This document summarizes an amendment to a federal solicitation for a dam gate replacement project. The amendment provides responses to offeror questions, updates the wage determination, and extends the solicitation closing date to May 25, 2023. The project involves replacing an emergency dam gate and disposing of eight leaf gates at the Foster Joseph Sayers Dam in Centre County, Pennsylvania. The solicitation is a total small business set-aside and offers will be evaluated on a lowest-priced, technically acceptable basis. The optional site visit is scheduled for April 4, 2023 and questions must be submitted by April 14, 2023. Quotes are due by May 25, 2023. The estimated contract value is between $100,000 and $250,000. The selected contractor will be awarded a firm-fixed-price contract to complete the gate replacement and disposal work within 365 days of notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR23Q0021 Amendment 0002.pdf | ||
| J-3 Wage Determination PA20230002.txt | TXT text file | |
| J-6 Drawings-OUTLET-WORKS-GATE-STRUCTURE.pdf | ||
| J-7 Drawings-TOWER EXTENSION.pdf | ||
| W912DR23Q0021 RFQ Foster Joseph Sayer Dam Gate Replacement rev 2023-05-11.pdf | ||
| W912DR23Q0021 RFQ Amendment 02.pdf | ||
| W912DR23Q0021 RFQ Amendment 0001.pdf | ||
| W912DR23Q0021 RFQ Revised 2023-04-18.pdf | ||
| J-2 FJS Dam Emergency Gate Drawings.pdf | ||
| J-3 PA20230002 Wage Determination.pdf | ||
| J-1 FJS_Dam_Emergency_Gate-Specs 2023-02.pdf | ||
| J-4 Past Performance Questionnaire.pdf | ||
| J-5 Quote Schedule.docx | DOCX document | |
| W912DR23Q0021 RFQ Foster Joseph Sayer Dam Gate Replacement.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to respond to the remaining inquiries, update the w age determination, and extend the closing of the solicitation to 25 May 2023.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR23Q0021
X 9B. DATED (SEE ITEM 11)
27-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-May-2023
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR23Q0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
QUESTIONS FOR AMENDMENT 0003
What are the liquidated damages for this contract?
The liquidated damages will be $24.00 per day. Clause FAR 52.211-12 Liquidated Damages- Construction has been added to the solicitation by full text.
Can as-builts of the concrete structure be provided?
Two drawings files have been added to the “Attachments” for the solicitation. Requesting the drawings is not required.
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
The Government will award a firm-fixed-price (FFP) contract to the responsible Small Business Offeror whose offer is the lowest priced, technically acceptable. Offeror’s must be registered in the System for Award Management (www.sam.gov) at the time a quote is submitted. The quotes will be evaluated based on the following three (3) factors:
Factor I: Technical Capability
Factor II: Past Performance
Factor III: Price Proposal
Offers shall be prepared in accordance with these instructions, providing all required information in the specified format. Timely submission will be documented in accordance with the date and time stamp of the email submission.
An email confirmation will be sent by the Government within one business day to confirm receipt. If the Offeror cannot provide a Bid Guarantee in accordance with FAR 52.228–1, the Offeror’s quote will not be considered valid for this solicitation. Submit the Bid Guarantee electronically with the quote submission.
The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Quotes shall be submitted via email ONLY to Ms. Erica Stiner at erica.j.stiner@usace.army.mil by 25 May 2023 at 6:00 PM ET.
Questions concerning this solicitation must be submitted by email (erica.j.stiner@usace.army.mil) no later than 14 April 2023 at 6:00 PM ET. This will allow responses to be posted on SAM.gov prior to the solicitation closing. Offerors are responsible for checking for any amendments to the solicitation at SAM.gov.
A site visit will be hold on 4 April 2023 at 10:30 am local time. The point of contact is Mr. Jeffrey Meadows (570- 213-2264). Advance registration is requested but not required. Attendance is optional and questions will not be answered on-site. Submit all questions in writing as stated above. Attendees should bring steel-toed boots and a hard hat. Parking is located at the dam office/garage. The site visit will be held rain or shine.
Site: 493 Ridge Crest Drive
Howard PA 16841-2612
SUBMISSION INSTRUCTIONS
The quote shall consist of two separate volumes: a technical proposal and a price proposal. Note: The technical proposal shall not contain any pricing information.
a) Volume 1: Technical Submissions should be limited to 10 pages, not including the table of contents, cover page, tables, images, resumes, schedule, or past performance questionnaires. Text should be at size 12 font, single spaced.
