UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: East Campus Building 3 (ECB3) Review: W912DR-17-R-0038 (00001) (sorted by CommentID ) Displaying 17 inquiries.

Id Discipline Sheet Detail Spec

7477911 General RFP

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

This contract requires the firm to possess, at the time of proposal and the time of award an ACTIVE facility clearance issued by the Defense Security Service (DSS). If bidding as a joint venture, are ALL team members required to hold an Active facility clearance at the time of proposal and award or can one team member and the designer of record hold the required clearance?

On: May 18 2018.

Government Response. . Active Facility Clearance is not required at time of award nor is it a requirement to obtain during construction. There is a requirement for certain key personnel to have a Top Secret Clearance for access to classified information necessary to design the facility. A formal amendment will be issued to edit the following:

Overview 4. Security Requirement -Delete 1st sentence, and "Additionally" from second sentence.

1.2.4 Phase 1 Factor 2 - Delete last 2) Sentence stating " At all times, at least one of nine key...."

1.2.5 Phase I Factor 3 Workforce and Subcontractor Management - Delete 3rd sentence "The Prime Contractor must have a Top Secret Facility Clearance." On: May 18 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7477918 General Security Requirements Section 00 21 16

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Per Section 00 21 16 4. Security Requirements (Page 4 of the Solicitation), can the Government confirm that an ACTIVE facility clearance is required by the Prime Offeror in order to submit a proposal/bid on this project?

On: May 18 2018.

Government Response. . Active Facility Clearance is not required at time of award nor is it a requirement to obtain during construction. There is a requirement for certain key personnel to have a Top Secret Clearance for access to classified information necessary to design the facility. A formal amendment will be issued to edit the following:

Overview 4. Security Requirement -Delete 1st sentence, and "Additionally" from second sentence.

1.2.4 Phase 1 Factor 2 - Delete last 2) Sentence stating " At all times, at least one of nine key...."

1.2.5 Phase I Factor 3 Workforce and Subcontractor Management - Delete 3rd sentence "The Prime Contractor must have a Top Secret Facility Clearance." On: May 18 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7478409 Contracting Page 17

1.2.5 Phase I - Factor

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are there any conflicts of interest that should be avoided, such as which firm is preparing the RFP and/or are there any contractors supporting the Government for this project?

On: May 18 2018.

Government Response. . In a forthcoming Amendment - Potential Organizational Conflicts of Interest for ECB3 will need to be amended in the RFP to include : Jacobs, MBP, and Parsons. Use similar language from W912DR-15-R-0024 Phase I Solicitation dated 30SEP15 Volume I: Technical Proposal Tab B. on page

6. On: May 18 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7483236 Construction Management NA

Page 1 of 5ProjNet: Logged In User

5/30/2018https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We are asking contracting offices for consideration to add FAR 52.208-9 for SKILCRAFT door hardware in your current and future acquisition as it now applies to construction and renovation "flow down" situations per US AbilityOne Commission Procurement List Notice of Addition #20150054 (9 Feb 2016).

The architect's specification is the difference. Architecturally Specified Products ARE called out as an "ingredient" in construction and renovation products. PL #20150054 of 9 Feb 2016 added 90 door hardware products compliant to ANSI and BHMA certification IRT FAR 8.005 and 36.202.

SKILCRAFT Door Hardware products are architecturally compliant in specification DIVISION 08 OPENINGS, SECTION 08 71 00 DOOR HARDWARE; ANSI/BHMA A156.2 Cylindrical Locks, ANSI/BHMA A156.3 Exit Devices, ANSI/BHMA A156.4 Door Closers, ANSI/BHMA A156.13 Mortise Locks. SKILCRAFT locksets ARE Small and Large Format IC compatible.

FAR 52.208-9 for mandatory and specific sourcing does not require a separate CLIN because the product is architecturally specified for construction and renovation requirements. The product is going to the job site by the same project incorporation as all other materials specified by the architect.

Recommended text. "The following items have been identified to be obtained from a mandatory AbilityOne source in compliance with FAR clause 52.208-9, Contractor Use of Mandatory Sources of Supply or Services:

DIVISION 08 – OPENINGS, 08 71 00 DOOR HARDWARE; SKILCRAFT Brand Exit Devices, Door Controls – Closers, Mortise Locks & Latches. Pricing and availability may be obtained from SKILCRAFT PDQ at 1-855-NIB- SPEC (1-855-652-7732) or SKILCRAFT.ASP@VISIONCORPS.NET.

Additional items may be available from the mandatory source. AbilityOne's procurement products list can be searched at: www.abilityone.com (End of text)"

On: May 22 2018.

Government Response. . The clause will not be added during Phase I. If we fill this clause is needed in Phase II it will be included. On: May 24 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7486573 Other DD254 1a-1b

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Based on Amendment 001 provided by the Government, all requirements for a Top Secret Facility Clearance were removed from the solicitation. Please provide a revised DD Form 254 that clarifies the level of facility security clearance (1.a) and level of safeguarding for classified information/material required at contractor facility (1.b).

On: May 23 2018.

