B.08.03_Solicitation_Amendment_0003_W912DR19B0021_-APG_Bldg_5103_Renos.pdf
PDF 1 MB Posted
- Attached to
- APG Building 5103 Renovations
- Solicitation number
- W912DR19B0021
About this file
Amendment 0003
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide the answ ers to the inquiries received during the Request for Information (RFI) period.
Accompanying attachments based on responses are provided along w ith an updated w age determination. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR19B0021
X 9B. DATED (SEE ITEM 11)
23-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2019
CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR19B0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been added by full text:
REQUEST FOR INFORMATION
SEE REQUEST FOR INFORMATION (RFI) RESPONSES AFTER UPDATED WAGE DETERMINATION
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
WAGE DETERMINATION
WAGE DETERMINATION DECISION
OF THE SECRETARY OF LABOR
The following wage determination will be used to conform with the requirements of the Davis-Bacon Act (40 U.S.C. 276a to 276a-7) of the Contract Clauses*:
Decision No. MD190034 dated 8/09/2019
* WAGE DETERMINATIONS: The provisions of the Davis-Bacon Act also apply to employees who work at off-site facilities such as batch plants, rock quarries, sand pits, and the like, which are setup exclusively to furnish material to the on-site construction site. Accordingly, contractors are required to maintain complete records on such employees. However, operations of a “commercial supplies” or “material-man” established in proximity to but not on the actual site of work prior to the opening of bids are not covered by the Act even if dedicated exclusively to the Federal project for a time. (29 CFR 5.2 (1))
"General Decision Number: MD20190034 08/09/2019
Superseded General Decision Number: MD20180048
State: Maryland
Construction Type: Building
County: Harford County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 01/11/2019 2 02/08/2019 3 04/05/2019 4 04/12/2019 5 05/03/2019 6 05/24/2019 7 06/07/2019 8 06/28/2019 9 07/19/2019 10 07/26/2019 11 08/09/2019
ASBE0024-007 04/01/2019
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 36.53 16.42+a
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
CARP0219-002 05/01/2019
Rates Fringes
MILLWRIGHT.......................$ 33.56 14.93
CARP0441-002 05/01/2018
Rates Fringes
PILEDRIVERMAN....................$ 30.18 15.03
ELEC0024-012 06/02/2019
Rates Fringes
ELECTRICIAN (Including low voltage wiring for and installation of alarms; HVAC controls)........................$ 38.00 5.25%+16.19
ELEC0024-013 06/02/2019
Rates Fringes
ELECTRICIAN (Communication and Sound Equipment).............$ 28.43 4.75%+13.02
PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day
ENGI0037-027 04/01/2017
Rates Fringes
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 26.98 12.85+a OPERATOR: Bulldozer.............$ 28.93 12.85+a OPERATOR: Forklift..............$ 28.93 12.85+a OPERATOR: Gradall...............$ 28.93 12.85+a OPERATOR: Loader (Front End) 1 1/4 yards and over........$ 28.93 12.85+a 1 Yard and Under............$ 26.98 12.85+a OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 28.93 12.85+a OPERATOR: Roller excluding Asphalt..........................$ 23.35 12.85+a
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.
