This document includes a federal contract opportunity and related government file. The federal contract opportunity is a solicitation for Poplar Island Cell 1C Inlet Repairs in Poplar Island, Maryland. The scope of work involves removing failing wingwalls and sheet piling, repairing dikes and roads, and replacing guardrails at a tidal inlet. The contract is set aside for Hubzone small businesses. The Department of the Army Corps of Engineers Engineering District Baltimore is the contracting agency. The government file provides responses to contractor questions on issues such as fuel storage, first aid requirements, and availability of docking space. It also includes boring logs and a site visit sign-in sheet. The bid submission deadline is July 16, 2021.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Title: POPLAR ISLAND CELL 1C INLET REPAIRS, POPLAR ISLAND, MARYLAND
The purpose of this amendment is to:
1. Provide responses to RFIs
2. Provide B-30 boring log
3. Provide the site visit sign-in sheet *** BID SUBMISSION TIME: 11:00 AM EDT on 16 JULY 2021 ***
All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR21B0015
X 9B. DATED (SEE ITEM 11)
14-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jul-2021
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR21B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
USACE, BALTMORE DISTRICT
2 HOPKINS PLAZA
BALTIMORE MD 21201
to
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
(End of Summary of Changes) e1enxnh9
Typewritten Text
Netsanet (Netsy) Hailu
USACE
410-962-3528 netsanet.hailu@usace.army.mil
6/30/2021 ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 1/3
Controlled Unclassified Information (CUI) Only
Bid Inquiry Contractor Report All Inquiries
Project: Poplar Island Cell 1C Inlet Repairs Review: W912DR21B0015 (00001) (sorted by CommentID ) Displaying 7 inquiries.
Id Discipline Sheet Detail Spec 9299310 Transportation NA Comment Classification: Controlled Unclassified Information (CUI)
Will there be any docking space available for use or will the contractor need to provide a floating temporary pier?
On: Jun 25 2021.
Government Response. . There is no consistent docking space available for the Contractor's crew boat at Poplar Island. The Contractor should provide their own temporary floating pier to allow for safe crew boat docking and personnel access. The Contractor's pier location must be coordinated and approved by USACE prior to mobilization to the site. Potential locations for installation of a temporary pier are near the existing government personnel pier, within the embayment, or along the south side of Cell 11. On: Jun 30 2021
Current Request Status: Request Closed Information for this report is procurement sensitive.
9299322 Equipment NA
Can we bring barges and equipment in and offload near the inlet structure?
Government Response. . The water depths near the Cell 1C inlet structure will limit barge access, particularly at low tides. As shown on C-101 and C-102, the existing contours directly in front of the inlet are approximately -2 to -3 ft Poplar Construction Datum (PCD). In general, elevations in Poplar Harbor range from -3 to -6 ft PCD. On: Jun 30 2021
9299325 Other NA
Can USACE provide the boring logs?
Government Response. . The information for Boring Log B-30 is attached. On: Jun 30 2021
9299328 Equipment NA
Are there any limitations to fuel storage? Unleaded and diesel?
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 2/3
Government Response. . There are no restrictions on the type of fuel used on the site. All fuel must be stored safely and in accordance with the USACE
Safety Manual EM 385-1-1 (dated 30 November 2014). Fuel cubes and tanks of to 500 to 1000 gallons are often used by Contractors at Poplar Island, and can typically be stored in the vicinity of the Contract staging area (at least 25 feet away from office buildings/temporary storage structures).
Most tanks/cubes used on site are double-walled and technically do not need containment berms; however, most Contractors still use a containment berm under the tanks to avoid contaminating the island's soil, wetland areas and waterways. All single-walled tanks and cubes are required to have containment berms. The Contractor should coordinate the placement and storage of these tanks with the USACE Site Representative. On: Jun 30 2021
9299330 Other NA
Are there any specific first aid requirements for the job?
Government Response. . In accordance with the Contract Specifications and the EM 385-1-1, a designated Site Safety and Health Officer (SSHO) is required for this job and a detailed Accident Prevention Plan must be submitted and approved prior to mobilization. One site specific requirement is that the Contractor have a boat remain at the island during work hours to be used for personnel transport off the island in the event of an emergency. Since this is a remote site, the Contractor should have an effective means of communication so all personnel can call for assistance in the event of an emergency.
Standard USACE safety/first aid requirements also apply, including (but not limited to): at least 2 persons on each shift should be qualified to administer first aid and CPR, and at least one first aid kit for every 25 people. For more details on what- at minimum- should be included in the kits, please see Table 3-1 in the EM 385-1-1. The Contractor should also have a Blood-Borne Pathogen kit on hand, and it is highly recommended but not required to have an AED on site. On: Jun 30 2021
9299334 Engineering Management NA
Will the army corps provide specifications for the MSE wall or is it up to the prime contractor to have this engineered?
Government Response. . The Contractor is responsible for the design of the MSE wall. Please review Specifications Section 32 32 22 for details. On: Jun 30
9299470 Other NA will you make the sign in sheet available?
Government Response. . The site visit sign-in sheet has been posted on SAM.gov. On: Jun 26 2021 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 3/3
Report Complete
Controlled Unclassified Information (CUI) Only Patent 11/892,984 ProjNet property of ERDC since 2004.
http://projnet.com/index.php
File details come from the government source that posted it. Updated .