G24_Bid_Abstract_.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Dalecarlia Basin Collector Modifications Federal contract opportunity
- Solicitation number
- W912DR-16-B-0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR-16-B-0022-0002.pdf | ||
| W912DR-16-B-0022-0001.pdf | ||
| Site_Visit_Sign_In_Sheet.pdf | ||
| Attachments.pdf | ||
| Drawings.pdf | ||
| W912DR-16-B-0022.pdf | ||
| Specifications_050216.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chart1
SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 626703 799732 1426435 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 1029000 613000 1642000 -0.15112150220654991 215565 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 1572000 275000 177000 28000 28000 130000 2210000 -5.9952038369304558E-2 -125000 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 900000 641700 1541700 -8.0806345890278908E-2 115265 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 1 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 Sheet1 BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification
| LOCATION: Washington, DC | ||||||
| LINE | SERVICE | IGE | IMI, INC | EMH ENVIROMENTAL | NORAIR ENGINEERING | AMERICAN CONTRACTING & ENVIROMENTAL SERVICES |
CLIN 0001 All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as
| specified. | $626,703.00 | $1,029,000.00 | $877,250.00 | $900,000.00 | $909,090.00 |
| CLIN 0002 | All costs in connection with modifications |
to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as
| specified. | $799,732.00 | $613,000.00 | $677,250.00 | $641,700.00 | $713,210.00 | ||
| TOTAL = | $1,426,435.00 | $1,642,000.00 | $1,554,500.00 | $1,541,700.00 | $1,622,300.00 | ||
| PERCENT ABOVE/BELOW IGE = | -15.11% | -8.98% | -8.08% | -13.73% | |||
| AMOUNT OVER IGE = | $215,565.00 | $128,065.00 | $115,265.00 | $195,865.00 |