IRON0016-012 04/01/2016
Rates Fringes
GLAZIER..........................$ 28.48 19.45
IRONWORKER (Fence Erection-Chain Link/Cyclone).....$ 28.23 19.45
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 28.48 19.45
IRONWORKER, SHEETING.............$ 28.73 19.45
LABO0710-003 04/01/2019
Rates Fringes
LABORER: Common or General......$ 18.25 6.06 LABORER: Mason Tender - Cement/Concrete..................$ 19.41 6.06
PAIN0051-024 06/01/2018
Rates Fringes
PAINTER
Brush, Roller, Spray, Drywall Finisher/Taper and Paperhanger.................$ 25.06 9.76 Industrial..................$ 31.10 11.48
PLAS0891-005 07/01/2018
Rates Fringes
PLASTERER........................$ 29.53 6.80
PLAS0891-006 02/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.45 11.28
PLAS0891-008 08/01/2016
Rates Fringes
PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
PLUM0486-013 12/16/2018
Rates Fringes
PLUMBER..........................$ 40.10 19.89
PLUM0486-014 12/16/2018
Rates Fringes
PIPEFITTER (Including HVAC Pipe Installation)...............$ 40.10 19.89
ROOF0030-033 07/01/2019
Rates Fringes
ROOFER, Excludes Installation of Metal Roofs...................$ 26.44 12.24
* SFMD0669-001 04/01/2019
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 35.60 21.97
SHEE0100-026 05/01/2019
Rates Fringes
SHEET METAL WORKER, Includes HVAC Duct Installation (Excludes Metal Roof Installation)....................$ 33.56 20.63
SUMD2010-082 04/30/2010
Rates Fringes
ABATEMENT WORKER: ASBESTOS
(Removal from Mechanical Systems).........................$ 12.60 3.91
BRICKLAYER (Excludes Pointing, Caulking and Cleaning)........................$ 23.88 5.86
CARPENTER (Acoustical Ceiling Installation Only)...............$ 16.00 2.60
CARPENTER (Drywall Hanging, Form Work, Metal Stud Installation and Scaffold Building Only)...................$ 17.55 5.07
CARPENTER, All other work........$ 17.76 5.14
ELEVATOR MECHANIC................$ 29.66 9.34
LABORER: Grade Checker..........$ 16.00 2.90
LABORER: Landscape..............$ 10.00 0.00
LABORER: Mason Tender - Brick...$ 14.76 7.73
LABORER: Mason Tender - Stone...$ 14.03 0.00
LABORER: Mortar Mixer...........$ 16.61 9.08
LABORER: Pipelayer..............$ 14.78 3.96
LABORER: Mason Tender (For Pointing, Caulking and Cleaning)........................$ 12.93 0.00
MASON - STONE....................$ 29.82 10.05
OPERATOR: Asphalt Roller........$ 21.35 5.38
OPERATOR: Backhoe...............$ 22.78 5.94
OPERATOR: Boom..................$ 21.44 8.29
OPERATOR: Crane.................$ 20.17 4.64
OPERATOR: Excavator.............$ 18.38 7.29
OPERATOR: Grader/Blade..........$ 16.75 5.79
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.75 0.00
SHEET METAL WORKER (Metal Roofs Installation)..............$ 20.71 6.23
TILE FINISHER....................$ 17.32 0.00
TILE SETTER......................$ 21.38 4.65
TRUCK DRIVER: Dump Truck........$ 15.40 1.96
TRUCK DRIVER: Tractor Haul Truck............................$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
The following have been deleted:
WAGE DETERMINATION
(End of Summary of Changes)
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: APG Building 5103 Renovations Review: W912DR19B0021 (00001) (sorted by CommentID ) Displaying 29 inquiries.
Id Discipline Sheet Detail Spec
8165089 General Section 00 10 00 - Solicitation PRICE
SCHEDULE
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The bid form has ten bid items none of which identify where the interior renovation work is to be priced. Please confirm which bid item the interior renovation work is to be assigned to.
On: Aug 29 2019.
Government Response. . An updated Bid Schedule will be provided via amendment. On: Sep 04 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8165109 Safety Section 014500 par 3.4.2 and Spec section 013526 par 1.6.1.1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec section 014500 par 3.4.2 states that the cqc shall have no other duties. Spec section 013526 par 1.6.1.1 says that the safety officer can be the cqc. Please clarify.
On: Aug 29 2019.
Government Response. . Spec section 014500 para 3.4.2 shall be the rule; the CQC shall be a person dedicated to quality control with no other duties. Per Spec section 014500, the safety officer shall not be the CQC. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8166223 Civil Drawing C 102 notes 5 and 6, and
Drawing C 103 note 6
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing C 102, notes 5 and 6 indicate that the asphalt work is not a part of this contract. Drawing C 103 note 6 states to provide asphalt overlay. Please confirm the extent of the asphalt work required by this project.
On: Aug 29 2019.