Font limitations do not apply to charts, tables, and figures, but font must be legible. Include a Cover Letter summarizing the pricing total and stating the Offeror’s address, point of contact, Cage Code, and UEI.
i) Factor I: Technical Approach: Offeror shall provide sufficient detail to demonstrate they can realistically meet the requirements of the specifications. The Offeror shall describe their plan to provide the necessary equipment, personnel, materials, and other resources and tentative schedule with key milestones to meet the delivery schedule (365 days from the notice to proceed). The Technical Approach will include:
1. Equipment plan: The proposed equipment list should only include the equipment which will be used on this contract. Include size, make, model, and ownership (owned or rented) of equipment.
2. Staffing plan: The proposed staffing plan shall include both numbers of personnel proposed and position titles. Resumes for proposed key personnel, consisting of experience and other pertinent information, inclusive of superintendents, quality control inspectors, and foremen must also be submitted.
3. Work plan: A work plan shall be submitted indicating how the work will be accomplished including the steps required and definable features of work. A proposed schedule stated in the number of days from award issuance, not in actual dates, should also be provided and shall include the most realistic project completion date.
ii) Factor II: Past Performance: Past performance refers to the quality of recent project experience from the customer’s perspective. The Offeror shall provide (3) Past Performance Questionnaires or CPARS assessments from references for similar work completed in the last five (5) years with narrative description of the work performed for each project, not to exceed one page per project. The Offeror may arrange for the reference customer point of contact to complete the Past Performance Questionnaire ((PPQ) attachment J-4) and forward directly by the references to Erica Stiner, Contract Specialist, at erica.j.stiner@usace.army.mil or provide the PPQs in their submission. Ensure that the PPQ sections 1 to 4 are completed before giving the form to references. The Government will not release the questionnaire forms to the Offeror at any time, for the Government to solicit candid, unbiased responses, and comments. The Government may use data in the Government’s Past Performance Information Retrieval System (PPIRS) and other resources to determine past performance acceptability.
Relevant similar projects must include all of the following elements, but do not have to include all elements in each project individually:
Metal Fabrication
Hydraulic Steel Structures Fabrication and Painting Critical Lifts Metal Demolition and Disposal
b) Volume 2: Price
i) The Price Proposal shall be provided separately from the technical proposal.
ii) Volume 2 should include any explanations or assumptions associated with the technical aspects of completing the work related to the price.
iii) Pricing shall be provided on a firm-fixed basis according to the contract line item numbers (CLIN 0001 and CLIN 0002) to meet the requirements of the statement of work to be completed. The Contractor is responsible for all labor, material, equipment, permits, transportation, and other resources required to perform the work.
Include the attached Quote Sheet (attachment J-5).
EVALUATION CRITERIA
Quote Compliance Review: A quote compliance review will be performed to ensure that all required representations and certifications are complete, that the bid guarantee and technical and price proposals have been received, and that the Offerors are eligible for consideration.
Volume I
a) Factor I Technical Approach will be evaluated on technical capability to successfully complete the project in accordance with the specifications and scope of work. The Offeror must provide sufficient detail to evaluate the staffing, equipment, material, and other resources are sufficient to complete the work on schedule. The Technical Approach will be rated as acceptable or unacceptable as outlined in Table A-1.
Table A-1 Technical Approach Rating Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
b) Factor II Past Performance will be evaluated for the Offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the Offeror’s record of relevant and recent past performance information that pertain to the construction work outlined in the solicitation requirements. Past performance will be rated on an acceptable or unacceptable basis using the ratings in Table A-2. Offeror’s without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered acceptable.
Table A-2 Past Performance Rating Adjectival Rating Description
Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror's performance record is unknown.
Unacceptable Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will successfully perform the required effort.
Volume II
a) The Government will evaluate price by adding the total of all CLIN prices. Prices will be evaluated to establish the best value to the Government using the price analysis technique in FAR 13.106-3(a)(1): comparison of competitive quotations. If only one offer is received, the price will be evaluated as fair and reasonable based on a comparison with the Independent Government Estimate.
b) Offerors must include all CLIN; partial quotes will not be accepted.
c) The proposed price shall include all resources the Offeror would require to perform the work except the Government equipment (crane) to be provided, including profit, permits, bonds, insurance, and travel/transportation.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by full text:
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $24.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Attachment J-1 Specifications Attachment J-2 Drawings Attachment J-6 Drawings – Outlet Works Gate Structure Attachment J-7 Drawings – Tower Extension
(End of clause)