Amendment_W912DR-17-R-0001_00001.pdf

PDF 1 MB Posted

Attached to
Clearwell Reservoir Cleaning Service Contract for Washington Aqueduct
Solicitation number
W912DR-17-R-0001
Issued by

About this file

Amendment 0001, response to RFI

View the file

Other files

File Type Posted
C05_Amendment_W912DR-17-R-0001_00002.pdf PDF
W912DR-17-R-0001_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to respond to the Requests For Information (RFI) and to extend the solicitation closing date. The new closing date is 10 April 2017, at 2PM EST. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-17-R-0001

X 9B. DATED (SEE ITEM 11)

24-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Mar-2017

CODE

U.S. ARMY CORPS OF ENGINEERS, BALTIMORE

10 S. HOWARD STREET

ROOM 7000

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-17-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Mar-2017 02:00 PM to 10-Apr-2017 02:00 PM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

REQUEST FOR INFORMATION (RFI)

(RFI) Request for Information Clearwell Cleaning for Washington Aqueduct, Washington, DC

Solicitation W912DR-17-R-0001

Q1 - List of Items, Schedule of Requirements, Scope of Work, Terms of Reference, Bill of Materials required, tender document.

A1 – All available documents are available at no cost on www.fbo.gov.

Q2 - Names of countries that will be eligible to participate in this tender.

A2 – This is a full and open competition.

Q3 - Information about the Tendering Procedure and Guidelines

A3 - Please see the solicitation documentation on www.fbo.gov.

Q4 - Any Addendum or Pre Bid meeting Minutes?

A4 – No.

Q5 - We are requesting that the bid submittal date be postponed at least two weeks so that we may be able to obtain and analyze samples of the sludge in the Reservoirs and Clearwells, as well as, to provide us with sufficient time to properly prepare the Technical Offer and Past Performance Volumes requires by the bid.

A5 – The bid submittal date will be revised from 27 MAR 2017 to 10 APR 2017. It is not possible to access the reservoirs or clearwells for the purposes of obtaining samples of in-situ materials while those facilities are in service. No opportunity will be provided to obtain and analyze samples prior to the bid submittal date.

Q6 - If we are not permitted to obtain samples, will the USACE provide samples to the contractor or provide data on the sludge contained in each and every Reservoir and Clearwell listed in the bid including % solids in place.

A6 – No samples or data beyond that contained in the solicitation will be provided by the Government prior to the bid submittal date.

Q7 - When was the last time each of the facilities listed in the specifications were cleaned and what was the frequency of cleaning over the last 3 years?

A7 – The McMillan North Clearwell and 3rd High Reservoir were cleaned in 2016. The 1st High Reservoir was cleaned in 2015. The Dalecarlia 30 MG Clearwell was cleaned in 2007. The McMillan South Clearwell, the 2nd High Reservoir, and the Dalecarlia 15 MG Reservoir were cleaned in the late 1990’s.

Q8 - Please provide us with the costs associated with the last time that clean-out services where performed on the Reservoirs and Clearwells.

A8 – This is considered a new requirement.

Q9 - Please provide the budget for this effort.

A9 – The government does not provide estimates or budgets.

Q10 - Please provide us with the access dimensions for the Third High Distribution Reservoir.

A10 – The 3rd High Reservoir access dimensions are shown on Sheet SK-7, dated 17 May 2016, provided in the solicitation.

Q11 - Please clarify on the pricing page why disinfection is listed as part the scope of work for all the sites to be cleaned when in the Specifications, Section 2.9, page 20, it is not. Is disinfection required for both the Clearwells and the Reservoirs?

A11 – Following cleaning by the Contractor, the Government will be responsible for disinfection of the McMillan North Clearwell, the McMillan South Clearwell, the Dalecarlia 15 MG Clearwell and the Dalecarlia 30 MG Clearwell. Following cleaning by the Contractor, the Contractor will be responsible for disinfection of the 1st High Reservoir, the 2nd High Reservoir, and the 3rd High Reservoir, per Section 2.9 of the Performance Work Statement.

Q12 - Will work be required during the winter season of November thru March? If so, additional costs would be required to perform cleaning services in subfreezing weather.

A12 – Individual Task Orders may be issued at any time during any given year according to the terms of the contract, including the winter season.

Q13 - Can the contractor set-up dewatering equipment at the MacArthur Blvd. location for the purpose of operating a centralized dewatering station?

A13 – Layout areas associated with each of the individual facilities are given in site plans Sheet SK-2 and Sheet SK-3, dated 17 May 2016, provided in the solicitation. A centralized dewatering station location is not provided in the solicitation.

Q14 – Can dewatered material be dumped on the ground for staging/loading or must it be loaded directly into trucks or containers?

A14 - See Section 2.5 Handling and Disposal of Solids, Cake Material Production, of the performance work statement included in the solicitation. “Cake material resulting from the filter presses shall be carried to leak-proof trucks and/or leak-proof roll-off bins. Once the truck or roll-off is full, it shall be immediately replaced so as not to halt progress of the dewatering operation. At no time during the operation will the cake material be stockpiled or stored awaiting removal.”

Q15 - Is the sludge currently approved for disposal or reuse at any facilities? Can you provide us the disposal/reuse sites utilized the last time the Reservoirs and Clearwells were cleaned-out?

A15 – Per the scope of work provided in the solicitation, the Contractor is responsible for the testing, handling and disposal of the materials removed from the facilities. The Contractor is responsible for providing a permitted site for the disposal of all materials.

Q16 - With regard to SBA participation, is the contractor required to subcontract out 30% of the work or is the figure a goal? Since most of the work necessary for this contract is performed by the contractor’s personnel and equipment, subcontracting out 30% will be difficult and costly.

A16 – The solicitation requests that each vendor suggest a SBA participation plan. There are no required participation levels, but all plans will be evaluated for selection.

Q17 - What is the expected flow rate (GPM) of the influent sluice gates that leak after draining the clearwells/reservoirs?

A17 – The Contractor shall assume that any sluice gate leakage in the Dalecarlia 15 MG Clearwell, the McMillan North Clearwell, the McMillan South Clearwell and the 1st High Reservoir will be able to drain out of the structure via the gravity drain. However, the Contractor is required at all times to prevent solid waste materials from discharging from the structure via the gravity drain. For bid purposes, the Contractor shall assume that two 6” pumps will be required to control leakage for the Dalecarlia 30 MG Clearwell and to dewater the portion of the work required in the influent and effluent channel of the 15 MG Clearwell, and one 4” pump will be required for each of the 2nd High Reservoir and 3rd High Reservoir structures to handle sluice gate leakage.

Q18 – Please provide additional dimensional information pertaining to the lime mixing chamber at the McMillan North Clearwell.

A18 – Delete Sheet SK-5 dated 17 MAY 2016 and substitute attached Sheet SK-5, dated 13 June 2016. Delete Sheet SK-9 dated 17 APR 2016 and substitute attached Sheet SK-9, dated 10 June 2016.

Q19 – Please clarify the Performance Work Statement reference to “three (3) days” in Section

2.9 North Clearwell, item e.

A19 – A three (3) day outage of the McMillan Plant will be allowed in order to dewater, enter, clean, and vacate the Lime Mixing Chamber for the cleaning work contained therein. This outage will coincide with the performance of the work in the North Clearwell.

(End of Summary of Changes)