Government Response. . The asphalt work is not part of the contract. However, if asphalt is removed as part of any excavation (for the duct bank for example), it shall be replaced with new asphalt. No parking lot asphalt is included in the scope of this contract. Drawing C 103 note 6 will be corrected. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8170889 Site N/A N/A N/A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
As a small business opportunity, some of the MEP subcontractors would like the opportunity to see the building and could not attend the site visit on August 29th. Will there be a second site visit.
On: Sep 03 2019.
Government Response. . Additional site visits will not be provided. On: Sep 04 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8171008 Contracting Amendment 0002 Amendment 2
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 1 of 7ProjNet: Logged In User
9/13/2019https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
Amendment 0002 was just issued. We're not showing there was an Amendment 0001. Can you please confirm if there is an Amendment 0001 or is the Amendment 0002 just issued today supposed to be Amendment 0001?
On: Sep 03 2019.
Government Response. . Due to a numbering error, there is no Amendment 0001. The first amendment issued is Amendment 0002. On: Sep 04 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8172381 Architectural Design Documents Solicitation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can you please confirm if this project is Design Build or Design Bid Build?
On: Sep 04 2019.
Government Response. . This is a design-bid-build (DBB) project. On: Sep 04 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8173609 Contracting Solicitation pg 12 52.236-27 Site visit
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation state that site visits may be arranged during normal duty hours. Ahmed Majali stated at the site visit on 29 August that there would not be another opportunity to visit the site. As we were expecting to be able to return for a site visit with our subcontractors we had not brought subcontractors with us. Therefore we would like to know what subcontractors attended the site visit. Please provide a copy of the site visit sign in sheet.
On: Sep 04 2019.
Government Response. . A copy of the site visit sign-in sheet will be provided via amendment. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8173635 Contracting Civil Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The project documents include work shown on the civil drawings drawings that we were told are not to be included in the scope of the project by Ahmed Majali at the site visit on 29 August. Ahmed also mentioned that there are two elements on the civil drawings that are in the scope. A communications ductbank and the handicap ramp.
Please quantify those elements in scope on the civil drawings.
On: Sep 04 2019.
Government Response. . The comms ductbank, handicapped ramp, loading dock and all sitework required for the new utilities to the building shall be included. See attached Drawings for clarification (A.03.09 CIVIL - E5103 Building Renovation.pdf) On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8173665 Contracting HD102 02 82 00 Asbestos Remediation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please identify the extent of asbestos tile and asbestos containing mastic removal required in Room 100 as the removal of existing floor mounted equipment is not to occur.
On: Sep 04 2019.
Government Response. . Only loose tiles that are no longer adhered to the floor of Room 100 will be removed by hand. Mechanical tools are not permitted for use in this room. If tools are needed to remove tile, the tile shall remain in place. Care shall be taken as to not damage, chip or render friable the floor tile.
Floor tile mastic on the concrete slab will not be removed and will remain in place. Most loose tiles are laying under the computer room air conditioner units. However, the entirety of the 2,700 square foot floor shall be checked by hand for loose tiles. An estimated 25 square feet of loose floor tile is present in Room
100. On: Sep 13 2019
Current Request Status: Request Closed
Page 2 of 7ProjNet: Logged In User
Information for this report is procurement sensitive.
8175100 Architectural G001
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1.) The drawings currently state "Not For Construction" on the bottom right hand corner, will new drawings be sent out? Or should the project be bid from the already distributed drawings, plus any addenda?
On: Sep 05 2019.
Government Response. . The only changes to the drawings will be the development of the conformed set incorporating the RFI responses. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8175114 Architectural I001
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that all the furniture work will be part of the lump sum bid.
On: Sep 05 2019.
Government Response. . Furniture work contained in the specifications should be included as part of your lump sum bid. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8175127 Architectural Division 001
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If we need to make site visits with our subcontractors, who do we need to contact?
On: Sep 05 2019.
Government Response. . There are no additional site visits planned. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8175129 Architectural Division 001
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the sign-in sheet with all the contractors at the pre-bid meeting be distributed?
On: Sep 05 2019.
