D-1_Abstract_of_Bids.pdf

PDF 80 KB Posted

Attached to
Repave McNamara Headquarters Complex (HQC) Parking Lots and Roads
Solicitation number
W912DR-16-B-0001
Issued by

View the file

Other files

File Type Posted
E-15_Award_EBS_W912DR-16-C-0014.pdf PDF
W912DR-16-B-0001-0002.pdf PDF
W912DR-16-B-0001-0001.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER 2. DATE ISSUED DATE OPENED PAGE OF 02-Feb-16 1 of 2

4. ISSUING OFFICE Name and title of Certifying Official (Type) I CERTIFY that I have opened, read, and

USACE, BALTIMORE DISTRICT recorded on this abstract all offers Signature Date Signed 02-Feb-16 10 SOUTH HOWARD STREET, ROOM 7000 received in response to this solicitation.

BALTIMORE, MD 21201 Contracting Officer: GARY A. FAYKES

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

6. NUMBER OF AMENDMENTS ISSUED: 2 (Two) X C. REASONABLE CONTRACT C. Amendment Acknowledged C. Amendment Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

All costs in connection with the Construction of the Project Titled “Road Repavement at DLA Headquarters” Fort Belvoir, VA complete as shown on the drawings and specified. 1 JOB L.S. 5,153,344.00$ 3,107,307.00$ 2,901,036.00$

All costs in connection with materials, labor and construction required to construct Removal & Replacement of Aggregate Base in accordance with the Contract Documents 450 C.Y. 136.40$ 61,411.00$ 60.00$ 27,000.00$ 52,200.00$

All costs in connection with materials, labor and construction required to construct Removal & Replacement of Subgrade Soils in accordance with the Contract Documents. 400 C.Y. 136.40$ 54,587.00$ 80.00$ 32,000.00$ 40,000.00$

0004 Removal of contaminated soils.

20 C.Y. 275.00$ 5,500.00$ 100.00$ 2,000.00$ 10,000.00$

TOTAL BASE BID AMOUNT

5,274,842.00$ 3,168,307.00$ 3,003,236.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

No. 2

Espina Paving, Inc.

15441 Farm Creek Drive Woodbridge, VA 22191

21-Dec-15W912DR-16-B-0001

Repave McNamara Headquarters Complex (HQC) Parking Lots and Roads, Fort Belvoir, VA No. 1

9. OFFERS

Yes

Bid Bond 20% Bid Bond 20%

Semper Fi Contracting LLC.

25592 Little Krepps Court

Aldie, VA 20105

Yes

1. SOLICITATION NUMBER: W912DR-16-B-0001 PAGE 2 OF 2

ABSTRACT OF OFFERS

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs in connection with the Construction of the Project Titled “Road Repavement at DLA Headquarters” Fort Belvoir, VA complete as shown on the drawings and specified. 1 JOB 3,237,400.00$ 3,509,398.87$ $3,651,006.11 3,246,940.00$

All costs in connection with materials, labor and construction required to construct Removal & Replacement of Aggregate Base in accordance with the Contract Documents. 450 C.Y. 51,750.00$ $144.00 64,800.00$ $48,213.00 65,700.00$

All costs in connection with materials, labor and construction required to construct Removal & Replacement of Subgrade Soils in accordance with the Contract Documents. 400 C.Y. 44,000.00$ $144.00 57,600.00$ $28,168.00 58,400.00$

0004 Removal of contaminated soils.

20 C.Y. 10,000.00$ $360.00 7,200.00$ $3,947.20 17,520.00$

TOTAL BASE BID AMOUNT

3,343,150.00$ 3,638,998.87$ $3,731,334.31 3,388,560.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236OPTIONAL FORM 1419 (11-88)

OFFERS (Continued)

Repave McNamara Headquarters Complex (HQC) Parking Lots and Roads, Fort Belvoir, VA No. 6No. 3 No. 4

EDC, LLC.

1108 Good Hope Road, SE

Washington, DC 20020

Charles Deweese Construction Inc 765 Industrial Bypass North

Franklin, KY 42134

M&F Concrete Inc. 9515 Contractors Ct. Suite 100

Manassas, VA 20109

Innoko Government Services, LLC P.O. Box 243893

Anchorage, AK 99524

No. 5

Yes

Bid Bond 20%

Yes Yes Yes

Bid Bond 20% Bid Bond 20% Bid Bond 20%

2016-02-02T14:58:38-0500
FAYKES.GARY.A.1086691600