baltimore District on February 13, 2026, for the Alvin R. Bush Dam Rock Wall Stabilization Project located at Kettle Creek, Clinton County, Pennsylvania. The document records nine bids received in response to this construction solicitation, opened on April 23, 2026. The contracting officer is Sharon Alexander.

The project is structured as a firm fixed price contract with a base bid and multiple optional items. The base contract encompasses all costs for rock wall stabilization work at Alvin R. Bush Dam, with individual line items for power line relocation, concrete for new wall construction, water tightness testing, waterproofing anchor holes, and redrilling pregrouted holes. The contract includes two optional project phases (Options 1 and 2) with similar scope items, plus two additional optional projects: Project Option 5 (concrete rehabilitation in the spillway with three rehabilitation types) and Project Option 6 (paving of existing roads and culvert replacement). All bidders were required to provide bid bonds at 20% of their bid amounts. The nine contractors who submitted bids were Brayman Construction Corporation ($33.0 million base and options total), Allison Park Contractors, Inc. ($17.1 million), David Boland, Inc. ($45.9 million), Kinsley Construction, LLC ($33.9 million), Mascaro Construction Company, LP ($23.6 million), Merlo, Inc. ($27.5 million), Michels Construction, Inc. ($24.5 million), Thalle Construction Co., Inc. ($61.7 million), and Wagman Heavy Civil, Inc. ($21.5 million).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

23-Apr-26 1 of 4

4. ISSUING OFFICE Name and title of Certifying Official (Type) I CERTIFY that I have opened, read, and

USACE, BALTIMORE DISTRICT recorded on this abstract all offers Signature Date Signed 2 HOPKINS PLAZA received in response to this solicitation.

BALTIMORE, MD 21201 Contracting Officer: Sharon Alexander

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

X C. REASONABLE CONTRACT C. Amendment Acknowledged C. Amendment Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Base Contract, complete as shown on the drawings and specified Base Bid

1 Job 13,288,966.25$ 13,288,966.25$ 5,100,000.00$ 5,100,000.00$ 17,565,000.00$ 17,565,000.00$

0002 Power Line Relocation 1 Job 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$

0003 Concrete for New Wall Construction 635 Cubic Yard 2,164.32$ 1,374,343.20$ 3,600.00$ 2,286,000.00$ 2,200.00$ 1,397,000.00$

0004 Water Tightness Testing Pricing Arrangement: Firm Fixed Price 130 Each 854.50$ 111,085.00$ 1,500.00$ 195,000.00$ 440.00$ 57,200.00$

0005 Waterproofing Anchor Holes 400 Bag 192.26$ 76,904.00$ 300.00$ 120,000.00$ 280.00$ 112,000.00$

0006 Redrilling Pregrouted Holes P 2100 Linear Foot 135.70$ 284,970.00$ 90.00$ 189,000.00$ 160.00$ 336,000.00$

0007 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 1 1 Job 6,685,633.39$ 6,685,633.39$ 2,000,000.00$ 2,000,000.00$ 3,905,000.00$ 3,905,000.00$

0008 Concrete for New Wall Construction in Project Option 1. 653 Cubic Yard 1,985.37$ 1,296,446.61$ 2,500.00$ 1,632,500.00$ 2,200.00$ 1,436,600.00$

0009 Watertightness Testing for Project Option 1 150 Each 736.79$ 110,518.50$ 1,200.00$ 180,000.00$ 440.00$ 66,000.00$

0010 Waterproofing Anchor Holes for Project Option 1. 400 Bag 160.27$ 64,108.00$ 200.00$ 80,000.00$ 280.00$ 112,000.00$

0011 Redrilling Pregrouted Holes for Project Option 1. 2400 Linear Foot 116.24$ 278,976.00$ 75.00$ 180,000.00$ 160.00$ 384,000.00$

0012 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 2 1 Job 6,723,169.91$ 6,723,169.91$ 2,000,000.00$ 2,000,000.00$ 4,030,000.00$ 4,030,000.00$

