G24_Bid_Abstract_.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Dalecarlia Basin Collector Modifications
Solicitation number
W912DR-16-B-0022
Issued by

View the file

Other files

File Type Posted
W912DR-16-B-0022-0002.pdf PDF
W912DR-16-B-0022-0001.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Attachments.pdf PDF
W912DR-16-B-0022.pdf PDF
Specifications_050216.pdf PDF
Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chart1

SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 626703 799732 1426435 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 1029000 613000 1642000 -0.15112150220654991 215565 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 1572000 275000 177000 28000 28000 130000 2210000 -5.9952038369304558E-2 -125000 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 900000 641700 1541700 -8.0806345890278908E-2 115265 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 1 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 Sheet1 BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification

LOCATION: Washington, DC
LINESERVICEIGEIMI, INCEMH ENVIROMENTALNORAIR ENGINEERINGAMERICAN CONTRACTING & ENVIROMENTAL SERVICES

CLIN 0001 All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as

specified.$626,703.00$1,029,000.00$877,250.00$900,000.00$909,090.00
CLIN 0002All costs in connection with modifications

to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as

specified.$799,732.00$613,000.00$677,250.00$641,700.00$713,210.00
TOTAL =$1,426,435.00$1,642,000.00$1,554,500.00$1,541,700.00$1,622,300.00
PERCENT ABOVE/BELOW IGE =-15.11%-8.98%-8.08%-13.73%
AMOUNT OVER IGE =$215,565.00$128,065.00$115,265.00$195,865.00