C.04.01 Abstract of Bids W912DR23B0011 Poplar Island Spillway.pdf

PDF 155 KB Posted

Attached to
2023 Poplar Island Spillway Rehabilitation, Talbot County, Maryland
Solicitation number
W912DR23B0011
Issued by

About this file

This document is an abstract of bids for the 2023 Poplar Island Spillway Rehabilitation project in Talbot County, Maryland. The U.S. Army Corps of Engineers, Baltimore District is soliciting bids to repair two existing spillway structures and plug and abandon several unused spillway structures at Poplar Island. The work includes slip lining pipes with HDPE, structural repairs to sluice gates and appurtenances, and filling and capping pipes to prevent impacts to perimeter dikes. The estimated value of construction is between $1-5 million. Five bids were received by the June 29, 2023 deadline ranging from $1.46-3.53 million. Joint Forces Construction, LLC submitted the lowest base bid of $1.46 million while COHO Construction Management, LLC submitted the highest base plus option bid of $3.53 million. All bidders included the required 20% bid bond. The period of performance is 120 calendar days once awarded.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

6/29/2023 1 of 2

4. ISSUING OFFICE Name and title of Certifying Official (Type) Gary Faykes - Contracting Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed 6/29/2023 received in response to this solicitation.

Contracting Officer: Gary A. Faykes

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

X C. REASONABLE CONTRACT C. Amendments Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JOB LS 458,450.25$ LS 135,780.00$ LS 655,668.00$

0002 All cost in connection with Spillway #9 and #11 repairs 1 JOB LS 1,107,975.36$ LS 448,950.00$ LS 1,094,097.00$

0003 All cost in connection with Spillway #13 and #15 Abandoning 1 JOB LS 287,499.76$ LS 394,200.00$ LS 659,561.00$

TOTAL BASE BID AMOUNT 1,853,925.37$ 978,930.00$ 2,409,326.00$

0004 All cost in connection with Spillway #4 and #5 Abandoning 1 JOB LS 284,541.01$ LS 416,100.00$ LS 392,049.00$

TOTAL BASE PLUS OPTION BID AMOUNT 2,138,466.38$ 1,395,030.00$ 2,801,375.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

C. Amendments Acknowledged

Joint Forces Construction, LLC 328 Old York Hampton Highway, Unit C

Yorktown, VA 23692

No. 2

BALTIMORE, MD 21201

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

Yes

Bid Bond 20%

5/16/2023W912DR23B0011

2023 Poplar Island Spillway Rehabilitation, Talbot County, Maryland

No. 1

BALTIMORE DISTRICT, CORPS OF ENIGNEERS

2 HOPKINS PLAZA

9. OFFERS

Bid Bond 20%

Property and Environmental Management, Inc.

6161 Busch Blvd., Suite 255

Columbus, OH 43229

Yes

6. NUMBER OF AMENDMENTS ISSUED: Four (4)

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS W912DR23B0011 2 of 2 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED 7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JOB LS 471,692.74$ LS 655,837.00$ LS 163,790.00$

0002 All cost in connection with Spillway #9 and #11 repairs 1 JOB LS 556,311.17$ LS 1,967,512.00$ LS 927,944.00$

0003 All cost in connection with Spillway #13 and #15 Abandoning 1 JOB LS 437,952.07$ LS 499,686.00$ LS 943,834.00$

TOTAL BASE BID AMOUNT 1,465,955.98$ 3,123,035.00$ 2,035,568.00$

0004 All cost in connection with Spillway #4 and #5 Abandoning 1 JOB LS 437,952.07$ LS 416,291.00$ LS 653,687.00$

TOTAL BASE PLUS OPTION BID AMOUNT 1,903,908.05$ 3,539,326.00$ 2,689,255.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236- OPTIONAL FORM 1419 (11-88)

OFFERS (Continued)

Bid Bond 20%

2023 Poplar Island Spillway Rehabilitation, Talbot County, Maryland

Yes Yes Yes

No. 3 No. 4

Seaward Marine Corporation 602 Ford Drive

Norfolk, VA 23523

COHO Construction Management, LLC 1577 C Street, Suite 300 Anchorage, AK 99501

McCarthy Concrete Incorporated 30 Talbot Lane

South Windsor, CT 06074

Bid Bond 20% Bid Bond 20%

No. 5

2023-06-29T12:22:08-0400
FAYKES.GARY.A.1086691600

File details come from the government source that posted it. Updated .