Government Response. . A copy of the site visit sign-in sheet will be provided via amendment. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8175136 Architectural Division 002
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
4.) At the pre-bid meeting we were told to bid the project according to the construction documents with the exception of the roof and site work.
If this is the case, should demolition and replacement of the roof, fascia, gutters and down spouts be excluded?
In addition, if site work is excluded, should we exclude all demolition and new work for the building with the exception of ramps, railings and any piping?
On: Sep 05 2019.
Government Response. . Demolition and replacement of the roof, fascia, gutters and downspouts should be excluded. In addition, demolition and new work associated with the site work is excluded with the exception of the ramps, stairs and railings for the main entry and loading dock, any piping, ductbank, and new concrete pads at entries and for new equipment. On: Sep 13 2019
Current Request Status: Request Closed
Page 3 of 7ProjNet: Logged In User
8175204 Architectural AD103 Note 23
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per 011100-1.2.1, work is to exclude roof replacement. However Note 23 on AD101 states that the roof is to be removed in its entirety. Please clarify roof scope.
On: Sep 05 2019.
Government Response. . Demolition and replacement of the roof, fascia, gutters and downspouts should be excluded. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8175277 Architectural Soliciation - Price Schedule 00 10 00 - Solicitation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The revised price sheet attached to Amendment 02, now has one line item. What about the items originally listed in the Solicitation? Are we to lump everything under this single line item?
On: Sep 05 2019.
Government Response. . Yes. One lump sum price. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8176400 Construction Management
Section 00 21 13 - Instructions to Bidders
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
See attached RFIs
(Attachment: Pre_Bid-RFI_001__W912DR-19-B-0021_Bldg_E5103_Renovation.pdf) On: Sep 06 2019.
Government Response. . RFIs received in inquiry 8176400 have been broken out and answered individually. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8177098 Contracting Architectural Demo Drawings
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The drawings do not differentiate CMU wall demolition from GWB wall demolition. As there is significant cost differences for the removal of the different types we need to have those wall types identified identified. If that is not possible we would like to revisit the site to identify the quantities of each type.
On: Sep 06 2019.
Government Response. . Backup documentation to differentiate CMU wall demolition from GWB wall demolition will be provided as separate files in upcoming amendment. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8178002 General Section 01 14 00 and Section 01 30
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 011400 seems to say that the US Citizenship requirement is only for work in that secure area – it says that delivery drivers accessing secure areas must be US Citizens. Section 013000 however, indicates that the whole project is to be US Citizen only. It states "All personnel working under this contract shall be US Citizens." Can the owner clarify? Must ALL personnel working under the contract be US Citizens, or only those accessing secure areas?
On: Sep 06 2019.
Government Response. . All personnel working under this contract shall either be a U.S. citizen or a legally documented worker. To access secure areas, personnel shall be a U.S. citizen. On: Sep 13 2019
Current Request Status: Request Closed
Page 4 of 7ProjNet: Logged In User
8183052 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
1. Are the racks or cabinets in the Server Farm Room 128 part of this contract, Provide and or install?
On: Sep 10 2019.
Government Response. . The racks and cabinets are shown for planning purpose only. They are not to be provided or installed. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183053 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
2. Room 129 Network Techs, What type of triangle symbol will be at each location in the Legrand surface raceway?
On: Sep 10 2019.
Government Response. . In Room 129 Network Techs, provide 4 data and 1 voice jacks at each location in the Legrand surface raceway. Provide this at every 6' on center along the length of the raceway. Note that there are 2 raceways at this location (disconnected at the middle, but should look aesthetically continuous). On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183054 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
3. Room 130 Help Desk Techs, What type triangle symbol will be used in each cubicle?
On: Sep 10 2019.
Government Response. . The cubicles are system furniture. There should be a furniture whip connected to the systems furniture. The whip shall connect to a junction box (represented by a T in a square at the left cubicle). On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183055 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
4. Room 103 Workroom T2 Tech, what type of triangle symbol will be used at each cubicle?
On: Sep 10 2019.
