G24_Bid_Abstract_.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Dalecarlia Basin Collector Modifications Federal contract opportunity
Solicitation number
W912DR-16-B-0022
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

View the file

Other files for this federal contract opportunity

Other files attached to Dalecarlia Basin Collector Modifications, newest first.
File Type Posted
W912DR-16-B-0022-0002.pdf PDF
W912DR-16-B-0022-0001.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Attachments.pdf PDF
Drawings.pdf PDF
W912DR-16-B-0022.pdf PDF
Specifications_050216.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chart1

SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 626703 799732 1426435 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 1029000 613000 1642000 -0.15112150220654991 215565 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 1572000 275000 177000 28000 28000 130000 2210000 -5.9952038369304558E-2 -125000 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 0 900000 641700 1541700 -8.0806345890278908E-2 115265 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 1 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 SERVICE All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as specified. All costs in connection with modifications to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as specified. TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification LOCATION: Washington, DC LINE CLIN 0001 CLIN 0002 Sheet1 BID ABSTRACT FOR W912DR-16-B-0022 Dalecarlia Basin Collector Modification

LOCATION: Washington, DC
LINESERVICEIGEIMI, INCEMH ENVIROMENTALNORAIR ENGINEERINGAMERICAN CONTRACTING & ENVIROMENTAL SERVICES

CLIN 0001 All costs in connection with the modifications to Sedimentation Basin 1 and 2, and the Electrical Substation Building, complete as shown on the drawings and as

specified.$626,703.00$1,029,000.00$877,250.00$900,000.00$909,090.00
CLIN 0002All costs in connection with modifications

to Sedimentation Basin 3 and 4, and Dalecarlia Residuals Pumping Station, complete as shown on the drawings and as

specified.$799,732.00$613,000.00$677,250.00$641,700.00$713,210.00
TOTAL =$1,426,435.00$1,642,000.00$1,554,500.00$1,541,700.00$1,622,300.00
PERCENT ABOVE/BELOW IGE =-15.11%-8.98%-8.08%-13.73%
AMOUNT OVER IGE =$215,565.00$128,065.00$115,265.00$195,865.00