W912DR-16-B-0001-0001.pdf
PDF 59 KB Posted
- Solicitation number
- W912DR-16-B-0001
About this file
Amendment 0001 to Solicitation W912DR-16-B-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| E-15_Award_EBS_W912DR-16-C-0014.pdf | ||
| D-1_Abstract_of_Bids.pdf | ||
| W912DR-16-B-0001-0002.pdf | ||
| Site_Visit_Sign-In_Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81W3G53286795
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: REPAVE MCNAMARA HEADQUARTERS COMPLEX (HQC) PARKING LOTS AND ROADS, FORT BELVOIR, VA
CONTINUED ON NEXT PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jan-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-16-B-0001
X 9B. DATED (SEE ITEM 11)
21-Dec-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jan-2016
CODE
US ARMY CORPS OF ENGINEERS BALTIMORE DIS
10 SOUTH HOWARD STREET
ROOM 7000
BALTIMORE MD 21201-2536
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR-16-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
1. SECTION 00800 - WAGE DETERMINATION: An updated Wage Determination, VA160135, dated 01/08/2016 is attached below.
2. CONTRACTOR INQUIRIES: Enclosed in this amendment are the USACE responses to Contractor inquiries, attached below.
3. POINT OF CONTACT: The POC for this amendment is Alex Heinzel at (410) 962-6037.
(End of Summary of Changes)
General Decision Number: VA160135 01/08/2016 VA135
Superseded General Decision Number: VA20150135
State: Virginia
Construction Type: Highway
Counties: Alexandria*, Arlington, Clarke, Culpeper, Fairfax, Fairfax*, Falls Church*, Fauquier, Fredericksburg*, King George, Loudoun, Manassas Park*, Manassas*, Prince William, Spotsylvania, Stafford and Warren Counties in Virginia.
*INDEPENDENT CITIES
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016
SUVA2013-010 09/20/2013
Rates Fringes
ASBESTOS WORKER..................$ 16.91
CARPENTER (STRUCTURE)............$ 16.02
CEMENT MASON/CONCRETE FINISHER...$ 21.71
ELECTRICIAN......................$ 29.27
FORM SETTER......................$ 14.00
IRONWORKER, REINFORCING..........$ 34.18
IRONWORKER, STRUCTURAL...........$ 19.13
LABORER
Asphalt Raker...............$ 15.85 Blaster.....................$ 35.00 Construction Worker I (Skilled Laborer)...........$ 15.77 Construction Worker II (Laborer)...................$ 14.14 Deckhand....................$ 13.00 Fence Erector...............$ 14.41 Flagger.....................$ 13.64 Grade Checker...............$ 13.42 Guardrail Erector...........$ 22.15 Landscape Worker............$ 11.97 Pipe Layer..................$ 19.00 Power Tool Operator.........$ 15.00 Sign Erector................$ 25.00
MASON (STRUCTURE)................$ 17.64
PAINTER..........................$ 15.00
PLUMBER..........................$ 25.00
POWER EQUIPMENT OPERATOR:
Air Compressor..............$ 13.50 Asphalt Distributor.........$ 18.64 Asphalt Paver...............$ 19.35 Backhoe.....................$ 20.59 Boom/Auger..................$ 20.29 Bulldozer (Utility).........$ 15.50 Bulldozer...................$ 20.40 Concrete Finish Machine Operator....................$ 18.54 Concrete Finisher Machine Screed Operator (Bridge)....$ 14.60 Concrete Paving Machine Operator....................$ 20.75 Concrete Pump Operator......$ 33.00 Concrete Saw Operator.......$ 16.00 Crane, Derrick, Dragline (1 cm & under)..............$ 24.53 Crane, Derrick, Dragline (over 1 cm).................$ 25.00 Crusher Tender..............$ 14.25 Drill Operator..............$ 15.70 Excavator (Gradall).........$ 19.32 Front End Loader (2 cm & under)......................$ 19.00 Front End Loader (over 2 cm).........................$ 20.42 Hydro Seeder................$ 17.13 Log Skidder Operator........$ 18.50 Mechanic....................$ 21.75 Mobile Mixer................$ 17.00 Motor Grader (Fine Grade)...$ 27.25 Motor Grader (Rough Grade)..$ 13.58 Oiler, Greaser..............$ 14.00
Pavement Marking Operator...$ 17.00 Pavement Marking Truck Operator....................$ 16.72 Pavement Planing Groundman..$ 19.75 Pavement Planing Operator...$ 19.25 Pile Driver Operator........$ 20.35 Pile Driver, Leadsman.......$ 21.32 Pipe Boring/Jacking Machine Operator............$ 16.00 Plant Operator..............$ 14.88 Roller (Finish).............$ 17.94 Roller (Rough)..............$ 17.06 Scraper Pan Operator........$ 13.00 Shot Blast Machine Operator.$ 16.02 Shovel Operator (2 yds and under)......................$ 16.00 Shovel Operator (over 2 yds)........................$ 25.00 Slip-Form Paver.............$ 21.00 Slurry Seal Paver Machine Operator....................$ 13.75 Slurry Seal Paver Truck Operator....................$ 10.32 Stabilizer Operator.........$ 15.70 Stone-Spreader..............$ 13.35 Subgrade Machine Operator...$ 19.00 Tractor Operator, Crawlers..$ 12.47 Tractor Operator, Utility...$ 12.25 Trenching Machine...........$ 29.87 Vacuum Machine..............$ 18.20
TRAFFIC SIGNALIZATION:
Traffic Signal Installation......$ 21.16
TRUCK DRIVER
Fuel & Lubricant Service Truck Driver................$ 17.73 Transit Mix Truck Driver....$ 15.00 Truck Driver (Multi-Rear Axle).......................$ 16.69 Truck Driver (Single Rear Axle).......................$ 17.50 Truck Driver (Tandem Rear Axle).......................$ 16.91 Truck Driver, Heavy Duty....$ 17.29
WELDER...........................$ 18.15
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Responses to Contractor Request for Information – Amendment 0001