Government Response. . The cubicles are system furniture. There should be a furniture whip connected to the systems furniture. The whip shall connect to a junction box (represented by a T in a square at the top cubicle). On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183056 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
5. Temporary Facilities during renovation, at each desk location how many Data cables will be required?
Page 5 of 7ProjNet: Logged In User
On: Sep 10 2019.
Government Response. . A total of 15 data cables will be required for the entire temporary Facility. On:
Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183057 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
6. Temporary Facilities during renovation, at each desk location how many Voice cables will be required?
On: Sep 10 2019.
Government Response. . 10 Voice cables will be needed for the entire temporary facility. On: Sep 13
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183058 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
7. Ref. Section 011400-1.14 Coordination Drawings; Sub section B specifies the provision of coordination drawings from all trade diciplines. It is our understanding we will be provided a 100 percent fully prepared build package. Will coordination drawings be required or can coordination be completed onsite with the trades?
On: Sep 10 2019.
Government Response. . Coordination drawings will be required. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183059 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
8. As noted on the drawings the Roof work is not part of this contract. There are numerous mechanical penetration to patch and new penetrations to install. Who will be responsible for these penetrations at the Roof level?
On: Sep 10 2019.
Government Response. . The contractor is responsible for patch and repairing roof penetrations. On:
Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183060 Other NA NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
9. Ref. Section 200000-3.4; specifies bibration isolation with piping that is connecto to equipment to be provided with flexible connectors. Does this satisfy all isolation requirements for piping?
On: Sep 10 2019.
Government Response. . This satisfies isolation for plumbing piping covered under section 22 00 00. On:
Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8183061 Other NA NA
Page 6 of 7ProjNet: Logged In User
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Per inquiry 8176400
10. Will the government provide the specific instructions, conditions and notices the vendors should follow when submitting our proposal
On: Sep 10 2019.
Government Response. . Vendors should follow the instructions in the solicitation when submitting their proposal. On: Sep 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 7 of 7ProjNet: Logged In User
Site Visit Sign-In Sheet
UP
A
D
C.5
A.6
B.2
B.6
C.1
5.8
1C 2
1A 2
1A2
3 7
31 32
54'-7" 14'-9"
'-8
'-8
'-8
'-8
'-8
'-4
008(E)
8"
2' -0
1C
1A
GENERAL DEMOLITION NOTES
1. REFER TO AD001 FOR GENERAL DEMOLITION
NOTES.
KEYED DEMOLITION NOTES
INTERIOR
REMOVE PARTITIONS, AND ASSOCIATED
COMPONENTS IN THEIR ENTIRETY TO INLCUDE
FOAM ACOUSTICAL TILES, GYPSUM BOARD AND
TRANSITE PANEL FURRING, FURRING AND
FRAMING SYSTEMS, AND CMU WALLS UNO.
REFER TO HAZMAT FOR LOCATION OF ASBESTOS
TRANSITE WALL PANELS. REFER TO GENERAL
NOTES AD001 FOR COORDINATION WITH OTHER
DISCIPLINES.
GWB PARTITION WITH WOOD STUDS, VIF
GWB PARITION WITH MTL STUDS, VIF
6" CMU PARTITION, VIF
6" CMU PARTITION W/ GWB FURRING, VIF
8" CMU PARTITION, VIF
TRANSLUCENT RESIN DIVIDER PAVEL, VIF
REMOVE ALL FLOORING SYSTEMS, FINISHES, AND
WALL BASES IN THEIR ENTIRETY TO INCLUDE
RAISED ACCESS FLOOR, CARPET, CERAMIC TILE,
VCT, AND ASBESTOS FLOOR TILE UNO. REFER TO
HAZMAT DEMOLITION DRAWINGS FOR LOCATION
OF ASBESTOS FLOOR TILE.
REMOVE ALL CEILING SYSTEMS IN THEIR
ENTIRETY TO INLCUDE GYPSUM BOARD, FURRING,
ACOUSTICAL CEILING PANELS, AND SUSPENDED
GRIDS, AND FOAM ACOUSTICAL TILES. SEE
GENERAL NOTE 1 FOR COORDINATION WITH
OTHER DISCIPLINES.
