C.04.01_Abstract of Bids_W912DR21B0015.pdf
PDF 146 KB Posted
- Solicitation number
- W912DR21B0015
About this file
This abstract of bids document summarizes three offers received in response to Solicitation Number W912DR21B0015 for the Poplar Island Cell 1C Inlet Repairs project located in Poplar Island, Maryland. The project scope involves removing four failing wingwalls at a tidal inlet, installing sheet piling along dike slopes, repairing dikes and a road, and replacing guardrails. The lowest bidder was New Dominion Construction, LLC with a total bid amount of $2,187,588.00. The government estimate was $2,607,662.00. The second lowest bidder was Prestige Development Services, Inc. with a total bid amount of $2,490,563.58. Both bids included the required 20% bid bond and acknowledged Amendment One. The solicitation was designated for the HUBZone small business program and issued by the U.S. Army Corps of Engineers, Baltimore District for repair work needed to stabilize failing structures at the tidal inlet on Poplar Island, Maryland.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3. DATE OPENED PAGE
7/16/2021 1 of 1
4. ISSUING OFFICE Name and title of Certifying Official (Type) Gary Faykes - Contracting Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed 16 July 2021 received in response to this solicitation.
Contracting Officer: GARY A. FAYKES
5. PROJECT TITLE
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)
X C. REASONABLE CONTRACT C. Amendment Acknowledged (Including Profit)
7A. 7B. 7C. D. E. F. E. F. E. F.
ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED
No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB LS 281,980.66$ LS 253,383.00$ LS 347,588.00$
0002 All cost in connection with 1C inlet repair 1 JOB LS 1,072,872.92$ LS 1,059,085.00$ LS 1,385,573.00$
0003 350 lb Armor stone – stockpile 4000 Tons 136.12$ 544,480.00$ 90.92$ 363,680.00$ 81.906$ 327,624.00$
0004 12-Minus stone – stockpile 1000 Tons 66.46$ 66,460.00$ 89.43$ 89,430.00$ 75.174$ 75,174.00$
0005 Crushed Stone (GAB) – stockpile 6000 Tons 68.34$ 410,040.00$ 52.17$ 313,020.00$ 56.10$ 336,600.00$
0006 Geotextile – stockpile 5000 SY 3.16$ 15,800.00$ 4.21$ 21,050.00$ 12.342$ 61,710.00$
0007 #2 stone – stockpile 1000 Tons 98.93$ 98,930.00$ 87.94$ 87,940.00$ 73.393$ 73,393.00$
TOTAL BASE BID AMOUNT 2,490,563.58$ 2,187,588.00$ 2,607,662.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
Yes
Bid Bond 20%
6/14/2021W912DR21B0015
POPLAR ISLAND CELL 1C INLET REPAIRS
POPLAR ISLAND, MARYLAND
No. 1
BALTIMORE DISTRICT, CORPS OF ENIGNEERS
2 HOPKINS PLAZA
9. OFFERS
Bid Bond 20%
Prestige Development Servcies, Inc.
1125 West St., Ste 210 Annapolis, MD 21401
Yes
6. NUMBER OF AMENDMENTS ISSUED: One (1) C. Amendment Acknowledged
New Dominion Construction, LLC 17959 Dumfires Shopping Plaza, Suite B3
Dumfries, VA 22026
No. 2
BALTIMORE, MD 21201
ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER
| 2021-07-16T11:43:07-0400 | |
| FAYKES.GARY.A.1086691600 |
File details come from the government source that posted it. Updated .