W912DR19R0020_Amendment__1.pdf
PDF 379 KB Posted
- Attached to
- Raystown Visitors Center Roof Replacement Federal contract opportunity
- Solicitation number
- W912DR19R0020
About this file
Amendment #1 - RFI's and Responses. Proposal Due Date Extension
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR19R0020_Amendment_02.pdf | ||
| EFT_Form_UFC_23.pdf | ||
| W912DR19R0020_Solicitation_Raystown_Roof_Replacement.pdf | ||
| SF_LLL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation is hereby amended to provide the follow ing in Amendment 1.
1. Extend the proposal due date to Friday, 15 February 2019.
2. Provide responses to "Request for Information (RFI's).
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR19R0020
X 9B. DATED (SEE ITEM 11)
23-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Feb-2019
CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
2 HOPKINS PLAZA
03-G-04
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR19R0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
RFI'S AMENDMENT #1
QUESTION 1: Drawing sheet A-5, under “Part 1- General” references new soffit and the drawing detail shows existing soffit and fascia to remain. Please clarify.
ANSWER: Soffit and Fascia are to remain. Remove Soffit and Fascia from Drawing Sheet A-5 Metal Roof Speculations part 1, General 1.01, work included.
QUESTION 2: During the site visit, a statement was made that a solar system may be installed after the installation of the new metal roof system. Due to the install instructions, this will not be possible without severe damage to the metal panels. The existing shingle roof will either need to be removed, or insulation will need to be installed between the specified 2x4 purlins to support the metal panels and allow for foot traffic and possible snow loads.
Please advise.
ANSWER: The metal specified in the solicitation FM 1750 1-3/4" X 18" snap lock standing seam on 24" center purlins will be sufficient. There is a typo in the Specifications on Drawing Sheet A-5 Metal Roof Speculations, part 2, products 2.01, change 1-1/2" High Architectural Snap-Lock Standing Seam to 1-3/4" High Architectural Snap-Lock Standing Seam and change 1-1/2" Integral Snap Lock to 1-3/4" Integral Snap Lock.
QUESTION 3: Specifications state that no material or equipment will be allowed to be stored on site. Please provide information as to where materials and equipment can be stored.
ANSWER: Materials will be able to be stored near the Maintenance Building 1.5 miles North West of the visitor's Center.
QUSTION 4: Will the lightning protection be required to be re-certified after the removal and reinstallation?
ANSWER: Yes
QUESTION 5: The metal roof panel that is called out in the specs is only made in 26G in order to get the 40Yr paint warranty, the coils that have the 40Yr paint are only made in 29G and 26G and the coating is by Akzo Nobel.
If the 24G is required the warranty would only be 30Yr. There is no way to price this roof accurately.
ANSWER: On drawing Sheet A-5 Metal Roof Speculations, part 1, General 1.06, Warranty. Replace 40 year finish warranty with 30 year finish warranty.
(End of Summary of Changes)
W912DR19R0020
File details come from the government source that posted it.