1. Q: Is the Contractor required to have an Engineered stamped set of Erosion and Sediment Control phasing plan?
A: The contractor is not required to develop erosion & sediment control plans that are signed & sealed by a professional engineer.
2. Q: Is the Environmental Protection Plan and/or Traffic Maintenance Plan required to be Engineer stamped?
A: The Environmental Protection Plan and/or Traffic Maintenance Plans do not require the seal & signature of a professional engineer.
3. Q: Can the Project Superintendent act as the Contractor Quality Control Manager?
A: No. Per 01 45 00.00 10 Para 3.4.2; "The CQC System Manager must be assigned no other duties."
4. Q: Can the Project Manager act as the Site Safety and Health Officer (SSHO) or does the position require a full time person?
A: No. Per 01 35 26 Para 1.5.1.1; "The SSHO shall not be assigned additional duties."
5. Q: Are we allowed to utilize DLA water for the project?
A: Contractor may utilize local water source to complete work. Refer to specification section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS for requirements.
6. Q: What are the traffic detection ground sensor loop and sensor loop installation requirements?
A: Refer to Sheet CP 101, Note 6 and Section 31 00 00 for VDOT Manual.
7. Q: When is the Family Day scheduled?
A: Reference Section 01 14 00 Paragraph 1.3.3.
8. Q: Will any Federal Holidays impact our work?
A: Reference Section 01 14 00 Paragraph 1.3.3.
9. Q: Are utilities required to be GIS located?
A: Per General Notes #8 and #9 on sheet C-001 NOTES, LEGEND, AND ABBREVIATIONS, the contractor is required determine the location and to protect all existing utilities within the limits of disturbance. Contractor shall determine the appropriate means for locating all below grade utilities and for documenting as-built conditions at completion of work.
10. Q: Please clarify the extent of the Design of the Grading Plan? Will this plan need to be approved by DPW? Will the contractor need to provide Design services for this?
A: The intent of the grading plan is match existing grade of the pavement to the extent possible, while ensuring positive drainage to existing drainage inlets is provided. Ponding of storm-water runoff is not to occur upon repaving of the designate areas. The Grading & Drainage Plans do not require the approval of DPW and the contractor does not need to include design services for this.
11. Q: The intent of the grading plan is match existing grade of the pavement to the extent possible, while ensuring positive drainage to existing drainage inlets is provided. Ponding of stormwater runoff is not to occur upon repaving of the designate areas. The Grading & Drainage Plans do not require the approval of DPW and the contractor does not need to include design services for this.
A: Requirements for erosion and sediment control are identified on sheets CG101 through CG502.
Contractor does not need to provide design services for additional measures.
12. Q: Is the contractor to reestablish or stabilize the contractor lay down yard/trailer yard after the Project is complete?
A: Refer to sheet notes 1 through 9 on sheet CG102 CONTRACTOR STAGING AREA for general description and requirements pertaining to the staging area.
13. Q: Please confirm the contractor is required to provide computer equipment and trailer for the owner?
A: Owner trailer is not required.
14. Q: Please confirm Bid Opening time and location?
A: See solicitation.
15. Q: Please confirm no Technical Proposal is required for the Bid. i.e. No Past Performance, Resumes of Key Personnel, Schedule, etc?
A: No technical submission is required for this solicitation.
16. Q: Please confirm basis of award if Lowest Price or “Low Bid?”
A: See solicitation.
| W912DR-16-B-0001-0001 |
| VA135_8Jan2016 |
| RFI Answers_AMD01 |
File details come from the government source that posted it. Updated .