0013 Concrete for New Wall Construction in Project Option 2. 660 Cubic Yard 1,983.51$ 1,309,116.60$ 2,500.00$ 1,650,000.00$ 2,200.00$ 1,452,000.00$

0014 Watertightness Testing for Project Option 2. 150 Each 736.79$ 110,518.50$ 1,200.00$ 180,000.00$ 440.00$ 66,000.00$

0015 Waterproofing Anchor Holes for Project Option 2. 400 Bag 160.27$ 64,108.00$ 200.00$ 80,000.00$ 280.00$ 112,000.00$

0016 Redrilling Pregrouted Holes for Project Option 2. 2400 Linear Foot 116.24$ 278,976.00$ 75.00$ 180,000.00$ 160.00$ 384,000.00$

0017 Project Option 5: Type 1 Concrete Rehabilitation in the Spillway 410 Square Foot 517.27$ 212,080.70$ 320.00$ 131,200.00$ 192.00$ 78,720.00$

0018 Project Option 5: Type 2 Concrete Rehabilitation 24 Square Foot 5,172.34$ 124,136.16$ 1,350.00$ 32,400.00$ 710.00$ 17,040.00$

0019 Project Option 5: Type 3 Concrete Rehabilitation 150 Square Foot 1,237.77$ 185,665.50$ 1,760.00$ 264,000.00$ 800.00$ 120,000.00$

0020 Project Option 6: Paving of Existing Roads and Replace Culvert 1 Job 320,476.28$ 320,476.28$ 475,000.00$ 475,000.00$ 235,000.00$ 235,000.00$

TOTAL ESTIMATED AMOUNT (BASE BID AND

OPTIONAL ITEMS)

$33,000,198.60 $17,055,100.00 $31,965,560.00

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

6. NUMBER OF AMENDMENTS ISSUED: 6 (SIX)

Yes

Bid Bond 20%

13-Feb-26W912DR26BA002

Alvin Bush Dam Rock Wall Stabilization Kettle Creek, Clinton County, PA

No. 1

9. OFFERS

Bid Bond 20%

Brayman Construction Corporation 1000 John Roebling Way

Saxonburg, PA 16056

UEI: EHELS5QAHUV3

Yes

No. 2 Allison Park Contractors, Inc.

4389 Gibsonia Rd.

Gibsonia, PA 15044

UEI: H9JEUCAFKBZ5

1. SOLICITATION NUMBER PAGE

4. ISSUING OFFICE INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items

USACE, BALTIMORE DISTRICT which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional 2 HOPKINS PLAZA Continuation Sheets (OF 1419A) as needed.

BALTIMORE, MD 21201

5. PROJECT TITLE

B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) B. Bid Security (Type and Amount)

C. Amendment Acknowledged C. Amendment Acknowledged C. Amendment Acknowledged

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Base Contract, complete as shown on the drawings and specified Base Bid

1 Job 28,886,000.00$ 28,886,000.00$ 15,950,000.00$ 15,950,000.00$ 10,826,244.00$ 10,826,244.00$

0002 Power Line Relocation 1 Job 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$

0003 Concrete for New Wall Construction 635 Cubic Yard 1,230.00$ 781,050.00$ 580.00$ 368,300.00$ 4,200.00$ 2,667,000.00$

0004 Water Tightness Testing Pricing Arrangement: Firm Fixed Price 130 Each 792.00$ 102,960.00$ 5,486.00$ 713,180.00$ 800.00$ 104,000.00$

0005 Waterproofing Anchor Holes 400 Bag 390.00$ 156,000.00$ 444.00$ 177,600.00$ 200.00$ 80,000.00$

0006 Redrilling Pregrouted Holes P 2100 Linear Foot 120.00$ 252,000.00$ 240.00$ 504,000.00$ 100.00$ 210,000.00$

0007 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 1 1 Job 6,186,500.00$ 6,186,500.00$ 5,770,509.00$ 5,770,509.00$ 2,187,000.00$ 2,187,000.00$