REMOVE DOOR, FRAME, AND ASSOCIATED
HARDWARE.
REMOVE WALL PANEL FURRING, FURRING AND
FRAMING SYSTEMS, AND INSULATION. CLEAN
CMU PARITITIONS FOR NEW WORK. REFER TO
HAZMAT FOR LOCATION OF ASBESTOS TRANSITE
WALL PANELS.
REMOVE 12" CMU WALL TO CREATE OPENING UP
TO 10’-0” AFF, VIF. ALIGN TO CLOSEST CMU
COURSING. REFER TO STRUCTURAL DEMOLITION
DRAWINGS.
REMOVE CASEWORK IN THEIR ENTIRETY TO
INCLUDE CABINETS, DRAWERS, DESKS,
COUNTERTOPS, SHELVING, HARDWARE, AND
ASSOCIATED ACCESSORIES.
REMOVE RAISED ACCESS FLOOR INCLUDING WALL
BASE AND STEPS.
REMOVE ALL COMPONENTS OF THE TOILET
ROOMS AND SHOWER IN THEIR ENTIRETY TO
INCLUDE WALLS, FIXTURES, TOILET/URINAL
PARTITIONS, ACCESSORIES, FLOORING, AND
CEILINGS.
REMOVE ALL ACOUSTICAL CEILING PANELS AND
SUSPENDED GRIDS. EXISTING GWB CEILING AND
SOFFITS TO REMAIN WITH EXCEPTION OF CURVED
SOFFIT FOLLOWING THE VTC WEST WALL. REFER
TO NEW WORK. SEE GENERAL NOTE 1 FOR
COORDINATION WITH OTHER DISCIPLINES.
REMOVE STUDIO LIGHTS, FRAMING, CURTAINS,
CURTAIN TRACKS, AND ACCESSORIES FROM
WALLS AND CEILING.
REMOVE STEEL VAULT DOOR FRAME.
REVOVE 12" CMU WALL FOR 5' X 7' WALL OPENING,
REFER TO NEW WORK.
REMOVE 10" CONCRETE WALL TO CREATE
OPENING FOR DOOR, REFER TO NEW WORK.
REMOVE CONCRETE PAD.
REMOVED AV CABINET. SALVAGE AV EQUIPMENT
IN CABINET FOR REINSTALLATION WITH NEW
WORK.
REMOVE WALL TO CREATE OPENING AT 12’-5” AFF,
VIF. ALIGN OPENING CLOSEST CMU COURSING.
REFER TO STRUCTURAL DEMOLITION DRAWINGS.
REMOVE DOOR, FRAME, AND ASSOCIATED
HARDWARE. PREPARE OPENING FOR WIDER
DOOR. REFER TO NEW WORK.
EXISTING SINK, CABINETRY, AND COUNTERTOP TO
REMAIN.
EXISTING BUILT-IN CONFERENCE DESKS TO
REMAIN.
PROVIDE OPENING FOR LOUVER. REFER TO NEW
WORK.
REMOVE CONCRETE SLAB FOR NEW DEPRESSED
SLAB AT NEW SHOWER. REFER TO NEW WORK.
EXTERIOR
REMOVE EXISTING ROOFING ASSEMBLY IN ITS
ENTIRETY INCLUDING INSULATION, PROTECTION
BOARDS, MEMBRANES, PERIMETER FLASHING,
ADHESIVES, GUTTERS, FASCIA, AND
DOWNSPOUTS. NIC.
DEMOLISH EXTERIOR CONCRETE SLAB AT
ENTRANCE, STAIRS, RAMPS, WALLS, AND
HANDRAILS. FOUNDATION TO REMAIN. REFER TO
STRUCTURAL DRAWINGS.
REMOVE LOADING DOCK CONCRETE SLAB, WALLS,
AND ASSOCATED GUARD RAIL. FOUNDATION TO
REMAIN. REFER TO STRUCTURAL DRAWINGS.
DEMOLISH WOOD RAMP AND CONCRETE STAIRS
LOCATED UNDER THE RAMP IN THEIR ENTIRETY
REMOVE CONCRETE PAD.
