This document provides information on a pre-solicitation for the RECAPitalization of Utilities Load Centers & UPS EE-FF-GG project. The U.S. Army Corps of Engineers, Baltimore District intends to issue a request for proposal seeking a firm-fixed price design-build construction contract valued between $10 million and $25 million and with a construction duration of approximately 24 months. The project scope involves restoring, replacing, and reconfiguring critical uninterruptible power supply systems and associated infrastructure at Load Centers EE, FF, and GG located on Buckley Air Force Base, Colorado. Offerors must possess an active Top Secret Facility Site Clearance and utilize only U.S. citizens on the project. The prequalification requirements are being posted on the SAM website with qualifications due by March 9, 2020. Only prequalified firms will be invited to participate in the subsequent source selection process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECAP 2B PRESOLICITATION PREQUALIFICATION REQUEST FOR INFORMATION
QUESTIONS & RESPONSES
Date Question Answer 23 January
Could you please tell me if this is a new requirement, or if there is a current or previous contractor who has performed similar services? If available, can you please send along the incumbent contract or task order number?
This is a new requirement, being solicited as full and open competition; no portions of the project will be set aside.
February
Regarding Section 3.1 Requirement 1 (Volume 1, Tab A)
– Experience. Section 3.1.1.2 states “Projects shall include experience in two (2) to three (3) of the elements listed below”. There are five (5) “elements” listed under this Section. The last element is “The submitted projects shall be in the $10M - $25M range”.
The range appears to be listed as one of the elements, to be chosen as two (2) to three (3) elements of experience.
Question: Are all projects submitted for each element required to be in the range of $10M - $15M?
All projects are not required to be in the $10M - $25M range; Projects shall include experience in two (2) to three (3) of the elements listed. The $10M - $25M range is an element that can be chosen as one of the 2-3 elements of experience.
February
The submission requirement states 3.2.1.1. The project will require the contractor to have an active TOP SECRET Facility Site Clearance.
Question: Does this TOP SECRET Facility Site Clearance include Safeguarding? We are inquiring as a contractor can have a TOP SECRET Facility Site Clearance, but not be cleared for Safeguarding.
There is no requirement for production or storage of TS material at the contractor’s office, FOUO only. Site clearance for access is necessary, but there is no need to be cleared for Safeguarding.
4 March
Futron Incorporated is a small Design-Build Construction business. We maintain active Top Secret Facility Clearance. We are interested in pursuing the above project and has teamed with a local company in Colorado. Futron do not have the size of past performances required for prequalification.
Question: Will the Government consider lowering the size of past performance?
Note: Follow-up clarification email sent to determine if question was in reference to the minimum of 3 and maximum of 5 projects or the dollar value of the submitted projects.
Responding Email clarified question is referencing the dollar value of the submitted projects.
All projects are not required to be in the $10M - $25M range; Projects shall include experience in two (2) to three (3) of the elements listed. The $10M - $25M range is an element that can be chosen as one of the 2-3 elements of experience.