0008 Concrete for New Wall Construction in Project Option 1. 653 Cubic Yard 1,235.00$ 806,455.00$ 580.00$ 378,740.00$ 3,000.00$ 1,959,000.00$

0009 Watertightness Testing for Project Option 1 150 Each 792.00$ 118,800.00$ 4,450.00$ 667,500.00$ 800.00$ 120,000.00$

0010 Waterproofing Anchor Holes for Project Option 1. 400 Bag 390.00$ 156,000.00$ 440.00$ 176,000.00$ 200.00$ 80,000.00$

0011 Redrilling Pregrouted Holes for Project Option 1. 2400 Linear Foot 120.00$ 288,000.00$ 240.00$ 576,000.00$ 100.00$ 240,000.00$

0012 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 2 1 Job 6,238,000.00$ 6,238,000.00$ 6,150,000.00$ 6,150,000.00$ 2,230,000.00$ 2,230,000.00$

0013 Concrete for New Wall Construction in Project Option 2. 660 Cubic Yard 1,235.00$ 815,100.00$ 580.00$ 382,800.00$ 2,900.00$ 1,914,000.00$

0014 Watertightness Testing for Project Option 2. 150 Each 792.00$ 118,800.00$ 4,450.00$ 667,500.00$ 800.00$ 120,000.00$

0015 Waterproofing Anchor Holes for Project Option 2. 400 Bag 390.00$ 156,000.00$ 440.00$ 176,000.00$ 200.00$ 80,000.00$

0016 Redrilling Pregrouted Holes for Project Option 2. 2400 Linear Foot 120.00$ 288,000.00$ 240.00$ 576,000.00$ 100.00$ 240,000.00$

0017 Project Option 5: Type 1 Concrete Rehabilitation in the Spillway 410 Square Foot 160.00$ 65,600.00$ 300.00$ 123,000.00$ 150.00$ 61,500.00$

0018 Project Option 5: Type 2 Concrete Rehabilitation 24 Square Foot 933.00$ 22,392.00$ 505.00$ 12,120.00$ 600.00$ 14,400.00$

0019 Project Option 5: Type 3 Concrete Rehabilitation 150 Square Foot 635.00$ 95,250.00$ 1,205.00$ 180,750.00$ 800.00$ 120,000.00$

0020 Project Option 6: Paving of Existing Roads and Replace Culvert 1 Job 242,590.00$ 242,590.00$ 300,000.00$ 300,000.00$ 285,000.00$ 285,000.00$

TOTAL ESTIMATED AMOUNT (BASE BID AND

OPTIONAL ITEMS)

45,875,497.00$ 33,949,999.00$ 23,638,144.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

Bid Bond 20%

Yes

W912DR26BA002

No. 3 David Boland, Inc.

P.O. Box 1870 Titusville, Florida 32781-1870

UEI: MARFUHM88M38

No. 4 Kinsley Construction, LLC

P.O. Box 2886 1110 E Princess St York, PA 17403

UEI: CSFTQY16FN79

No. 5 Mascaro Construction Company, LP

1720 Metropolitan Street Pittsburgh, PA 15233

UEI: UJVJBUPFFLM3

Bid Bond 20%

Yes

Bid Bond 20%

OFFERS (Continued)

ABSTRACT OF OFFERS - CONSTRUCTION

6. NUMBER OF AMENDMENTS ISSUED: 6 (SIX)

Yes

Alvin Bush Dam Rock Wall Stabilization Kettle Creek, Clinton County, PA

4. ISSUING OFFICE INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items

USACE, BALTIMORE DISTRICT which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional 2 HOPKINS PLAZA Continuation Sheets (OF 1419A) as needed.