REMOVE STOREFRONT DOOR AND ASSOCIATED
FRAMES, HARDWARE, SIDELIGHTS AND
TRANSOMS IN THEIR ENTIRETY AT THE BASEMENT
AND FIRST FLOOR ENTRY VESTIBULE.
REMOVE STOREFRONT DOOR, FRAME, AND
HARDWARE.
REMOVE METAL DOOR, FRAME, AND HARDWARE.
REMOVE TRANSOM AND FRAME ABOVE DOOR.
REMOVE EXTERIOR WINDOW AND ASSOCATED
FRAME, IN THEIR ENTIRETY.
REMOVE WINDOW AND FRAME.
REMOVE SECURITY GRATING AT OPENING.
REMOVE LOUVER AND ASSOCIATED FRAME IN
THEIR ENTIRETY.
REMOVE BRICK INFILL PANEL.
REMOVE TRANSITE PANEL SOFFIT UNDERNEATH
ROOF CANOPY.
REMOVE CONCRETE PAD.
REMOVE CANVAS CANOPY.
REMOVE ROOF HATCH. NIC.
REMOVE CHAINLINK FENCE AND POSTS.
DEMOLISH CONCRETE STAIRS, WALLS,
FOUNDATION, HANDRAILS, AND SIDEWALKS EAST
SIDE WALL. REFER TO CIVIL.
REMOVE ASBESTOS TRANSITE PANEL AT SOFFIT
BELOW ROOF OVERHANG, REFER TO HAZMAT.
PROVIDE OPENING FOR LOUVER. REFER TO NEW
WORK.
1A
1B
1C
1D
1E
1F
8' 4' 0 8' 16' 1/8"=1'-0"
1 2 3 4
D
C
B
A
GRAPHIC SCALES
E
PLAN NORTH
©2019 AECOM Corporation
NOT FOR CONSTRUCTION
A
PP
R
D A
TE
D
ES
C
R
IP
TI
O
N M
A R
K
Baltimore District
D at e:
D ra w in g N um be r:
Fi le n am e:
Pl ot d at e:
C kd b y:
D w n by
D es ig ne d by
Su bm itt ed b y:
Pl ot s ca le
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BA
LT
IM
O
R E
D
IS
TR
IC
T
BA
LT
IM
O R
E, M
AR
YL
AN
D
Sheet Number:
US Army Corps of Engineers
W ils on B lvd , S ui te
AE
C
O M
Ar lin gt on
, V A
F-
0-
-1
C hi ef
B ra nc h
R ev ie w ed b y:
D es ig n fil e no
R ev
AB
ER
D
EE
N
P R
O
VI
N G
G R
O U
N D
, M D
B U
IL
D
IN
G
E
R
EN
O
VA
TI
O N
A
PP
R
D A
TE
D
ES
C
R
IP
TI
O
N M
A R
K
SHEET OF 170
BA
SE
M
EN
T
FL
O O
R P
LA
N
D
EM
O
LI
TI
O
N
AD101
D es ig ne r
Au th or C he ck er
1/8" = 1'-0"AD101
1 BASEMENT DEMOLITION
BA
CK
CH
EC
K S U
BM
IS
S I
ON
.25
.20
6' -0
6' -0
'-0
A
D
C
B
F
1 2 4
E
104103
21C
3 4 9
21C
4 7
21D 3 4
32313231 26 29
3029 30 29
36 36
21C
3 4
21C
23232323 4 4
3131 31 31 31 31
23 7
21C
21C
21C 43 7
21C 43 7
1C
1C
1C
1C 2
1C 2
2 3
21B
1B 41B 4
21B
1A
1A
231C
1A
1B4
1E 4
6 41C
123 120
113114115116
42'-2" 18'-0" 31'-8"
'-1
0" 7'
-2
'-0
'-6
'-2
54'-8" 69'-4"
AREA OF 24/7 OWNER USE.
SPACE AND EQUIPMENT SHALL
REMAIN ACTIVE AND
OPERATIONAL AT ALL TIMES.