Government Response. . Attachment E: DD Form 254 shall be removed from the solicitation. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7486583 Other RFQ Technical

Solicitation Section 4

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 4 – Security Requirements states, "All others working on this contract must be able to meet suitability requirements for a Homeland Security Presidential Directive 12 (HSPD-12) background investigation (National Agency Check with Inquiries (NACI) or equivalent background check)". Please clarify the following:

1. Is the intent of this requirement that all personnel/workforce working on the contract or only personnel/workforce that requires access to the site?

2. The HSPD-12 requirement was not included in previous solicitations at East Campus. Does this process differ from personnel vetting processes that have been used on previous East Campus contracts?

3. If the intent is that all personnel/workforce are required to have HSPD-12 approval, would the Government be willing to adjust this requirement to only personnel who will be on site 6 months or longer?

On: May 23 2018.

Government Response. . In a forthcoming amendment Page 3 of 43 Section 4 to be deleted. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7486586 Other Section 4

Page 2 of 5ProjNet: Logged In User

RFQ Technical Solicitation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 4 – Security Requirement states, "A TOP SECRET clearance is required by the Designer of Record (DOR) and any design-build personnel that need to access the Design Basis Threat (DBT) and Risk Acceptance Memos in order to develop the final project design." Please clarify if the DBT and Risk Acceptance Memos will be available to access during the Phase II response period or Post Award.

On: May 23 2018.

Government Response. . The Design Basis Threat and Risk Acceptance Memos will not be provided until after Award. The RFP will state requirements that the Designer will need in order to prepare a bid. On:

May 24 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7487154 General Solicitation 1.2.9 E Phase II

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What level (programmatic, conceptual, schematic etc.) of bridging documents (drawings and specifications) will the government include in phase 2 of the solicitation to the shortlisted bidders to prepare their price proposals?

Will it be similar to the level of documentation provided during phase 2 of previous East Campus (e.g. ECB1, 2) contracts?

On: May 24 2018.

Government Response. . The RFP is mainly performance based, however there are some prescriptive requirements due to the nature and location of the project. The RFP will include Site and Phasing Plans for the campus. The RFP will state the project requirements and program in narrative form using tables, room data sheets, and illustrations to supplement the text. On: May 24 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7487158 General Solicitation 1.2.9 E. Phase II

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What will be the proposal period (calendar days) for phase 2 of the solicitation?

On: May 24 2018.

Government Response. . Phase II proposal period will be determined at a later date. On: May 24 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489722 Other Solicitation pg 21 of 98

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm the correct Standard Form LLL to use for this submission is dated 07/1997 via the General Services Administration website. (https://www.gsa.gov/forms-library/disclosure-lobbying-activities)

On: May 25 2018.

Government Response. . Confirm - correct form is dated 07/1997. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489728 Other Solicitation pg 24 of 98

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm if the Offeror and its captive team members have previously submitted a Standard of Affiliation within the last 36 months, do they need to resubmit for this submission? If so, what volume does this form need to go in?

On: May 25 2018.

Government Response. . A new SOA is required and it will need to be in a separate envelop. On: May 30 2018

Page 3 of 5ProjNet: Logged In User

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489731 Other Solicitation pg 20 of 98

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

As stated on page 20 of 98 of the solicitation, the proposals must be in an 8-1/2" x 11" format with the exception of the organizational chart, for which a folded 11" x 17" format may be used and shall be counted as one page provided the only information presented is the organization chart. Will it be acceptable to submit additional project and key personnel matrices on 11" x 17" pages?

On: May 25 2018.

Government Response. . It is acceptable to submit additional project and key personnel matrices on 11" x 17" format. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489779 Design Team Leader 22 page 22

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide a description to the extent and expected contents of the Bridging Documents that will be provided to the shortlisted teams.

On: May 25 2018.

Government Response. . The RFP is mainly performance based, however there are some prescriptive requirements due to the nature and location of the project. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489794 Design Team Leader page 22 of 98 page 22 of 98

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please add the option of an Phase Two Team Interview in lieu of a BAFO or formalized response to comments to save time and improve potential communication of desired outcomes.

On: May 25 2018.

Government Response. . The Government is currently under Phase I solicitation therefore no changes are being made to Phase II. Phase II changes will be issued at a later date to the contractor's selected for Phase II. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489823 Architectural page 22 of 98 Solication page 22 of

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please include a amended clause that all Phase 2 non-awardee design documents, renderings and models can be obtained by their offers at the conclusion of award/ debrief process.

On: May 25 2018.

Government Response. . The Government is currently under Phase I solicitation therefore no changes are being made to Phase II. Phase II changes will be issued at a later date to the contractor's selected for Phase II. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489862 General SOL page 22 of 98 SOL page 22 of 98

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please include the option that ECB3 Government Users / occupants will be available for communication on potential Best Value design and Trade-off benefits.

On: May 25 2018.

Page 4 of 5ProjNet: Logged In User

Government Response. . The Government is currently under Phase I solicitation therefore no changes are being made to Phase II. Phase II changes will be issued at a later date to the contractor's selected for Phase II. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7489927 General Amend 1 page 10 of 43 page 10 of 43

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Under a USACE RSFO SATOC/ MATOC, projects can meet all relevant criteria except the $100M and that is primarily due to USACE phased project funding - not because of complexity, scale and cost of project. Delete this requirement so relevant can be considered on merit and mission evaluation criteria.

On: May 25 2018.

Government Response. . The requirement will remain unchanged. Please propose as stated in the solicitation. On: May 30 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.