BALTIMORE, MD 21201

5. PROJECT TITLE

B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) B. Bid Security (Type and Amount)

C. Amendment Acknowledged C. Amendment Acknowledged C. Amendment Acknowledged

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Base Contract, complete as shown on the drawings and specified Base Bid

1 Job 10,871,787.57$ 10,871,787.57$ 13,815,608.00$ 13,815,608.00$ 50,820,000.00$ 50,820,000.00$

0002 Power Line Relocation 1 Job 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$ 100,000.00$

0003 Concrete for New Wall Construction 635 Cubic Yard 899.02$ 570,877.70$ 750.00$ 476,250.00$ 450.00$ 285,750.00$

0004 Water Tightness Testing Pricing Arrangement: Firm Fixed Price 130 Each 906.07$ 117,789.10$ 4,000.00$ 520,000.00$ 344.00$ 44,720.00$

0005 Waterproofing Anchor Holes 400 Bag 446.06$ 178,424.00$ 100.00$ 40,000.00$ 147.00$ 58,800.00$

0006 Redrilling Pregrouted Holes P 2100 Linear Foot 161.72$ 339,612.00$ 160.00$ 336,000.00$ 61.00$ 128,100.00$

0007 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 1 1 Job 6,851,919.44$ 6,851,919.44$ 2,928,819.00$ 2,928,819.00$ 3,600,000.00$ 3,600,000.00$

0008 Concrete for New Wall Construction in Project Option 1. 653 Cubic Yard 929.32$ 606,845.96$ 680.00$ 444,040.00$ 450.00$ 293,850.00$

0009 Watertightness Testing for Project Option 1 150 Each 906.07$ 135,910.50$ 3,000.00$ 450,000.00$ 344.00$ 51,600.00$

0010 Waterproofing Anchor Holes for Project Option 1. 400 Bag 446.06$ 178,424.00$ 100.00$ 40,000.00$ 147.00$ 58,800.00$

0011 Redrilling Pregrouted Holes for Project Option 1. 2400 Linear Foot 158.38$ 380,112.00$ 160.00$ 384,000.00$ 61.00$ 146,400.00$

0012 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 2 1 Job 4,557,511.35$ 4,557,511.35$ 2,900,000.00$ 2,900,000.00$ 4,730,000.00$ 4,730,000.00$

0013 Concrete for New Wall Construction in Project Option 2. 660 Cubic Yard 926.98$ 611,806.80$ 680.00$ 448,800.00$ 450.00$ 297,000.00$

0014 Watertightness Testing for Project Option 2. 150 Each 906.07$ 135,910.50$ 3,000.00$ 450,000.00$ 344.00$ 51,600.00$

0015 Waterproofing Anchor Holes for Project Option 2. 400 Bag 446.06$ 178,424.00$ 100.00$ 40,000.00$ 147.00$ 58,800.00$

0016 Redrilling Pregrouted Holes for Project Option 2. 2400 Linear Foot 158.38$ 380,112.00$ 160.00$ 384,000.00$ 61.00$ 146,400.00$

0017 Project Option 5: Type 1 Concrete Rehabilitation in the Spillway 410 Square Foot 1,471.42$ 603,282.20$ 650.00$ 266,500.00$ 255.00$ 104,550.00$

0018 Project Option 5: Type 2 Concrete Rehabilitation 24 Square Foot 1,044.60$ 25,070.40$ 750.00$ 18,000.00$ 790.00$ 18,960.00$

0019 Project Option 5: Type 3 Concrete Rehabilitation 150 Square Foot 958.95$ 143,842.50$ 700.00$ 105,000.00$ 1,210.00$ 181,500.00$

0020 Project Option 6: Paving of Existing Roads and Replace Culvert 1 Job 489,337.98$ 489,337.98$ 400,000.00$ 400,000.00$ 493,169.00$ 493,169.00$

TOTAL ESTIMATED AMOUNT (BASE BID AND

OPTIONAL ITEMS)

27,457,000.00$ 24,547,017.00$ 61,669,999.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

W912DR26BA002

Bid Bond 20% Bid Bond 20%

Merlo, Inc.

234 Merlo Road, Mineral Point, PA 15942

UEI: JDF8DGHD25N5

Michels Construction, Inc.