PROVIDE TEMPORARY HVAC TO
MAINTAIN SPACE TO
CONTRACTING OFFICER’S
REQUIREMENTS.
MAINTAIN OWNER ACCESS AND
EGRESS 24/7 THROUGHOUT THE
DURATION OF CONSTRUCTION.
PROVIDE DUST CONTROL TO
PREVENT CONSTRUCTION DUST
FROM ENTERING THE SPACE.
5'-0"
'-8
/2 " V
IF
1'
-4
2' -9
19'-5" VIF
18 18 18 18 4
29 41
1E 1E
8"
3' -4
1F
8" 3'-4" 3'-4" 7'-0"
VIF
1'-10 1/2"
6'-0" 4'-8"6' -0
4'-0" VIF
1C
16'-9" VIF
1'-0"
3'-0"
1A
1E 1E
GENERAL DEMOLITION NOTES
1. REFER TO AD001 FOR GENERAL DEMOLITION NOTES.
2. ROOF DEMOLITION IS NOT WITHIN THE SCOPE OF
THIS CONTRACT AND SHALL BE COORDINATED WITH
DPW. THIS INCLUDES ROOF SYSTEM, FASCIA,
GUTTERS, DOWNSPOUTS, CURBS, ROOF HATCH, ETC.
THIS DOES NOT PRECLUDE INCIDENTAL WORK
ASSOCIATED WITH OTHER TASKS WITHIN THE
CONTRACT. NEW ROOF PENETRATIONS AND
PATCHING SHALL BE COORDINATED WITH ROOF
WARRANTY REQUIREMENTS.
KEYED DEMOLITION NOTES
REFER TO AD101 FOR KEYED DEMOLITION NOTES.X
8' 4' 0 8' 16' 1/8"=1'-0"
1 2 3 4
D
C
B
A
GRAPHIC SCALES
E
PLAN NORTH
©2019 AECOM Corporation
NOT FOR CONSTRUCTION
A
PP
R
D A
TE
D
ES
C
R
IP
TI
O
N M
A R
K
Baltimore District
D at e:
D ra w in g N um be r:
Fi le n am e:
Pl ot d at e:
C kd b y:
D w n by
D es ig ne d by
Su bm itt ed b y:
Pl ot s ca le
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
BA
LT
IM
O
R E
D
IS
TR
IC
T
BA
LT
IM
O R
E, M
AR
YL
AN
D
Sheet Number:
US Army Corps of Engineers
W ils on B lvd , S ui te
AE
C
O M
Ar lin gt on
, V A
F-
0-
-1
C hi ef
B ra nc h
R ev ie w ed b y:
D es ig n fil e no
R ev
AB
ER
D
EE
N
P R
O
VI
N G
G R
O U
N D
, M D
B U
IL
D
IN
G
E
R
EN
O
VA
TI
O N
A
PP
R
D A
TE
D
ES
C
R
IP
TI
O
N M
A R
K
SHEET OF 170
FI
R
ST
F
LO
O
R P
LA
N
D
EM
O
LI
TI
O
N
AD102
D es ig ne r
Au th or C he ck er
1/8" = 1'-0"AD102
1 FIRST FLOOR DEMOLITION
BA
CK
CH
EC
K S U
BM
IS
S I
ON
.25
.20
| B.08.03 Solicitation Amendment 0003 W912DR19B0021 - APG Bldg 5103 Renos |
| A.03.17 RFI Responses from ProjNet 13 SEP 2019 |
| I.01.11 Site Visit Roster APG E51030 |
| A.03.09 60589586_E5103_AD101 - BASEMENT FLOOR PLAN DEMOLITION_Revised_2019-09-09 |
| Sheets |
| AD101 - BASEMENT FLOOR PLAN DEMOLITION |
| AD102 - FIRST FLOOR PLAN DEMOLITION |
| A.03.09 60589586_E5103_AD102 - FIRST FLOOR PLAN DEMOLITION_Revised_2019-09-09 |
| Sheets |
| AD101 - BASEMENT FLOOR PLAN DEMOLITION |
| AD102 - FIRST FLOOR PLAN DEMOLITION |
File details come from the government source that posted it.