Abstract of Bids for Forebay Dredge System Modifications at Washington Aqueduct, Solicitation No. W912DR18B0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR18B0006_AMENDMENT_0002_09FEB18.pdf | ||
| W912DR18B0006_AMENDMENT_I_012618.pdf | ||
| W912DR18B0006_FOREBAY_DREDGE_SYSTEM_MODIFCATIONS_WAD_SOLICITATION_011918.pdf | ||
| W912DR18B0006_FOREBAY_DREDGE_SYSTEM_MODIFCATIONS_WAD_SPECIFICATIONS_011918.pdf | ||
| W912DR18B0006_FOREBAY_DREDGE_SYSTEM_MODIFCATIONS_WAD_DRAWINGS_011918.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3. DATE OPENED PAGE
21-Feb-18 1 of 2
4. ISSUING OFFICE Name and title of Certifying Official (Type)
I CERTIFY that I have opened, read, and USACE, BALTIMORE DISTRICT recorded on this abstract all offers Signature Date Signed 21 Feb 2018 2 HOPKINS PLAZA, ROOM 03-G-01 received in response to this solicitation.
BALTIMORE, MD 21201 Contracting Officer: ASHLEY M. WINGFIELD
5. PROJECT TITLE
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)
C. REASONABLE CONTRACT C. Amendment Acknowledged C. Amendment Acknowledged (Including Profit)
7A. 7B. 7C. D. E. F. E. F. E. F.
ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED
No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the Forebay Dredge System Modifications project, complete as shown on the drawings and as specified, but exclusive of the work covered under Optional Items 0002 and 0003.
1 Job XXX 1,344,440.00$ XXX 1,909,225.00$ XXX 1,834,000.00$
TOTAL BASE BID AMOUNT 1,344,440.00$ 1,909,225.00$ 1,834,000.00$
Option
All costs in connection with construction of Bid Option 1 complete, as shown on the drawings and as specified.
1 Job XXX 492,421.00$ XXX 215,000.00$ XXX 500,000.00$
All costs in connection with construction of Bid Option 2 complete, as specified in Section 01 80 00 RECOMMISSIONING and Section 23 08 00.00 10
RECOMMISSIOING OF HVAC SYSTEMS.
1 Job XXX 79,199.00$ XXX 30,000.00$ XXX 100,000.00$
TOTAL ESTIMATED OPTIONAL AND BASE BID AMOUNT 1,916,060.00$ 2,154,225.00$ 2,434,000.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER
6. NUMBER OF AMENDMENTS ISSUED: 1 (one)
Yes
Bid Bond 20%
19-Jan-18W912DR18B0006
Forebay Dredge System Modifications, Washington Aqueduct Washington, D.C.
No. 1
9. OFFERS
Bid Bond 20%
CPP Construction Company, Inc.
362 B Christopher Avenue Gaitehrsburg, MD 20879
Yes
No. 2
Norair Engineering Corp.
337 Brightseat Rd. Suite., 200
Landover, MD. 20785
Ashley M. Wingfield
1. SOLICITATION NUMBER PAGE
ABSTRACT OF OFFERS W912DR18B0006 2 OF 2
CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
B. BID SECURITY (Type and Amount)B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the Forebay Dredge System Modifications project, complete as shown on the drawings and as specified, but exclusive of the work covered under Optional Items 0002 and 0003.
1 Job XXX 2,005,000.00$ XXX 2,522,000.00$
TOTAL BASE BID AMOUNT 2,005,000.00$ 2,522,000.00$
Option
All costs in connection with construction of Bid Option 1 complete, as shown on the drawings and as specified.
1 Job XXX 363,000.00$ XXX 394,000.00$
All costs in connection with construction of Bid Option 2 complete, as specified in Section 01 80 00 RECOMMISSIONING and Section 23 08 00.00 10
RECOMMISSIOING OF HVAC SYSTEMS.
1 Job XXX 72,000.00$ XXX 63,000.00$
TOTAL ESTIMATED OPTIONAL AND BASE BID AMOUNT 2,440,000.00$ 2,979,000.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1OPTIONAL FORM 1419 (11-88)
2. PROJECT TITLE
Bid Bond 20%
Yes Yes
OFFERS (Continued)
Forebay Dredge System Modifications, Washington Aqueduct Washington, D.C.
No. 6No. 3 No. 4
American Contracting & Environmental Services, Inc.
10330 Old Columbia Rd., Suite 102 Columbia, MD 21046
W.M. Schlosser Company, Inc.
2400 51st Place
Hyattsville, MD 20781
Bid Bond 20%
No. 5