817 Main St.

Brownsville, WI 53006

UEI: CDE7H8M86MB5

Bid Bond 20%

6. NUMBER OF AMENDMENTS ISSUED: 6 (SIX) Yes Yes Yes

Thalle Construction Co., Inc.

900 NC Highway 86 N

Hillsborough, NC 27278

UEI: RMVJU76MCN81

Alvin Bush Dam Rock Wall Stabilization Kettle Creek, Clinton County, PA

ABSTRACT OF OFFERS - CONSTRUCTION

OFFERS (Continued) No. 6 No. 7 No. 8

4. ISSUING OFFICE INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items

USACE, BALTIMORE DISTRICT which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional 2 HOPKINS PLAZA Continuation Sheets (OF 1419A) as needed.

BALTIMORE, MD 21201

5. PROJECT TITLE

B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) B. Bid Security (Type and Amount)

C. Amendment Acknowledged C. Amendment Acknowledged C. Amendment Acknowledged

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Base Contract, complete as shown on the drawings and specified Base Bid

1 Job 12,319,228.00$ 12,319,228.00$

0002 Power Line Relocation 1 Job 100,000.00$ 100,000.00$

0003 Concrete for New Wall Construction 635 Cubic Yard 2,706.44$ 1,718,589.40$

0004 Water Tightness Testing Pricing Arrangement: Firm Fixed Price 130 Each 708.00$ 92,040.00$

0005 Waterproofing Anchor Holes 400 Bag 122.00$ 48,800.00$

0006 Redrilling Pregrouted Holes P 2100 Linear Foot 73.00$ 153,300.00$

0007 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 1 1 Job 1,128,041.00$ 1,128,041.00$

0008 Concrete for New Wall Construction in Project Option 1. 653 Cubic Yard 2,815.62$ 1,838,599.86$

0009 Watertightness Testing for Project Option 1 150 Each 710.00$ 106,500.00$

0010 Waterproofing Anchor Holes for Project Option 1. 400 Bag 147.00$ 58,800.00$

0011 Redrilling Pregrouted Holes for Project Option 1. 2400 Linear Foot 73.00$ 175,200.00$

0012 All costs in connection with Alvin R. Bush Dam Rock Wall Stabilization Project Option 2 1 Job 1,104,833.84$ 1,104,833.84$

0013 Concrete for New Wall Construction in Project Option 2. 660 Cubic Yard 2,883.37$ 1,903,024.20$

0014 Watertightness Testing for Project Option 2. 150 Each 710.00$ 106,500.00$

0015 Waterproofing Anchor Holes for Project Option 2. 400 Bag 147.00$ 58,800.00$

0016 Redrilling Pregrouted Holes for Project Option 2. 2400 Linear Foot 73.00$ 175,200.00$

0017 Project Option 5: Type 1 Concrete Rehabilitation in the Spillway 410 Square Foot 230.00$ 94,300.00$

0018 Project Option 5: Type 2 Concrete Rehabilitation 24 Square Foot 664.00$ 15,936.00$

0019 Project Option 5: Type 3 Concrete Rehabilitation 150 Square Foot 662.00$ 99,300.00$

0020 Project Option 6: Paving of Existing Roads and Replace Culvert 1 Job 192,167.70$ 192,167.70$

TOTAL ESTIMATED AMOUNT (BASE BID AND

OPTIONAL ITEMS)

21,489,160.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

W912DR26BA002

Bid Bond 20%

Wagman Heavy Civil, INC 3265 Farmtrail Rd York, PA 17406

UEI: ELA3TZW9DUM5

6. NUMBER OF AMENDMENTS ISSUED: 6 (SIX) Yes

Alvin Bush Dam Rock Wall Stabilization Kettle Creek, Clinton County, PA

ABSTRACT OF OFFERS - CONSTRUCTION

OFFERS (Continued) No. 9 No. 1 No. 1

Cover PAge
Page 2
Page 3
Page 4
2026-04-27T09:37:02-0400
ALEXANDER.SHARON.LAGENIECE.1229366145